The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

<07-05-06> sent out K-1 application

<07-12-06> K-1 recieved (transferred to CSC from Nebraska)

<07-17-06> 1st NOA1 recieved

<07-25-06> Touched

<09-18-06> Touched and approved

<10-20-06> Case sent to Bangkok embassy (NOA 2 Recieved)

<10-23-06> Case arrived at Bangkok Embassy (9:53 a.m)

<11-01-06> Packet 3 shipped from BKK

<11-15-06> Packet 3 sent to embassy via express mail (still waiting for packet 3 from embassy)

<12-12-06> Medical exam + Vaccination Done

<12-??-06> Packet 4 Still waiting

<12-28-06> Interview date

<12-29-06> Visa in hand

<01-30-07> POE Seattle, WA

<02-14-07> Applied for SS

<02-17-07> Recieved Packet 3 <----Almost 5 months later (LOL)

<02-24-07> Recieved SS

<02-27-07> Applied for ID

<03-01-07> Officially married<----Wohooo

<03-02-07> Name change @ SSA

<03-12-07> Recieved new SS

<05-02-07> Sent out AOS forms and fee

<06-01-07> Fingerprints done

<08-01-07> Interview date (AOS approved)

<09-15-07> My wife is pregnant

<04-29-09> Our son is born

<05-05-09> I-751 sent

<05-15-09> I-751 Receipt of Notice

Link to comment
Share on other sites

Filed: K-1 Visa Country: Canada
Timeline
The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

Honestly, it's totally 100% random.

Here's what my senator's office got when they asked about the current timeline situation. The congressional liaison said that...

"Each petition is unique and therefore, worked on a case by case basis."

In other words there is no time frame, just patterns that you can follow if you want to put forth the effort of gathering other people's timelines.

Dan & Sheryl (Twin Cities, MN and Calgary, AB Canada)

Feb 29 2004 - Met on LiveJournal.com

July 25 2005 - Things start to get 'romantic'

Nov 11 2005 - Met in person

Dec 31 2005 - Engaged

March 6 2006 - I-129F sent

March 9 2006 - I-129F NOA1

June 10 Case Transfered to CSC - assured by USCIS that NOA1 date would be honored

July 3 2006 - IMBRA RFE in the mail

July 5 2006 - RFE sent with extra evidence (plane tickets, receipts, letters, emails, photos)

July 10 2006 - RFE received

Aug 8 2006 - Congressional inquiry - told 129F cases are processed based on IMBRA RFE

Sept 20 2006 - Called DHS - Was told another RFE was sent three weeks ago

Sept 21 2006 - Local USCIS office claims RFE is a request for 'initial' evidence - RFE must be lost or was never actually sent.

Sept 22 2006 - Congressional inquiry #2- told "We are working on your case, please allow 60 days" ARGGHH

Sept 26 2006 - 6 touches from all my investigating

Oct 16 2006 - Finally received the RFE that's been holding up our case. It's the IMBRA RFE that we already sent in and was verified received!

Oct 17 2006 - Senator Mark Dayton's office finally gets USCIS to pull out petition for special processing.

Oct 24 2006 - FINALLY APPROVED!

Jan 18 2007 - Interview in Vancouver / K-1 received

Jan 23 2007 - Sheryl enters the US with me

Feb 17 2007 - Wedding!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

we have been led to believe (including my senators office) that they are working them more/less in the order or rfe reciept. so, march through around june all kinda got bunched together since the rfe's went out together, or at least close together.

So, timeframe unknown......(yep, lost march soul)

3/11/06 - 3/26/06 Visited my baby in the PI's

3/29/06 - K1 packet recieved at NSC

6/01/06 - Redirected to CSC

6/14/06 - CSC e-mailed confirmation on the reciept of file

6/23/06 - They they sent the IMBRA RFE

7/03/06 - The emailed that the IMBRA RFE went out on 6/23/06

7/03/06 - I received IMBRA RFE

7/05/06 - Touched

7/06/06 - Delivery Confirmation from the Post Office RFE recieved

7/11/06 - Email notification from CSC that IMBRA RFE Recieved

7/12/06 - Touched (but was to respond to an email that only said 'request recieved and will be processed within 30 days. argh)

7/13/06 - Touched

NOA2 September 11!!!

10/18/06 - Received at Embassy

12/23/06 - Recieved package with interview/medical schedule

01/08/06 - CFO interview/(pre-departure class) Complete

1/11/07 & 1/12/07 Medical complete

02/05/07 - Interview!!!

