Jump to content

516 posts in this topic

Recommended Posts

Filed: Country: Philippines
Timeline
Posted

Hi Malvika, we are here to support you.

I know that your case completion will come soon.

Regards and Good luck.

My Journey

Oct 21,1997: Priority Date F2B

May 25,2009: POE LAX

Aug 29,2009: Wedding in PI

F2A for Wife and Daughter

I-130 Track

Feb 04,2010: I-130 Sent

Feb 07,2010: I-130 Received by USCIS

Feb 12,2010: NOA1

Aug 13,2010: Case Touched

Aug 14,2010: Case Touched

Aug 19,2010: Case Touched

Aug 30,2010: Case Approved

Sept 2,2010: NOA2 Received

Sept 15,2010:NVC assigned Case No.

Sept 22,2010:Received AOS Fee Bill and DS-3032. Paid AOS fee online.

Oct 05, 2010:Paid IV Fee Bill online.

Oct 25, 2010:Send package IV to NVC

Oct 27, 2010:NVC Received Package IV

Oct 28, 2010:Send AOS to NVC

Nov 01, 2010:NVC received AOS

Nov 22, 2010:Case Complete

Interview Date : July 17,2012. Passed Interview.

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline
Posted

Hi Malvika, we are here to support you.

I know that your case completion will come soon.

Regards and Good luck.

THanks Ekto for your support !

I wish you for early interview date.

My NVC Journey

10/12/10 –NVC received the file

10/15/10 -NVC case # generated

10/18/10 -Called NVC and gave both beneficiary and petitioner email addresses

10/19/10 - Beneficiary emailed DS-3032 to NVC and also mailed the hard copy

10/26/10 - Called NVC and got the IIN

10/26/10 - Paid AOS fee $ 88.00

10/27/10 - AOS fee status shows "PAID"

10/27/10 - AOS package expressed mailed (next day delivery)

10/30/10 - IV fee bill generated and paid immediately

10/30/10 - Received AOS fee bill and DS-3032 kit and also received the confirmation of receipt of DS-3032

11/04/10 - IV fee bill status shown as "paid"

11/04/10 - Sent IV package (next day delivery)

11/06/10 - Received IV instructions packet (packet 3) via email

11/08/10 - AOS entered into NVC system

11/16/10 - AOS was reviewed and OK'ed

11/18/10 - IV entered into NVC system

11/24/10 - IV package was reviewed and generated artificial RFE for missing photographs (which was actually submitted with the package)

11/26/10 - RFE response mailed out

11/29/10 - RFE response delivered to NVC

12/08/10 - RFE response entered into NVC system

12/15/10 - SIF :)

12/15/10 - Case Complete :)

01/03/11 - Interview date assigned for Feb 15 @ 1:30 PM

01/17/11 - Medical done ! Passed

01/25/11 - Re-scheduled the interview for Feb 1 @ 1:00 PM

02/01/11 - Interview @ 1:00 PM - Approved :)

02/03/11 - Visa picked up from USEM

02/12/11 - POE @ JFK

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline
Posted

Khanl,

Questions for you, please !

1. When NVC received your RFE? Do you remember the date? I know you had sent on 11/06, had you done overnite?

2. Did you get SIF before your case complete?

My NVC Journey

10/12/10 –NVC received the file

10/15/10 -NVC case # generated

10/18/10 -Called NVC and gave both beneficiary and petitioner email addresses

10/19/10 - Beneficiary emailed DS-3032 to NVC and also mailed the hard copy

10/26/10 - Called NVC and got the IIN

10/26/10 - Paid AOS fee $ 88.00

10/27/10 - AOS fee status shows "PAID"

10/27/10 - AOS package expressed mailed (next day delivery)

10/30/10 - IV fee bill generated and paid immediately

10/30/10 - Received AOS fee bill and DS-3032 kit and also received the confirmation of receipt of DS-3032

11/04/10 - IV fee bill status shown as "paid"

11/04/10 - Sent IV package (next day delivery)

11/06/10 - Received IV instructions packet (packet 3) via email

11/08/10 - AOS entered into NVC system

11/16/10 - AOS was reviewed and OK'ed

11/18/10 - IV entered into NVC system

11/24/10 - IV package was reviewed and generated artificial RFE for missing photographs (which was actually submitted with the package)

