Jump to content

1,797 posts in this topic

Recommended Posts

Filed: K-1 Visa Country: Belarus
Timeline
Posted

Oh i know, i am going to be better later, today is just one of those days, just that...

What does the P3 has? i see in some cases they never got the P3... is that true?

The P3 contents is Embassy specific, and some don't have one at all. It's generally just an information checklist of what is needed at the interview, and another general bio info form about the beneficiary.

Here's an example for Poland:

(click on link for IV/F04)

http://poland.usembassy.gov/poland/processing_fiance.html

Mailed K1: Fedex to VSC Feb 19, 2010

NOA1: Feb 22

NOA2: May 17 (84 days, no touches, both SMS and email notice received a day later)

Rcvd at NVC: May 19

Sent on to Embassy: May 21 (in reality, May 24th)

Received at Embassy: May 26

Packet 3 received: June 1

Packet 3 returned: June 2

Packet 4 received: June 16 (emailed appointment date June 11)

interview: July 19th (Warsaw - APPROVED!!!)

POE: July 24th :)

Posted

The P3 contents is Embassy specific, and some don't have one at all. It's generally just an information checklist of what is needed at the interview, and another general bio info form about the beneficiary.

Here's an example for Poland:

(click on link for IV/F04)

http://poland.usembassy.gov/poland/processing_fiance.html

Ohhh, thats why some of the PPL of K1 visa that i see here, they dont have a P3 in their timeline... in the NVC letter they said to check the specifics for our embassy and didn't have any... so probably what i will received is the P4... thats what i am guessing...

Thank you so much...

oct 2007*met
05nov2007*started dating
02jan2010*engaged
13feb2010*sent I-129F
17feb2010*cashed check and received at VSC
24feb2010*NOA1
12May2010*** got NOA2 approval on email.
13may2010*** sent appr to NVC
17may2010***NVC received.
17May2010*** Got NOA2 approval hard copy.
25may2010*** embassy received...
30may2010***got NVC case number on mail.
17Sep2010*Interview date yayyyyyyyy *****APPROVED*****
16oct2010* POE Newark, NJ sooo easy...
************************************************************
26Oct2010* applied for SSN
10Nov2010* Wedding
27Nov2010* AOS/EAD sent.
29Nov2010* Forms arrived at facility
09Dec2010* Received notification email.
13Dec2010* NOA1/touched/SSN received
10Jan2011* biometrics in Elizabeth, NJ
15Jan2011* AOS case transfer to CSC
21Jan2011* AOS Arrived to CSC.
10Feb2011* EAD Approved
15Feb2011* Another MSG of approval of EAD?
16Feb2011* got email about letter of EAD approval on mail.
18Feb2011* got m EAD Card...
22Feb2011* AOS approved
26Feb2011* GC Received on the mail
**************************************************************
27Nov2012* Sent the I-751 (same day as the AOS/EAD!!!!)
29Nov2012* I-751 received at facility
08Dec2012* Got an ROE sad.png hubby sent only copies
10DEc2012* sent I-751 again with originals lol
12Dec2012* Received at facility
17dec2012* Got NOA extending my residence for one year!!!
16jan2013* Biometrics done

2may2013* RFE need more evidence cray5ol.gifthey dont think it is enough

Posted

You think we should call DOS, we just received two weeks ago the mail of NVC with the case number... I called today to our postal service, horrible, they told me they dont have anything :(

oct 2007*met
05nov2007*started dating
02jan2010*engaged
13feb2010*sent I-129F
17feb2010*cashed check and received at VSC
24feb2010*NOA1
12May2010*** got NOA2 approval on email.
13may2010*** sent appr to NVC
17may2010***NVC received.
17May2010*** Got NOA2 approval hard copy.
25may2010*** embassy received...
30may2010***got NVC case number on mail.
17Sep2010*Interview date yayyyyyyyy *****APPROVED*****
16oct2010* POE Newark, NJ sooo easy...
************************************************************
26Oct2010* applied for SSN
10Nov2010* Wedding
27Nov2010* AOS/EAD sent.
29Nov2010* Forms arrived at facility
09Dec2010* Received notification email.
13Dec2010* NOA1/touched/SSN received
10Jan2011* biometrics in Elizabeth, NJ
15Jan2011* AOS case transfer to CSC
21Jan2011* AOS Arrived to CSC.
10Feb2011* EAD Approved
15Feb2011* Another MSG of approval of EAD?
16Feb2011* got email about letter of EAD approval on mail.
18Feb2011* got m EAD Card...
22Feb2011* AOS approved
26Feb2011* GC Received on the mail
**************************************************************
27Nov2012* Sent the I-751 (same day as the AOS/EAD!!!!)
29Nov2012* I-751 received at facility
08Dec2012* Got an ROE sad.png hubby sent only copies
10DEc2012* sent I-751 again with originals lol
12Dec2012* Received at facility
17dec2012* Got NOA extending my residence for one year!!!
16jan2013* Biometrics done

