Dodi, I've been playing with the DHL tracking thing for the past few days, and it's nice. It seems that, for the London packages, they get shipped out in the evening, travel for a day, then arrive at the embassy about lunch time the day after that. Mine was sent out on Monday and arrived in London yesterday, so I plan on calling the DOS tomorrow to see if they've sent out P3 yet. Yours will likely arrive tomorrow!

Note, embassy also needs time to enter your case into their system before you can schedule interview

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

Note, embassy also needs time to enter your case into their system before you can schedule interview

We are not at the interview scheduling stage yet, just the P3. London has been sending out the P3 letters pretty quickly, within a day or two of receiving the package from the NVC, and that is what I'm calling to check on, not an interview date.

Edited by marlea

K-1

I-129F NOA1 : June 1, 2010

I-129F NOA2 : June 28, 2010

Interview Date : Sept 28, 2010

Wedding: Apr 16, 2011

AOS

Approved : July 25, 2011

Link to comment
Share on other sites

The packet I sent Express Mail Guaranteed for him with all of his paperwork in it won't even arrive there till tomorrow or Monday, so that's perfect timing!! :dance:

I'm really excited. Things are moving so fast!! He could have an interview next onth if things keep going at the current rate!!

Angela & Peter

usa.gift4527.gifuk.gif

K-1 Process (Condensed)

02/01/10: Took atty's bad advice and applied for B2 visa

02/16/10: B2 Visa Interview: DENIED - K1 Required

05/07/10: Atty sent I-129F Petition to Chicago Lockbox

05/31/10: Atty rec'd Petition back due to wrong location

06/01/10: I-129F pkg sent to VSC

06/11/10: NOA1 Rec'd/Touch

09/17/10: INTERVIEW = APPROVED

10/22/10: Marriage in the US

AOS Process

11/13/10: Mailed Packet to CHI Lockbox

11/18/10: NOA1 Rec'd via Text

11/20/10: Soc. Sec. fixed mistake/Processed SSN

11/23/10: Rec'd SSN

11/23/10: Touch

12/09/10: RFE - Supposedly didn't sign I-864 when I KNOW I did. (Copies to prove it.)

12/20/10: Biometrics Appt

12/20/10: RFE Response Rec'd/Processing Resumed

12/27/10: Transferred to CSC

12/29/10: Contacted Senator re: EAD Expedite Request

12/30/10: AOS Touch

12/30/10: EAD & AP Approved (Card Production Ordered)

01/05/11: AOS Touch (Rec'd @ CSC)

01/06/11: AOS Touch/EAD Mailed

01/08/11: EAD & AP Rec'd

01/10/11: AOS Touch

01/14/11: EAD Touch

01/26/11: AOS APPROVED!!

02/02/11: Green Card Received

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

We are not at the interview scheduling stage yet, just the P3. London has been sending out the P3 letters pretty quickly, within a day or two of receiving the package from the NVC, and that is what I'm calling to check on, not an interview date.

Ohh I see, it's different story in Kiev. You don't need to wait for P3 to scheduled the interview. It can be downloaded from their web site. As soon your case hits their system you can schedule it.

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

I'm really excited. Things are moving so fast!! He could have an interview next onth if things keep going at the current rate!!

I just sent my fiance's stuff to him yesterday, but the stuff I sent is just supporting documentation, not the actual forms, so he can send the forms back pretty much any time now. I think he will most likely send them next week. And from what I can tell from other's timelines, I'm expecting an interview date in September sometime. Considering I was expecting our NOA2 sometime around September originally, this is pretty great!

And at this rate, who knows, your fiance and mine might have their interviews on the same day!

K-1

I-129F NOA1 : June 1, 2010

I-129F NOA2 : June 28, 2010

Interview Date : Sept 28, 2010

Wedding: Apr 16, 2011

AOS

Approved : July 25, 2011

Link to comment
Share on other sites

Our NOA2 approved the 12th....mailed out the 13th received the 16th. Honestly I don't think I could have taken them taking their time with this leg of the journey....especially after the NOA2 dragging along. Hope they get their fingers out for y'all.

You can stand me at the gates of hell, but I wont back down.
AOS Filed 02/01 however used wrong forms
refiled 2/22
NOA 3/1
BIO 3/18
Transfer 3/14
Touched 3/18
AP Approved 4/14(WASN'T UPDATED ON SIGHT OR TEXED TILL 4/18)
EAD Approved 4/14(WASN'T UPDATED ON SIGHT OR TEXED TILL 4/18)
GREEN CARD APPROVED WITH NO
INTERVIEW AND NO HAVING
TO TRANSCRIBE HIS SHOT RECORDS! 4/18!(WASN'T NOTIFIED TILL 4/19)

Applied for lifting of conditions 02/27/2013
NOA1 March 4
BIO April 2

RFE received 07/25

Returned RFE recieved 08/19

NOW WAITING WITH BAITED BREATH

APPROVED 9/9/2013

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ukraine
Timeline

I just got a letter from NVC telling they got my case, 2 days after getting NOA2 hard copy. The letter is dated for the same day I got the NOA2 hard copy. That was fast!

Uniting for Ukraine

1-134 submitted - 4/25/2022

I-134 approved - 4/29/2022

Email received by beneficiary - 5/4/2022

Beneficiary submits data to USCBP - 5/4/2022

Received information about travel authorization from USCBP - 5/6/2022 (Approval but no Travel Authorization Document)

Travel Authorization Document- 5/16/2022

 

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

still no case number :( Not sure why it's taking that long for NVC to receive.