11/26/10 - RFE response mailed out

11/29/10 - RFE response delivered to NVC

12/08/10 - RFE response entered into NVC system

12/15/10 - SIF :)

12/15/10 - Case Complete :)

01/03/11 - Interview date assigned for Feb 15 @ 1:30 PM

01/17/11 - Medical done ! Passed

01/25/11 - Re-scheduled the interview for Feb 1 @ 1:00 PM

02/01/11 - Interview @ 1:00 PM - Approved :)

02/03/11 - Visa picked up from USEM

02/12/11 - POE @ JFK

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline
Posted

What's going on guys?

Perriteyl, homer4all, ekto and khanl, did you guys have your interview date yet?

Perriteyl, your case was completed on October 26. You should already have your interview date by now (actually a long ago). I came across someone whose case was completed on 12/06 (yesterday) and got the interview date for 01/10/11 the same day. He is also from Philippines.

My NVC Journey

10/12/10 –NVC received the file

10/15/10 -NVC case # generated

10/18/10 -Called NVC and gave both beneficiary and petitioner email addresses

10/19/10 - Beneficiary emailed DS-3032 to NVC and also mailed the hard copy

10/26/10 - Called NVC and got the IIN

10/26/10 - Paid AOS fee $ 88.00

10/27/10 - AOS fee status shows "PAID"

10/27/10 - AOS package expressed mailed (next day delivery)

10/30/10 - IV fee bill generated and paid immediately

10/30/10 - Received AOS fee bill and DS-3032 kit and also received the confirmation of receipt of DS-3032

11/04/10 - IV fee bill status shown as "paid"

11/04/10 - Sent IV package (next day delivery)

11/06/10 - Received IV instructions packet (packet 3) via email

11/08/10 - AOS entered into NVC system

11/16/10 - AOS was reviewed and OK'ed

11/18/10 - IV entered into NVC system

11/24/10 - IV package was reviewed and generated artificial RFE for missing photographs (which was actually submitted with the package)

11/26/10 - RFE response mailed out

11/29/10 - RFE response delivered to NVC

12/08/10 - RFE response entered into NVC system

12/15/10 - SIF :)

12/15/10 - Case Complete :)

01/03/11 - Interview date assigned for Feb 15 @ 1:30 PM

01/17/11 - Medical done ! Passed

01/25/11 - Re-scheduled the interview for Feb 1 @ 1:00 PM

02/01/11 - Interview @ 1:00 PM - Approved :)

02/03/11 - Visa picked up from USEM

02/12/11 - POE @ JFK

Filed: F-2A Visa Country: Philippines
Timeline
Posted

hi malvika, i am also waiting for interview date. could that person be possibly pulling our legs? :no: i mean, to me, receiving an interview appt a day after a case has been completed seems a little far-fetched.

i think im still good since others whose cases were completed earlier than me havent received interview appts yet.

Mar 08, 2010 - I-130 Submitted

Mar 17, 2010 - I-130 NOA1

Sep 02, 2010 - I-130 NOA2

Sep 16, 2010 - NVC Case # assigned

Sep 23, 2010 - received DS3230 and AOS bill thru mail

Sep 23, 2010 - paid AOS bill

Sep 28, 2010 - paid IV bill

Sep 30, 2010 - AOS packet delivered to NVC

Oct 04, 2010 - DS230 and civil docs delivered to NVC

Oct 06, 2010 - documents were received by NVC as per AVR

Oct 26, 2010 - -case complete-

Filed: Country: Philippines
Timeline
Posted

What's going on guys?

Perriteyl, homer4all, ekto and khanl, did you guys have your interview date yet?

Perriteyl, your case was completed on October 26. You should already have your interview date by now (actually a long ago). I came across someone whose case was completed on 12/06 (yesterday) and got the interview date for 01/10/11 the same day. He is also from Philippines.

still waiting for my interview.

the case that you are talking about might be under K1.

the embassy is the one who schedule their interview and not NVC.

How about the status of your case?