2/7/07 (2/8/07 manila) - Informed we are approved...3 days after interview.

2/12/07 Visa Received

2/16/07 Baby arrives in US!!!!!

4/14/07 Wedding

4/21/07 Filed AOS

Link to comment
Share on other sites

Don't bother with those processing times right now, at this point they are meaningless. We've got people on here who filed first part of June that have been approved. We've also got people who filed back in March and even earlier who are still waiting.

All that is necessary for the triumph of evil is that good men do nothing.

DEAN AND SHERYL

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Thailand
Timeline
<07-05-06> sent out K-1 application

<07-12-06> K-1 recieved (transferred to CSC from Nebraska)

<07-17-06> 1st NOA1 recieved

<07-25-06> Touched

It seems to me that the March applicants are getting the 'short end of the stick' for what ever reason, many people have had approvals that applied in May - pray for those march applicants!

I'm just curious, was your touchn on 7-25 caused by email or phone call, or was it just a 'touch out of the blue'

Bill

I-129f Journey:

2006-07-17 I-129F sent to CSC

2006-07-24 NOA1 (received)

2006-10-05 RFE (received)

2006-10-06 RFE (returned to CSC)

2006-10-23 NOA2

2007-01-29 Visa Approved!

2007-02-17 Ceremony in Thailand

2007-02-21 POE LAX - Fiance and her daughter enter the USA together, Easy-Peasy!

2007-03-05 Wedding in USA

AOS Journey:

2007-06-07 AOS for spouse and daughter sent

2007-06-16 NOA's arrive, (issued on the 13th)

2007-07-05 Biometrics

2007-07-13 Received RFE (Mailed on July 3rd)

2007-08-06 Returned RFE

2007-10-16 Interview date

2007-10-27 Green Cards Received!

ROC (I-751) Journey:

2009-07-24 Joint I-751 for spouse and daughter sent

2009-08-03 Received NOA1 dated 7/27/09

2009-08-03 Received Receipt and one year extension for wife

2009-08-03 Received "Verification Of Incusion Of A Dependent" for step-daughter

2009-08-27 Biometrics

2009-11-13 Green Cards Received

Citizenship Journey:

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Brazil
Timeline

The processing times are messed up right now due to IMBRA and might take a while to get fixed. Just keep looking at when people are getting there NOA2 and that might help you "guess" when your case might be approved.

K-1 Journey*

Nov 2004 Met in Recife

02-01-06 I-129F Sent to VSC

04-26-06 Interview APPROVED!!!!!!!

05-18-06 Eliana arrived in New York

07-22-06 Married in Las Vegas!!!!!

AOS/AP Journey*

07-25-06 I-485 and I-131 Sent to Chicago

08-18-06 Biometrics Appointment (Completed)

10-06-06 AP Approved

10-11-06 AOS Approved (without interview)

10-20-06 Green Card Received!! Done until July 2008

01-27-07 Second Wedding (in Brazil)

I-751 Journey*

07-09-08 I-751 Sent to VSC

09-16-08 Biometrics Appointment (Completed)

02-25-09 Transferred to CSC

03-20-09 Approved (without interview)

03-27-09 Emily is born!!!

04-07-09 Green Card Received!!

11-18-11 Lucas is born!!!

N-400 Journey*

12-15-11 N-400 Sent to Texas

02-09-12 Biometrics Appointmnet (Completed)

03-21-12 Interview (Approved)

03-21-12 Oath Ceremony

PROCESS IS DONE!!!!!!

*See Profile for detailed list of all dates

Link to comment
Share on other sites

Filed: K-1 Visa Country: Mexico
Timeline
The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

If they have one case left from March 6, they do not change their processing dates. And due to IMBRA, they have many many many March cases still left. No way to know when they will get to July - there is no order or logic to the process. They will get to you when they do and pay no attention to the processing dates they post.

Link to comment
Share on other sites

Filed: K-1 Visa Country: Romania
Timeline
The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

Please don't hurt yourself going by what USCIS is stating. It is dust in your eyes! They work by what it's more convenient for their lazy butts.

March 1st - Mailed I129F to Nebraska SC

March6th - NOA1

June 1st - Trasfered to CSC

July 3th - Received IMBRA RFE

July 18th - CSC acknowledges receiving RFE

July 19 - touched

SEPTEMBER 6TH GOT OUR NOA2. GREAT JOY!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Brazil
Timeline

The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

If they have one case left from March 6, they do not change their processing dates. And due to IMBRA, they have many many many March cases still left. No way to know when they will get to July - there is no order or logic to the process. They will get to you when they do and pay no attention to the processing dates they post.

