Hello everybody! :innocent: Welcome to the July NVC thread. Feel free to ask any questions you might have as the people in here (well, in the future anyway) have varying levels of knowledge about the NVC process. I know that personally I will be here all through July at least. I hope the rest of you who come in here don't have to be stuck here.

There are a few days left in June for those still waiting for interviews. I hope they get them! :yes:

:ot:

(L):star: Shout out to my Marchers and Marchetttes (plus John): I hope to see all of you here very soon!!!!!!! :star:(L)

Best of luck to everyone!!! :thumbs:

I hope that July is a good month for pushing through the NVC with few delays and RFE's.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: FB-1 Visa Country: Australia
Timeline

I think the first couple of days would be good for NVC to give me my Interview Date. :bonk:

The Long Wait...

Unmarried Son of US Citizen OVER 21

[dd/mm/yy]

USCIS

xx/03/05 - I130 Sent

24/03/05 - NOA1 Received

[many moons later]

12/03/09 - NOA2 Received

Your I-130 was approved in 1448 days from your NOA1 date.

NVC

05/04/10 - Received I-864 Bill

23/04/10 - IV Fee Bill Received

18/05/10 - DS230 Sent

11/06/10 - July 2010 Bulletin shows PD Current - WOOT!

14/06/10 - Operator and AVR Update to say CASE COMPLETE 10/6/10

16/06/10 - SIF

CONSULATE

29/06/10 - P4

07/07/10 @ 11:00am - Medical - COMPLETE

03/08/10 @ 9:00am 11:00am - Interview!(SYD) - APPROVED!

USA

13/09/2010 - POE @ LAX

24/09/2010 - Welcome Letter from USCIS!

25/09/2010 - Green Card Arrived

07/10/2010 - SSN!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Hello Bextavaz! I hope you get what you want and sooner than expected! :thumbs: Let us know (I know you are in the June NVC as well) so we can celebrate with you.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: FB-1 Visa Country: Australia
Timeline

Hello Bextavaz! I hope you get what you want and sooner than expected! :thumbs: Let us know (I know you are in the June NVC as well) so we can celebrate with you.

That's why I migrated to this thread... I figured my PD isn't current til July, so I'll be in this thread regardless... haha :dance:

The Long Wait...

Unmarried Son of US Citizen OVER 21

[dd/mm/yy]

USCIS

xx/03/05 - I130 Sent

24/03/05 - NOA1 Received

[many moons later]

12/03/09 - NOA2 Received

Your I-130 was approved in 1448 days from your NOA1 date.

NVC

05/04/10 - Received I-864 Bill

23/04/10 - IV Fee Bill Received

18/05/10 - DS230 Sent

11/06/10 - July 2010 Bulletin shows PD Current - WOOT!

14/06/10 - Operator and AVR Update to say CASE COMPLETE 10/6/10

16/06/10 - SIF

CONSULATE

29/06/10 - P4

07/07/10 @ 11:00am - Medical - COMPLETE

03/08/10 @ 9:00am 11:00am - Interview!(SYD) - APPROVED!

USA

13/09/2010 - POE @ LAX

24/09/2010 - Welcome Letter from USCIS!

25/09/2010 - Green Card Arrived

07/10/2010 - SSN!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Okie dokie! I will be around all July long so you will see me right along with ya to the end.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Aww man ally and moh. I hope NVC decides to be nice to you and give you a date next week! Too bad that your embassy is backed up. I hope after all of the waiting that they don't put you in AP, that would terrible! Waiting sucks but at least we have a place to release some stress and anger without being ridiculed for feeling mad.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

Aww man ally and moh. I hope NVC decides to be nice to you and give you a date next week! Too bad that your embassy is backed up. I hope after all of the waiting that they don't put you in AP, that would terrible! Waiting sucks but at least we have a place to release some stress and anger without being ridiculed for feeling mad.