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

I had my NOA2 on July 1 as well and it was in the hands of NVC and sent to my consulate within 7 days. I'd call them.

See profile for our K-1 Visa/AOS story from 2010-2011Apparently we love USCIS/NVC so much we left and are doing it again! This time giving IR-1 a whirl. Rock on immigrators.

07/09/2014 sent in IR-1 packet to Chicago Lockbox

07/16/2014 NOA1

07/17/2014 check cashed by USCIS

10/01/2014 found out we are expecting baby #2 June 2015!

12/15/2014 NOA2

12/30/2014 Case received by NVC

03/23/2015 Received Case and Inv # from NVC after many calls and bogus excuses.

03/24/2015 AOS payment accepted by NVC

04/09/2015 IV payment finally accepted by NVC after the set the wrong fee and took weeks to correct it.

*many more delays thanks to the agency processing my fingers prints to the RCMP and the post office losing our mail*

05/20/2015 Packet sent to NVC via UPS, eta May 28.

06/16/2015 Baby #2 due - homebirth in Scottsdale, AZ

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

I had my NOA2 on July 1 as well and it was in the hands of NVC and sent to my consulate within 7 days. I'd call them.

Well that makes me feel a lot better :)

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

Well that makes me feel a lot better :)

I keep calling them every day, sometimes even 2 twice a day. Not sure what to do at this point. USCIS tells they don't have it, so as NVC

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

NVC still have no records of my file. I suspect VSC forgot to sent my casefile :(

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

I just spoke to immigration officer at USCIS and he told me that my file was transferred to New York office for processing before it's forwarded to NVC Immigration Office. Why would they do that? Is this something new?

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

Something sounds fishy. You need to call the DOS and if they can't help you, call the USCIS and ask for a Supervisor. They shouldn't have sent your case to NY. NY doesn't even handle K1's.

Angela & Peter

usa.gift4527.gifuk.gif

K-1 Process (Condensed)

02/01/10: Took atty's bad advice and applied for B2 visa

02/16/10: B2 Visa Interview: DENIED - K1 Required

05/07/10: Atty sent I-129F Petition to Chicago Lockbox

05/31/10: Atty rec'd Petition back due to wrong location

06/01/10: I-129F pkg sent to VSC

06/11/10: NOA1 Rec'd/Touch

09/17/10: INTERVIEW = APPROVED

10/22/10: Marriage in the US

AOS Process

11/13/10: Mailed Packet to CHI Lockbox

11/18/10: NOA1 Rec'd via Text

11/20/10: Soc. Sec. fixed mistake/Processed SSN

11/23/10: Rec'd SSN

11/23/10: Touch

12/09/10: RFE - Supposedly didn't sign I-864 when I KNOW I did. (Copies to prove it.)

12/20/10: Biometrics Appt

12/20/10: RFE Response Rec'd/Processing Resumed

12/27/10: Transferred to CSC

12/29/10: Contacted Senator re: EAD Expedite Request

12/30/10: AOS Touch

12/30/10: EAD & AP Approved (Card Production Ordered)

01/05/11: AOS Touch (Rec'd @ CSC)

01/06/11: AOS Touch/EAD Mailed

01/08/11: EAD & AP Rec'd

01/10/11: AOS Touch

01/14/11: EAD Touch

01/26/11: AOS APPROVED!!

02/02/11: Green Card Received

Link to comment
Share on other sites

Filed: K-1 Visa Country: Ukraine
Timeline

In the past several weeks I called everyone you can think of; DOS, NVC, USCIS, Congressman, Senators even consulate at Kiev. Spoke to secretaries, operators, officers. Been yelled at, hung up, told it will take up to 90 days for NVC to get receive my case and when I tried to argue that this is not true, yelled at and hang up :)

The only legit answer I got in the last months was today. Immigration officer at USCIS that my case was forwarded to New York Immigration office. When I asked him why? He told me sometimes when they get busy for faster processing (faster??? what processing???) they forward approved petitions to local offices before it reaches NVC.

He gave me confirmation number, took my email address and told me someone will get back to me within 10 days.

Nov 25 2009 - While on vacation in Ukraine met my fiancee

Feb 20 2010 - Spent 8 amazing days in Caribbeans with my fiancee

April 16 2010 - Traveled to Ukraine

April 22 2010 - Returned to US

April 27 2010 - K1 filed

April 29 2010 - NOA 1

May 4 2010 - Touch

June 30 2010 - Touch

June 30 2010 - NOA 2!!!

July 06 2010 - NOA 2 Hard copy received

July 11 2010 - NVC still still didn't receive approved petition from USCIS. Sent inquiry via email to NVC regarding my case

July 13 2010 - USCIS claims that they sent my petition on July 6th to NVC. Sent inquiry to USCIS.

July 21 2010 - USCIS sent email saying approved petition was lost in transit, asking to submit duplicate copy in order to reconstruct my case

July 29 2010 - Duplicate copy sent to Vermont Service Center.

August 10 2010 - USCIS sent email. Original petition found

August 10 2010 - second NOA 2 issued.

August 12 2010 - NVC received petition

August 13 2010 - NVC forwarded the case to Kiev embassy !!!

September 6 2010 - Medical Exam

September 27 2010 - INTERVIEW!!!

September 27 2010 - Visa Approved!!!

October 5 2010 - Arrived to US!!!

4dc0fd55f0.gif 828551138d.gif

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...