My Journey

Oct 21,1997: Priority Date F2B

May 25,2009: POE LAX

Aug 29,2009: Wedding in PI

F2A for Wife and Daughter

I-130 Track

Feb 04,2010: I-130 Sent

Feb 07,2010: I-130 Received by USCIS

Feb 12,2010: NOA1

Aug 13,2010: Case Touched

Aug 14,2010: Case Touched

Aug 19,2010: Case Touched

Aug 30,2010: Case Approved

Sept 2,2010: NOA2 Received

Sept 15,2010:NVC assigned Case No.

Sept 22,2010:Received AOS Fee Bill and DS-3032. Paid AOS fee online.

Oct 05, 2010:Paid IV Fee Bill online.

Oct 25, 2010:Send package IV to NVC

Oct 27, 2010:NVC Received Package IV

Oct 28, 2010:Send AOS to NVC

Nov 01, 2010:NVC received AOS

Nov 22, 2010:Case Complete

Interview Date : July 17,2012. Passed Interview.

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline
Posted

Perriteyl and Ekto,

The case I am talking about is IR1/CR1 not the K1. They filed I-130 not the I-129 for their spouse.

Visit the thread below "NVC October Filers". You will see users like 'Jon and Sol' and 'Atencio' in the last page. Look at their timeline they have recently had their case complete and already got their interview date. They both are from Philippines. Actually there are many more VJ users from Philippines in that thread. I am not trying to discourage you guys saying that you guys haven't gotton your interview date and others already did rather I am trying to help you out. Just keep in touch with those folks they might share some useful ideas/tips.

Thanks.

http://www.visajourney.com/forums/topic/276525-nvc-filers-for-october-2010/page__st__4665

My update:- As you guys can see from my timeline that I had an artificial RFE regarding my missing photographs and I sent that on 11/26 NVC still hasn't matched that to my case file and I am waiting for it.

My NVC Journey

10/12/10 –NVC received the file

10/15/10 -NVC case # generated

10/18/10 -Called NVC and gave both beneficiary and petitioner email addresses

10/19/10 - Beneficiary emailed DS-3032 to NVC and also mailed the hard copy

10/26/10 - Called NVC and got the IIN

10/26/10 - Paid AOS fee $ 88.00

10/27/10 - AOS fee status shows "PAID"

10/27/10 - AOS package expressed mailed (next day delivery)

10/30/10 - IV fee bill generated and paid immediately

10/30/10 - Received AOS fee bill and DS-3032 kit and also received the confirmation of receipt of DS-3032

11/04/10 - IV fee bill status shown as "paid"

11/04/10 - Sent IV package (next day delivery)

11/06/10 - Received IV instructions packet (packet 3) via email

11/08/10 - AOS entered into NVC system

11/16/10 - AOS was reviewed and OK'ed

11/18/10 - IV entered into NVC system

11/24/10 - IV package was reviewed and generated artificial RFE for missing photographs (which was actually submitted with the package)

11/26/10 - RFE response mailed out

11/29/10 - RFE response delivered to NVC

12/08/10 - RFE response entered into NVC system

12/15/10 - SIF :)

12/15/10 - Case Complete :)

01/03/11 - Interview date assigned for Feb 15 @ 1:30 PM

01/17/11 - Medical done ! Passed

01/25/11 - Re-scheduled the interview for Feb 1 @ 1:00 PM

02/01/11 - Interview @ 1:00 PM - Approved :)

02/03/11 - Visa picked up from USEM

02/12/11 - POE @ JFK

Filed: F-2A Visa Country: Philippines
Timeline
Posted

hi malvika, i am also waiting for interview date. could that person be possibly pulling our legs? :no: i mean, to me, receiving an interview appt a day after a case has been completed seems a little far-fetched.

i think im still good since others whose cases were completed earlier than me havent received interview appts yet.

i know right perriteyl.same day completion and interview app date,lucky him ! mine was 9 weeks completed already--no interview schedule yet. :(

Filed: Other Country: Peru
Timeline
Posted (edited)

To Malvika and to those of you who received a RFE:

In order to submit the requested document, did you use the document cover sheet (from the payment site) or did you use the sheet with the barcode that was e-mailed to you in the RFE e-mail??

Could you also tell me how long it took for you to receive the RFE e-mail since the day the automated system stated you had an RFE??