2may2013* RFE need more evidence cray5ol.gifthey dont think it is enough

Filed: K-1 Visa Country: Ukraine
Timeline
Posted

I'm sitting in Kingsland, Ga. Waiting on Doc so we can commence to drinking, telling lies, and of course talk ###### about all of y'all. My midget is excited. Lohninck and Leslie trained him well. The donkey is scared to death. Doc is first on the brass pole. Where are you guys? I'm the only naked one at Applebees. People are stareing. Correction, laughing.

Posted

I'm sitting in Kingsland, Ga. Waiting on Doc so we can commence to drinking, telling lies, and of course talk ###### about all of y'all. My midget is excited. Lohninck and Leslie trained him well. The donkey is scared to death. Doc is first on the brass pole. Where are you guys? I'm the only naked one at Applebees. People are stareing. Correction, laughing.

I wondered where everyone was too! And here I was naked at the wrong Applebees!!! I got lots of stares n laughing too.

OUR TIMELINE AND K1 JOURNEY

Sept 4, 2009...We meet in Toronto, Canada at a Kid Rock concert
Feb 19, 2010...NOA1 recieved in mail
May 19, 2010...NOA2 (92 days)
Sept 24, 2010...Interview! APPROVED! smile.png
Oct 29, 2010...POE--Buffalo, NY
Nov 10, 2010...Courthouse wedding in NY state
Dec 11, 2010...Beach wedding in Hawaii


Dec 09, 2010...NOA for AOS, EAD, AP
Feb 11, 2011...AOS & EAD approved smile.png
Feb 12, 2011...AP approved smile.png
Feb 18, 2011...Received GREEN CARD smile.png
Feb 18, 2011...Received AP
Feb 22, 2011...Received EAD


Nov 09, 2012...Sent in I-751, Removal of Conditions
Nov 14, 2011...NOA1
Dec 18, 2012...Biometrics

May 03, 2013...10 year GREEN CARD approved! yes.gif

Filed: AOS (apr) Country: Denmark
Timeline
Posted

Applebee's? I thought it was at McDonalds.. :unsure:

Before Journey:

Met online in 2002 as friends. Fell in love in 2005. Got engaged in 2010.

K-1 Journey, January 2010-July 2010:

NOA1: January 29. RFE: April 21. NOA2: June 4. Interview: July 15. Visa in hand: July 20. POE: July 22.

July 24, 2010: Married in front of 150 of our loved ones on a beautiful, sunny day. Living happily ever after and oh so thankful that 5 years of a long distance relationship and 7 months of a visa process is condensed into one line.

Wedding pictures! Because I'm shameless. http://s956.photobucket.com/albums/ae47/AmeriDaneWedding/

Adjustment of Status Journey, January 2011-March 2011:

January 25: NOA1 for AOS and EAD. Feb 5: Bio appointment received. Feb 7: RFE. Feb 11: Sent RFE response. Feb 23: AOS transfered to CSC. Feb 25: Biometrics. March 11: EAD approved! March 19: Received EAD. March 21: AOS approved! March 25: GC in hand!

And we'll live happily ever after.. for the next 2 years, anyway.

Filed: K-1 Visa Country: Belarus
Timeline
Posted

So, tickets are booked. :) I can say it's an exercise in near total frustration to try to book a pair of tickets originating from different places, but at the same time, online.

Yes, I know, there's a risk but after watching airfare jump literally as I watched yet again, worrying about somehow not being able to book the return trip together, well - we will be crossing our fingers.

Realistically, we have a week after the interview before coming home, but as we need to travel to Warsaw.. I'm just not going to finish that sentence.