Considering the fact that he is a MENA man, we expect to get AP. We are hoping and praying we don't after all we have been thru already, but we are expecting it.

As for our date, if the embassy and NVC won't even respond to my congressman's office, I don't know when to expect a date. I will note though, that a lot of Jordan people HAVE gotten dates at the end of the month instead of the 2nd week. I hope this happens for us.

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: Japan
Timeline

Pay attention, non-EP NVC noobs. Here's Christeen's time tested formula to get you through NVC in one piece alive:

Petitioner: Get NVC # + give operator your email IDs + receive AOS fee bill + pay 70$ online + wait to show paid + print cover sheet + send I-864 AOS with all documents and case # written on each page.

Beneficiary: Get NVC# + receive DS3032 + send DS3032+ DS3032 accepted + IV fee bill available to be paid + pay & wait to show paid + print IV cover sheet + mail DS230 package with all original/certified documents

= wait for case complete + wait for interview to be scheduled.

Suggestions:

1) Have the beneficiary mail SIGNED extra DS230s to you so that you have them handy in case something goes wrong. Or you get hit by a dreaded RFE.

2) If you just received your NOA2, THIS is the time to get your tax stuff and police certificates sorted out. Don't waste time on this.

3) Double check the PCC requirements in the regional forums as they are country specific.

4) Check the pinned STUPID RFEs thread in IR-1/CR-1 forum before sending in your packages.

5) Mail your DS230 package to your USC spouse as soon as you get your NOA2. That way he/she can overnight it to NVC as soon as the IV bill clears.

6) Get your taxes, employment letter, paystubs, PCCs, civil documents etc. while you wait for the NOA2.

Currently the # of business days NVC is taking:

3-4 days for NVC to receive your case and assign a case #.

3-4 days to receive emailed links after case # has been assigned and email addresses been given to NVC operator.

1-2 days for the AOS bill to show as PAID.

1-3 days for DS3032 to be accepted.

1-2 days for IV bill to be PAID.

8-11 days for case complete after all your documents have been sent in.

Folks--please make sure your official VJ timelines are up to date. Remember this is our only source of predictions. Thankyou!

NOTE:

If you want to try to move your interview to an earlier day, you MUST wait until your case is forwarded and received by your embassy. From there you must contact your embassy to request to move it. There are no guarantees.

USCIS JOURNEY

12-08-09 - I-130 Delivered to Chicago Lockbox

12-11-09 - Notice of Action (NOA1)

02-25-10 - Notice of Action 2 (NOA2) ~CA service center~

03-23-10 - PCC Applied - GET 04/01

Your I-130 was approved in 76 days from your NOA1 date

NVC JOURNEY

03-03-10 - NVC Case Number Assigned

03-05-10 - Email give

03-09-10 - AOS bill; Agent Email Get

03-10-10 - Paid AOS Bill; Email/Mail DS-3032

03-12-10 - AOS Bill Status: PAID

03-15-10 - IV Bill Email Get; Pay IV Bill

03-16-10 - IV Bill Status: PAID; AOS @ NVC

04-07-10 - IV Pack @ NVC

04-12-10 - IV Pack Enters AVR

04-20-10 - Log-in Fail

04-21-10 - Case Complete

04-30-10 - Interview Date Assigned

05-07-10 - NVC Forwards Case to Embassy, Tokyo

Your case was complete in 50 days at NVC

EMBASSY JOURNEY

04-16-10 - Medical Exam ($400) - PASSED

05-10-10 - Embassy Receives Case from NVC

06-28-10 - INTERVIEW - Moved

06-21-10 - INTERVIEW - APPROVED!

06-22-10 - Visa Received

Your interview took 192 days from your I-130 NOA1 date

USA JOURNEY

07-05-10 - US Entry

07-26-10 - Request SSC @ SS office

07-28-10 - Welcome Letter (2nd on 8/9)

08-02-10 - SSC GET

08-12-10 - Green Card GET -38 days

04-05-2012 - File I-751: APPROVED 10/17

nihonamerica.jpg

Link to comment
Share on other sites

From my experience the # of business days NVC is taking:

7 days for NVC to receive your case and assign a case #.