Thank you in advance for your response(s)!!!

F2A - Children of LPR

Sept. 29 2009 - Priority date

Aug. 13, 2010 - NOA2

Sep. 18, 2010 - AOS and IV fee bill showed as PAID

Oct. 29, 2010 - DS-230 was mailed

Nov. 12, 2010 - AOS was mailed

Edited by Picaraz
Filed: IR-1/CR-1 Visa Country: Nepal
Timeline
Posted

To Malvika and to those of you who received a RFE:

In order to submit the requested document, did you use the document cover sheet (from the payment site) or did you use the sheet with the barcode that was e-mailed to you in the RFE e-mail??

Could you also tell me how long it took for you to receive the RFE e-mail since the day the automated system stated you had an RFE??

Thank you in advance for your response(s)!!!

F2A - Children of LPR

Sept. 29 2009 - Priority date

Aug. 13, 2010 - NOA2

Sep. 18, 2010 - AOS and IV fee bill showed as PAID

Oct. 29, 2010 - DS-230 was mailed

Nov. 12, 2010 - AOS was mailed

Picaraz,

Yes, I used a document coversheet from the payment portal site. Actually I didn't even wait for NVC email for RFE information because I had talked to multiple operators in NVC and knew that it was my photographs that they were missing. If you find out what exactly is NVC requesting from you, you shouldn't really wait for RFE email. I knew about my RFE on 11/25 morning from NVC AVR and spoke with NVC operator next morning to confirm since NVC was closed on 11/25 (thanks giving day). I received RFE email (Checklist cover letter) on 11/27 and I mailed my RFE response on 11/26. Hope this helps !

My NVC Journey

10/12/10 –NVC received the file

10/15/10 -NVC case # generated

10/18/10 -Called NVC and gave both beneficiary and petitioner email addresses

10/19/10 - Beneficiary emailed DS-3032 to NVC and also mailed the hard copy

10/26/10 - Called NVC and got the IIN

10/26/10 - Paid AOS fee $ 88.00

10/27/10 - AOS fee status shows "PAID"

10/27/10 - AOS package expressed mailed (next day delivery)

10/30/10 - IV fee bill generated and paid immediately

10/30/10 - Received AOS fee bill and DS-3032 kit and also received the confirmation of receipt of DS-3032

11/04/10 - IV fee bill status shown as "paid"

11/04/10 - Sent IV package (next day delivery)

11/06/10 - Received IV instructions packet (packet 3) via email

11/08/10 - AOS entered into NVC system

11/16/10 - AOS was reviewed and OK'ed

11/18/10 - IV entered into NVC system

11/24/10 - IV package was reviewed and generated artificial RFE for missing photographs (which was actually submitted with the package)

11/26/10 - RFE response mailed out

11/29/10 - RFE response delivered to NVC

12/08/10 - RFE response entered into NVC system

12/15/10 - SIF :)

12/15/10 - Case Complete :)

01/03/11 - Interview date assigned for Feb 15 @ 1:30 PM

01/17/11 - Medical done ! Passed

01/25/11 - Re-scheduled the interview for Feb 1 @ 1:00 PM

02/01/11 - Interview @ 1:00 PM - Approved :)

02/03/11 - Visa picked up from USEM

02/12/11 - POE @ JFK

Filed: F-2A Visa Country: Philippines
Timeline
Posted

thanks for the link malvika!

Mar 08, 2010 - I-130 Submitted

Mar 17, 2010 - I-130 NOA1

Sep 02, 2010 - I-130 NOA2

Sep 16, 2010 - NVC Case # assigned

Sep 23, 2010 - received DS3230 and AOS bill thru mail

Sep 23, 2010 - paid AOS bill

Sep 28, 2010 - paid IV bill

Sep 30, 2010 - AOS packet delivered to NVC

Oct 04, 2010 - DS230 and civil docs delivered to NVC

Oct 06, 2010 - documents were received by NVC as per AVR

Oct 26, 2010 - -case complete-

Filed: F-2A Visa Country: Pakistan
Timeline
Posted

What's going on guys?

Perriteyl, homer4all, ekto and khanl, did you guys have your interview date yet?