We're prepared, we're ready to finally come home together, so all will be well there. Or we send in the midgets. :)

We are still waiting on the official Packet 4 to arrive, before we can get her Polish Visa, although we have the appointment letter itself via email. There's an irony in there that while the US Embassy in Poland seems to be one of the low hassle, generally really decent Embassies to deal with, that the Polish Embassy she needs to get her travel Visa so we can get to the US Embassy, is much less than nice. Apparently the medical in Minsk can only be scheduled for two days of the week, so we've made some adjustments, but it's all good.

I have to wrap some work up before leaving, but then I'll be leaving to spend almost a month there with T, visiting the family and preparing for the move, then coming back somewhat leisurely, and overnighting once we're back in the states before finally coming home. We're both counting down the days now, and I got a very nice reaction when I got to tell her, 'Oh, did I forget to say I'm coming a day or two earlier than we planned?' :)

Keeping fingers crossed, and right now, the foremost thing in my mind is just making it to getting off that plane and picking T up in my arms. After that, the world can then continue on it's way again. :)

Mailed K1: Fedex to VSC Feb 19, 2010

NOA1: Feb 22

NOA2: May 17 (84 days, no touches, both SMS and email notice received a day later)

Rcvd at NVC: May 19

Sent on to Embassy: May 21 (in reality, May 24th)

Received at Embassy: May 26

Packet 3 received: June 1

Packet 3 returned: June 2

Packet 4 received: June 16 (emailed appointment date June 11)

interview: July 19th (Warsaw - APPROVED!!!)

POE: July 24th :)

Posted

Yesterday i called our Postal office asking if they got a package for me, they dont have anything, :( ... I was sooo sad so my SO called DOS today, they said they havent sent the P3 here, oh i am soooo sad, at least they told him the embassy has our case... i am going to keep calling DOS to see for when, i am desperate...

oct 2007*met
05nov2007*started dating
02jan2010*engaged
13feb2010*sent I-129F
17feb2010*cashed check and received at VSC
24feb2010*NOA1
12May2010*** got NOA2 approval on email.
13may2010*** sent appr to NVC
17may2010***NVC received.
17May2010*** Got NOA2 approval hard copy.
25may2010*** embassy received...
30may2010***got NVC case number on mail.
17Sep2010*Interview date yayyyyyyyy *****APPROVED*****
16oct2010* POE Newark, NJ sooo easy...
************************************************************
26Oct2010* applied for SSN
10Nov2010* Wedding
27Nov2010* AOS/EAD sent.
29Nov2010* Forms arrived at facility
09Dec2010* Received notification email.
13Dec2010* NOA1/touched/SSN received
10Jan2011* biometrics in Elizabeth, NJ
15Jan2011* AOS case transfer to CSC
21Jan2011* AOS Arrived to CSC.
10Feb2011* EAD Approved
15Feb2011* Another MSG of approval of EAD?
16Feb2011* got email about letter of EAD approval on mail.
18Feb2011* got m EAD Card...
22Feb2011* AOS approved
26Feb2011* GC Received on the mail
**************************************************************
27Nov2012* Sent the I-751 (same day as the AOS/EAD!!!!)
29Nov2012* I-751 received at facility
08Dec2012* Got an ROE sad.png hubby sent only copies
10DEc2012* sent I-751 again with originals lol
12Dec2012* Received at facility
17dec2012* Got NOA extending my residence for one year!!!
16jan2013* Biometrics done

2may2013* RFE need more evidence cray5ol.gifthey dont think it is enough

Filed: K-1 Visa Country: United Kingdom
Timeline
Posted (edited)

SandT.......Awwwww this was so nice to read, even I am exited and relieved at the thought of you getting there and being back together, I think its because we all dream that moment right now and I sure do wish you the best of luck with everything. May you have a safe and pleasant journey back to pick up your love...and may the interview and paperworks run smoothly. Then heres to a happy, safe and very exciting journey back to "home" to live happy ever after. I truely think we all deserve our happy ever after...all this waiting and missing I do believe will have brought us together and made solid foundations for our future relationship :)

Solmarc.....wow that sucks big time, Im feeling for you! Right now we are phoning the DOS as well and they are saying they havent had anything back from me :( I sent the PK3 straight back the next day and we had a tracking # put on it. I checked and it states that the pack was delivered the next day in London. Ken says they just need more time to update their files thats all. Im just nervous and impatient as to if Ive done the forms correctly, if they have arrive or been lost. Anyway, I hope they arrive soon for you. The waiting sucks lol.