Same day to receive emailed links after case # has been assigned and email addresses been given to NVC operator.

2 days for the AOS bill to show as PAID.

USCIS IR1/CR-1 CSC

02-24-2010 - I-130 Sent: February 24th, 2010

06-17-2010 - NOA2

Your I-130 was APPROVED in 107 days from your NOA1 date.

06-24-2010 - NVC Case Number Assigned

08-24-2010 - Sign in Fail - Case COMPLETE in 60 days

10-27-2010 - INTERVIEW Riyadh

11-27-2010 - VISA issued

01-06-2011 - POE JFK

01-27-2011 - Welcome letter

01-28-2011 - Green came via Priority mail

01-06-2011 - GC Issue Date

02-05-2011 - GC Received

02-10-2011 - Applied for SSN at local office

02-19-2011 - SSN Received by mail

10-06-2012 (?) - GC Extend Date

01-06-2013 - GC Expires Date

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Yeah, good one March 2010. The dates of how long it takes vary a bunch. But looking at other people's time lines from the last 3 months or so, it is more like March2010 says. Thinking that it will only take 3 days for a case number and then panicking when you don't have one is useless. A week is what to expect now. I just go by what I have read on here and stuff from LingChe and what seems right. Been fine so far.

Every guide is helpful in their own way.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

That's why I migrated to this thread... I figured my PD isn't current til July, so I'll be in this thread regardless... haha :dance:

Ok, somebody has got to explain to me about this "PD" thing.

USCIS IR1/CR-1 CSC

02-24-2010 - I-130 Sent: February 24th, 2010

06-17-2010 - NOA2

Your I-130 was APPROVED in 107 days from your NOA1 date.

06-24-2010 - NVC Case Number Assigned

08-24-2010 - Sign in Fail - Case COMPLETE in 60 days

10-27-2010 - INTERVIEW Riyadh

11-27-2010 - VISA issued

01-06-2011 - POE JFK

01-27-2011 - Welcome letter

01-28-2011 - Green came via Priority mail

01-06-2011 - GC Issue Date

02-05-2011 - GC Received

02-10-2011 - Applied for SSN at local office

02-19-2011 - SSN Received by mail

10-06-2012 (?) - GC Extend Date

01-06-2013 - GC Expires Date

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

March2010,

Bextavaz isn't filing for CR1. The PD is the priority date. For other visa types, the priority date matters as to when they will give you an interview and assign you a visa. There is no real priority date for CR1. Those are always current.

If you look at his time line, you will notice it took almost 4 years to get through USCIS.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

March2010,

Bextavaz isn't filing for CR1. The PD is the priority date. For other visa types, the priority date matters as to when they will give you an interview and assign you a visa. There is no real priority date for CR1. Those are always current.

If you look at his time line, you will notice it took almost 4 years to get through USCIS.

I see. Thank you.

USCIS IR1/CR-1 CSC

02-24-2010 - I-130 Sent: February 24th, 2010

06-17-2010 - NOA2

Your I-130 was APPROVED in 107 days from your NOA1 date.

06-24-2010 - NVC Case Number Assigned

08-24-2010 - Sign in Fail - Case COMPLETE in 60 days

10-27-2010 - INTERVIEW Riyadh

11-27-2010 - VISA issued

01-06-2011 - POE JFK

01-27-2011 - Welcome letter

01-28-2011 - Green came via Priority mail

01-06-2011 - GC Issue Date

02-05-2011 - GC Received

02-10-2011 - Applied for SSN at local office

02-19-2011 - SSN Received by mail

10-06-2012 (?) - GC Extend Date

01-06-2013 - GC Expires Date

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

I'm sure glad it doesn't take 4 years to get through USCIS for CR1's.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...