Perriteyl, your case was completed on October 26. You should already have your interview date by now (actually a long ago). I came across someone whose case was completed on 12/06 (yesterday) and got the interview date for 01/10/11 the same day. He is also from Philippines.

hmm nothing today no interview yet hopefully soon. :crying:

STUPID RETROGRSSION

FOR MY WIFE WHICH IS MY LIFE :-)

4/15/08--FILED 1-130

4/19/08--RECIPT

1/20/10--NOA1

8/15/10--TOUCHED

8/19/10--NOA2

2 YEAR 4 MONTHS I130 APPROVAL THANK GOD

9/07/10----NVC CASE # ASSIGNED

9/15/10----AOS FEE BILL AND IV FEE BILL RECIVED

9/18/10----AOS FEE BILL AND IV FEE BILL POSTED

9/27/10----AOS AND DS203 PACKAGE MAILED

10/01/10----ALL DOCS RECIVED BY NVC PER AVR

10/19/10----RFE FOR ORIGINAL MARRIAGE CERTIFICATE IN URDU LANGUAGE ""SHOULD HAVE KNOWN"

11/06/10----RFE SENT AVR NOT UPDATED AS OF 11/09 WAITING FOR CASE COMPLETE

11/15/10----AVR SAYS RFE RECIVED... JUST WAITIN FOR CASE COMPLETE

11/17/10----CASE COMPLETE

08/30/11----INTERVIEW AT 8.00AM VISA WAS APPROVED 8/30/11 THANKYOU GOD AND EID MUBARAK

10/15/11----POE

00/00/11----LIVE HAPPILY EVER AFTER[/color]

Filed: F-2A Visa Country: Pakistan
Timeline
Posted

Khanl,

Questions for you, please !

1. When NVC received your RFE? Do you remember the date? I know you had sent on 11/06, had you done overnite?

2. Did you get SIF before your case complete?

after about a week and have before they got my RFE my case was done. It was case complete in the AVR and after 3-4 days SIF

STUPID RETROGRSSION

FOR MY WIFE WHICH IS MY LIFE :-)

4/15/08--FILED 1-130

4/19/08--RECIPT

1/20/10--NOA1

8/15/10--TOUCHED

8/19/10--NOA2

2 YEAR 4 MONTHS I130 APPROVAL THANK GOD

9/07/10----NVC CASE # ASSIGNED

9/15/10----AOS FEE BILL AND IV FEE BILL RECIVED

9/18/10----AOS FEE BILL AND IV FEE BILL POSTED

9/27/10----AOS AND DS203 PACKAGE MAILED

10/01/10----ALL DOCS RECIVED BY NVC PER AVR

10/19/10----RFE FOR ORIGINAL MARRIAGE CERTIFICATE IN URDU LANGUAGE ""SHOULD HAVE KNOWN"

11/06/10----RFE SENT AVR NOT UPDATED AS OF 11/09 WAITING FOR CASE COMPLETE

11/15/10----AVR SAYS RFE RECIVED... JUST WAITIN FOR CASE COMPLETE

11/17/10----CASE COMPLETE

08/30/11----INTERVIEW AT 8.00AM VISA WAS APPROVED 8/30/11 THANKYOU GOD AND EID MUBARAK

10/15/11----POE

00/00/11----LIVE HAPPILY EVER AFTER[/color]

Posted

Hello friends...

My NVC login failed on 24-Nov-2010 so I assume my case is completed...on same day I received email from NVC regarding my aus pcc remaining and how to apply...

In checklist letter it says you must submit requested information...but in same letter it mentions your pcc will be directly fwded to consulate after you apply for pcc...

So I am now little confuse...

1. Since my login is failed should I assume my case is completed at NVC and I don't have to submit my pcc to NVC and take pcc along with my interview?

2. Who arrange interview is it NVC or consulate?

Thanks,

F2A for husband (i.e. Me)

24 Jul 2009: PD (I-130 NOA1 Rcvd)

?? Sep 2010: NOA2 Rcvd

24 Nov 2010: NVC CASE COMPLETE

03 Apr 2012: Interview @Sydney @10AM

12 Apr 2012: Finally!!! Yes got the VISA

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...