I just got off the phone with the senators office. Apparently this is completely random. The CSC USCIS director decided that the best way to process these going forward is to stuff all the petitions in a pinata, blindfold the temp, and have him whack it with a stick. Whichever petition falls out first, is processed first. If it's too damaged by the stick wacking it gets stuffed back in the pinata for more whacking. I hope this clears things up.

April 1, 2006 - Filed I-129F

April 7, 2006 - NOA1

June 1, 2006 – Touched due to transfer to from NSC to CSC.

July 3, 2006 - IMBRA RFE Recieved in mail

July 6, 2006 - IMBRA RFE sent back to CSC

July 14, 2006 - CSC received RFE

July 15, 2006 - Touched

August 10, 2006 - Touched

August 11, 2006 - Touched

August 12, 2006 - Touched - Second RFE notice

August 14, 2006 - Touched

August 15, 2006 - Touched

August 19, 2006 - Second RFE arrives

August 20, 2006 - RFE reply

August 25, 2006 - Touched - RFE reply received

August 26, 2006 - Touched

August 28, 2006 - NOA2 approved in 144 days

August 29, 2006 - Touched

September 2, 2006 - Physical NOA2 arrives in mail

September 8, 2006 - NVC receives case

September 13, 2006 - NVC sends case to Rio

September 18, 2006 - Physical notice from NVC arrives in mail

September 18, 2006 - Case arrives in Rio

September 26, 2006 - Packet 3 replied to (before receiving it)

September 27, 2006 - Packet 3 response arrives in Rio

September 27, 2006 - Packet 3 arrives at Ana's

October 6, 2006 - Packet 4 arrives at Ana's

October 9, 2006 - Medical

December 5, 2006 - Interview!!

January 13, 2007 - Getting married in Hawaii!!

Praia_do_Forte_Apr_24_2006054resize.jpg

115511272516511.gif

Link to comment
Share on other sites

Filed: K-1 Visa Country: Russia
Timeline

The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

If they have one case left from March 6, they do not change their processing dates. And due to IMBRA, they have many many many March cases still left. No way to know when they will get to July - there is no order or logic to the process. They will get to you when they do and pay no attention to the processing dates they post.

I just got off the phone with the senators office. Apparently this is completely random. The CSC USCIS director decided that the best way to process these going forward is to stuff all the petitions in a pinata, blindfold the temp, and have him whack it with a stick. Whichever petition falls out first, is processed first. If it's too damaged by the stick wacking it gets stuffed back in the pinata for more whacking. I hope this clears things up.

The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

If they have one case left from March 6, they do not change their processing dates. And due to IMBRA, they have many many many March cases still left. No way to know when they will get to July - there is no order or logic to the process. They will get to you when they do and pay no attention to the processing dates they post.

I just got off the phone with the senators office. Apparently this is completely random. The CSC USCIS director decided that the best way to process these going forward is to stuff all the petitions in a pinata, blindfold the temp, and have him whack it with a stick. Whichever petition falls out first, is processed first. If it's too damaged by the stick wacking it gets stuffed back in the pinata for more whacking. I hope this clears things up.

Sound like there is to much WACKING OFF going on and not much work being accomplised. Appears they need to wash their hands and get back to work.

Service Center : Texas Service Center

Consulate : Moscow, Russia

I-129F Sent : 2006-06-09

I-129F NOA1 : 2006-06-26

Touched : 2006-09-18

Notified RFE in the mail 2006-09-29

Notification of Approval 2006-11-07

Link to comment
Share on other sites

Filed: K-1 Visa Country: Mexico
Timeline
I just got off the phone with the senators office. Apparently this is completely random. The CSC USCIS director decided that the best way to process these going forward is to stuff all the petitions in a pinata, blindfold the temp, and have him whack it with a stick. Whichever petition falls out first, is processed first. If it's too damaged by the stick wacking it gets stuffed back in the pinata for more whacking. I hope this clears things up.

Thanks for that update - I think that was the best explanation we've heard lately.

Now if I could only get my hands on that stick and Christina Poulus, the director of CSC, what fun I would have

Link to comment
Share on other sites

Don't bother with those processing times right now, at this point they are meaningless. We've got people on here who filed first part of June that have been approved. We've also got people who filed back in March and even earlier who are still waiting.

