Thanks Sweetcheeksss.

Ankit....well...thanks for the offer of money (oh wait, I helped myself to this fictitious money). You are about a month behind us...hopefully sooner.

Good luck to everyone else.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

My real name (if you couldn't tell from my time line and the Igor's list) is Alix. We both start with A. :).

FLPilot....you should be coming up here pretty soon!

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ghana
Timeline

OMGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG!!!!!!!!!!!!!!!!! I GOT AN APPROVAL!!!!!!! I JUST GOT THE E-MAIL TODAY! I COULDN'T BELIEVE IT BECAUSE IT WAS SENT TO MY JUNK E-MAIL.

THANK YOU EVERYONE FOR PUTTING ME 1ST ON YOUR LISTS. SORRY I DIDN'T BELIEVE YOU ALL.

HOPEFULLY YOU WILL ALL GET YOUR APPROVALS SOOOOOOOOOOOOOOOOON SO WE CAN STAY TOGETHER IN THE JUNE NVC....HOLY MOLY...THAT DOESN'T EVEN SEEM POSSIBLE. I'M AT WORK RIGHT NOW SO I CAN'T LET MY HUSBAND KNOW UNTIL I GET OFF THIS AFTERNNON.

WHAT ARE THE STEPS OF NVC????? GAH....I'VE LOST MY MIND (WHAT LITTLE WAS LEFT). I WON'T ABANDON THE REST OF YOU ALL. I KNOW WE WILL BE CONNECTED HERE SOON.

HOW CAN I WORK WITH NEWS LIKE THIS? GOOD THING NO ONE EVER COMES IN :P.

Congratulations. Goes to show all good things comes to those who trust in the Lord. Okay so you will now update your timeline I hope. :)

Marriage: 09-12-2009

USCIS

4-26-10 Sent of I-130

10-07-10 Approved

10-12-10 Received hardcopy of NOA2

NVC

10-12-10: NVC has application but case number yet to be assigned.

10-18-10: Case number assigned.

10-19-10: Provided both email addresses

10-23-10: DS-3032 emailed; no response

10-28-10: Received IIN, dithering around instead of paying the fee

10-30-10: DS3032 Kit and I-864 AOS review fee ($88) online payment; In Process

11-03-10: I-864 AOS status 'PAID"; printed cover sheet and mailed I-846EZ package

11-04-10: I-864EZ AOS received and signed by N. Visa Center

11-05-10: DS-230 IV fee ($404) online payment

11-17-10: AOS entered into the system

12-03-10: IV fee paid ($404); In Process

12-06-10: DS-230 IV status 'PAID',

12-07-10: IV package mailed out

12-08-10: DS-230 IV package delivery; signed by N. Visa Center

12-14-10: DS230 entered into system; yay

12-29-10: SIF

12-30-10: Case Completed @ NVC

Total days @ NVC:79 I-130 to Case Complete 249 days

Consulate

08-25-11: Consulate Interview Schedule

xxxx: Medicals

10-20-11: Interview 8:30AM Need Co-sponsor

11-17-11: Visa granted

12-09-11: Picked up visa from Accra Consulate

filsm5.png

event.png

WZs0m5.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

My time line was updated shortly after I posted on here that I got my NOA2.

Of course I will be updating all the rest of the way. No need to quit now.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

OH SNAP!

Congrats!!! *jesal runs to his spam box*

LOL!! I think everyone after seeing Alix's response started checking their JUNK/SPAM folder.

NVC

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: AOS review fee ($88) online payment - IN PROCESS

10/14/2010: AOS status 'PAID'

10/16/2010: DS-230 IV fee ($404) online payment - IN PROCESS

10/19/2010: DS-230 IV status 'PAID'

10/20/2010: AOS & DS-230 IV package sent

10/22/2010: AOS & DS-230 IV package delivered. Signed by: J Desmond.

11/10/2010: SIF!!!

11/14/2010: received checklist for missing passport office PCC.

11/10/2010: NVC Completion

12/09/2010: NVC Forwards Case to Consulate

CONSULATE

11/22/2010: Passport Office PCC to be in hand

12/22/2010: Medical Completed

12/28/2011: VFS Office Visit - Submit all required documents

01/10/2011: Interview Date - APPROVED

j1/11/2011: Passport arrived at home.

01/25/2011: Wife Comes to USA (POE: Newark, NJ)

event.png

i6qembf7x.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Seriously....they always tell you to check there but no one thinks it will be there. Luckily I check that thing every day because I refuse to have FB comments sent to my inbox, so I let them go to junk and just check them there.

I am hoping (now that an officer confirmed it as being so) that this time my info is correct!!!!!!!

Thanks for the congrats Jesal.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I think now people will start to realize that the approvals have started for March Filers and they need to start working on the NVC stage paperwork (if they haven't started so).

NVC

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: AOS review fee ($88) online payment - IN PROCESS

10/14/2010: AOS status 'PAID'

10/16/2010: DS-230 IV fee ($404) online payment - IN PROCESS

10/19/2010: DS-230 IV status 'PAID'

10/20/2010: AOS & DS-230 IV package sent

10/22/2010: AOS & DS-230 IV package delivered. Signed by: J Desmond.

11/10/2010: SIF!!!

11/14/2010: received checklist for missing passport office PCC.

11/10/2010: NVC Completion

12/09/2010: NVC Forwards Case to Consulate

CONSULATE

11/22/2010: Passport Office PCC to be in hand

12/22/2010: Medical Completed

12/28/2011: VFS Office Visit - Submit all required documents

01/10/2011: Interview Date - APPROVED

j1/11/2011: Passport arrived at home.

01/25/2011: Wife Comes to USA (POE: Newark, NJ)

event.png

i6qembf7x.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

I could really "helpful" and write in here every step that I go through. Minus the calling peeps and all of that fun junkola. If any one would like me to do that, I am more than willing.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I could really "helpful" and write in here every step that I go through. Minus the calling peeps and all of that fun junkola. If any one would like me to do that, I am more than willing.

Duh. I think we ALL would love that. I know i sure would since im hoping getting approved sometime next.

Blah.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Yup. I would like it too. I still have a while to go but I will appreciate it as well.

NVC

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: AOS review fee ($88) online payment - IN PROCESS

10/14/2010: AOS status 'PAID'

10/16/2010: DS-230 IV fee ($404) online payment - IN PROCESS

10/19/2010: DS-230 IV status 'PAID'

10/20/2010: AOS & DS-230 IV package sent

10/22/2010: AOS & DS-230 IV package delivered. Signed by: J Desmond.

11/10/2010: SIF!!!

11/14/2010: received checklist for missing passport office PCC.

11/10/2010: NVC Completion

12/09/2010: NVC Forwards Case to Consulate

CONSULATE

11/22/2010: Passport Office PCC to be in hand

12/22/2010: Medical Completed

12/28/2011: VFS Office Visit - Submit all required documents

01/10/2011: Interview Date - APPROVED

j1/11/2011: Passport arrived at home.

01/25/2011: Wife Comes to USA (POE: Newark, NJ)

event.png

i6qembf7x.png

Link to comment
Share on other sites

Congrats TeyaValentina,

I am very happy to see a Marcher get approved. March 11 was my NOA1, I'm hoping to see something in the next few weeks. :wow:

Sent ----- March 2, 2010

NOA1 ----- March 11 2010

NOA2 ----- July 14, 2010 Yahoooooo!!! Sige na, lets GO na.

125 days I-130 approval

Got NVC Number on----------- July 23, 2010

Got email of ds3032/AOS bill---- July 29, 2010

Paid AOS bill ---------------- July 29, 2010

PAID IV BILL -----------------Aug 13, 2010

Rec Instructions --------------Aug 16, 2010

Mailed DS-230 ---------------Aug 16, 2010

NVC case completed -----------Sept 1

NVC sent to Embassy ----------Sept 1

Embassy Received petition ------ Sept 8 2010

Passed the Medical Exam --------Sept 29, 2010

Interview ---------------------October 20, 2010

Approved

MY WIFE IS HOME NA! It's like living a dream everyday.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline

Congrats TeyaValentina!

Yes, I hope you are right! Seeing you get approved has me VERY excited that I may be close too!

[color="#0000FF"][font="Tahoma"]Married: 6/12/09
I-130 filed: 2/19/10
NOA1: 3/2/10[/font][/color]

[url="http://www.TickerFactory.com/"]
[img]http://tickers.TickerFactory.com/ezt/d/4;10732;130/st/20100302/e/%20NOA1/k/d26d/event.png[/img]
[/url]

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Congrats TeyaValentina!

Yes, I hope you are right! Seeing you get approved has me VERY excited that I may be close too!

Looks like you are next FLPilot. Hope you are ready with the documents needed for NVC Stage.

NVC

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: AOS review fee ($88) online payment - IN PROCESS

10/14/2010: AOS status 'PAID'

10/16/2010: DS-230 IV fee ($404) online payment - IN PROCESS

10/19/2010: DS-230 IV status 'PAID'

10/20/2010: AOS & DS-230 IV package sent

10/22/2010: AOS & DS-230 IV package delivered. Signed by: J Desmond.

11/10/2010: SIF!!!

11/14/2010: received checklist for missing passport office PCC.

11/10/2010: NVC Completion

12/09/2010: NVC Forwards Case to Consulate

CONSULATE

11/22/2010: Passport Office PCC to be in hand

12/22/2010: Medical Completed

12/28/2011: VFS Office Visit - Submit all required documents

01/10/2011: Interview Date - APPROVED

j1/11/2011: Passport arrived at home.

01/25/2011: Wife Comes to USA (POE: Newark, NJ)

event.png

i6qembf7x.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

I can tell you all this much. They weren't kidding when they said that the NVC # is busy all of the time! It will be a number you will have down pat just because you have dialed it sooooooooo many times. There really is no reason for me to even start calling yet (except for that I did the same thing with my money order even though I knew I had a while to wait for that to be cashed) because it will take a week or 2 for them to have my case. Although, if the case # predictor is still accurate from the LingChe Shortcuts:

3. NVC Scans Package.

This marries the USCIS receipt number to your newly generated NVC number which is based on

EEEYYYYOOOSSS

* E = 3 digit embassy code (example TKY for Tokyo)

* Y = 4 digit code for year (example 2008)

* O= 3 digit code for Ordinal date plus 500

* Example I. Aug 28 = 241st ordinal day ADD 500 = 741

* Example II. 741 SUBTRACT 500 = 241st ordinal day (Aug. 28)

* S = Sequence number of the day (if you were the second approval scanned, your code would be 002)

Full Example of NVC case number = TKY2008741002

I have all but the last 3 numbers of my case # figured out. Since I have to wait for NVC to have my case, it wouldn't do me much good anyway.

I have (from before) the DS3032 e-mail format (http://www.visajourney.com/wiki/index.php/Email_DS-3032_form) saved and will fill in the details once I have my case number. I will e-mail to my husband and have him e-mail that. I will also e-mail him a copy of the snail mail version to print of and sign and send to me, just in case the e-mail DS3032 doesn't get accepted.

So, for now I wait again. I will keep trying to call the NVC. Although, Sweetcheeksss has yet to be assigned a case # (last that I read) and she is a ways ahead of me.

-Input....too much detail? Too little detail?

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...