Correct, and I'm one of them. Not even a touch since July 6th

05/2005 - Met on line

06/20/05 - first serious e-mails

01/15/06 - traveled to China to meet Yonghua and family

02/24/06 - I-129 F sent (K1 visa) Laguna

03/01/06 - I-129 F delivered at USCIS

03/06/06 - I-129F received date (check processed)

03/07/06 - NOA1 issued

03/10/06 - NOA1 received

06/23/06 - Notice date on RFE

06/28/06 - RFE for IMBRA received and mailed back to CSC

06/30/06 - RFE received at CSC

09/08/06 - NOA2 notice date

09/12/06 - received NOA2 in mail

10/02/06 - received and case number issued at NVC

10/19/06 - Case sent to Consulate in Guangzhou

- update -

05/22/07 - Visa approved

06/15/07 - SO arrives at LAX

07/07/07 - Married

07/24/07 - AOS filed

Link to comment
Share on other sites

Filed: K-1 Visa Country: France
Timeline

I just got off the phone with the senators office. Apparently this is completely random. The CSC USCIS director decided that the best way to process these going forward is to stuff all the petitions in a pinata, blindfold the temp, and have him whack it with a stick. Whichever petition falls out first, is processed first. If it's too damaged by the stick wacking it gets stuffed back in the pinata for more whacking. I hope this clears things up.

Thanks for that update - I think that was the best explanation we've heard lately.

Now if I could only get my hands on that stick and Christina Poulus, the director of CSC, what fun I would have

I'm about ready to have a pinata party on somebody's head (won't mention any names). No response, no touch, the same old NADA ZIP ZILCH response, not even a touch. The Director received my letter yesterday, but nothing has happened. Still one of the LIVING DEAD March 6 prisoners being held hostage at CSC.

2/28/06 - K-1 app sent to NSC

3/06/06 - NOA 1

3/31/06 - NOA 2

4/12/06 - NVC sent approved petition to Paris embassy

4/24/06 - fiance received instruction pkt (pkt 3)

5/05/06 - pkt 3 checklist returned to embassy

6/16/06 - CRIS-USCIS email "petition received"

6/21/06 - 1-797s (2) received, petition "received", "reopened" by CSC

6/26/06 - email, RFE sent

7/05/06 - RFE received and sent back to CSC

7/06/06 - RFE received, signed for by receptionist at CSC

7/11/06 - email RFE received by CSC

7/12/06 - touched (same message as day before about RFE receipt

WAITING WAITING WAITING

8/15/06 - NVC receives reaffirmed petition (no written confirmation yet)

8/22/06 - NVC sends reapproved petition back to Paris CHOUETTE!!!!

9/21/06 - Pkt. 4 received

10/4/06 - INTERVIEW scheduled\

11-14-06 - VISA RECEIVED!!!!![/b]

12/08/06 - Arrives - POE PDX

12/14/06 - Married in Vegas, Baby!!!

AOS

01/03/07- I-485 sent to Chicago

01/09/07 - NOA from MSC

01/30/07 - Biometrics taken

02/01/07 - touched

04/10/07 - Interview scheduled/AOS approved - I-551 stamp in passport

04/18/07 - Permanent Resident Card received!!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Canada
Timeline

I'm just so tired. I wanna get on with my life already. Too long for us all to be held prisoners.

For me it has only been.. coming on 4 months. But that is long enough I guess. What makes it all seem worse is that we know things were just held up and sitting for months until they sorted out the IMBRA stuff.

Edited by hockeygal

04/13/06 - I-129F mailed

04/18/06 - NOA1

08/30/06 - NOA2

09/26/06 - received at NVC

09/27/06 - forwarded to consulate

20/11/06 - visa in my pocket!

14/01/07 - POE

13/04/07 - marriage

27/04/07 docs sent in for AOS, EAD, AP

26/06/07 - biometrics appointment

02/17/07 - AP and EAD arrive

03/03/08 - Infopass - where the heck is my AOS interview?? No one knows!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Algeria
Timeline
The way things been going, how much longer do you think it's gonna take for them to reach to the July cases? Seems like they are about five months behind according to their web site. But yet I'm seeing many threads claiming that some of the June cases have been approved. If so why aren't they updating their status?

Yes, and it'll be that until this IMBRA ####### pans out.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...