We leave for London on Monday morning, the children and I are having our medical. Im more nervous about the children behaving as Im sure they will get bored, also a lickle nervous as they havent had Hep B shots.

Edited by ukprincessemx

meet via internet: Sept 2008

Ken deployed to Iraq: Feb 2009

Offically became a couple: May 2009

R&R,Met up USA side/offically got Engaged: 17th/18th Sept 2009,then back to Iraq :(

Returned home to USA safly: Dec 2009

Christmas 2009 together in the UK :D

Engagement party: 27th Dec

Ken leaves UK: 29th Dec

Em x back to USA: 3rd-13th Feb 2010

I-129f sent: 12th Feb 2010

NOA 1: 17th Feb 2010

TOUCHED: 22nd Feb 2010

Ken back to UK: 6th-13th April 2010

Dog flys to the USA: 22nd April 2010

TOUCHED: 10th May 2010

TOUCHED: 11th May 2010

NOA 2: received by mail on 17th May 2010(dated 10th May)

NVC sent file to London: 26th May 2010

written confirmation recieved from NVC with case number: 28th May 2010

Packet 3 received by Em x: 8th June 2010

Packet 3 returned to Embassy: 9th June 2010

Packet 3 received by Embassy: 10th June 2010

Medical appointment: 22nd June 2010 (passed)

DOS says PK3 is in order: 22nd June 2010, yayyy

Packet 4 received: 7th July 2010

Ken arrives in the UK: 11th August

Interview date: 13th August 2010 wooo hoooo

Interview outcome: APPROVED!!!

Visa/passport delivered: 19th August

Arrived at POE (Philly: 26th August 2010

Wedding: 17th Sept 2010

And live happily Ever After

:)

Posted

They told me that i am receiving the interview date on that envelope, and documents to fill and medical info, so i can do the medical, i dont know if i have to sent anything back, looks in my Country, and for the timelines, sometimes they never get the p3... I have no idea if i am getting something i have to return or not, i just want this thing to be over,and get into another one, the residense card, lol... most important for me, being an independent person, GET A JOB!!! ...

Please people, dont get like me, all crazy and cranky,be patience, is something that God havent give me and i havent even try to cultivate it... really bad, bad girl... :)

I guess, after i finish in this office, i am going to get my nails and hair done, get a presidente beer, and try to relax... i am nooooo goood on waiting...

oct 2007*met
05nov2007*started dating
02jan2010*engaged
13feb2010*sent I-129F
17feb2010*cashed check and received at VSC
24feb2010*NOA1
12May2010*** got NOA2 approval on email.
13may2010*** sent appr to NVC
17may2010***NVC received.
17May2010*** Got NOA2 approval hard copy.
25may2010*** embassy received...
30may2010***got NVC case number on mail.
17Sep2010*Interview date yayyyyyyyy *****APPROVED*****
16oct2010* POE Newark, NJ sooo easy...
************************************************************
26Oct2010* applied for SSN
10Nov2010* Wedding
27Nov2010* AOS/EAD sent.
29Nov2010* Forms arrived at facility
09Dec2010* Received notification email.
13Dec2010* NOA1/touched/SSN received
10Jan2011* biometrics in Elizabeth, NJ
15Jan2011* AOS case transfer to CSC
21Jan2011* AOS Arrived to CSC.
10Feb2011* EAD Approved
15Feb2011* Another MSG of approval of EAD?
16Feb2011* got email about letter of EAD approval on mail.
18Feb2011* got m EAD Card...
22Feb2011* AOS approved
26Feb2011* GC Received on the mail
**************************************************************
27Nov2012* Sent the I-751 (same day as the AOS/EAD!!!!)
29Nov2012* I-751 received at facility
08Dec2012* Got an ROE sad.png hubby sent only copies
10DEc2012* sent I-751 again with originals lol
12Dec2012* Received at facility
17dec2012* Got NOA extending my residence for one year!!!
16jan2013* Biometrics done

2may2013* RFE need more evidence cray5ol.gifthey dont think it is enough

Filed: K-1 Visa Country: Belarus
Timeline
Posted

uk - thanks, one more day down. :) Good luck on the medical experience. :)

solmarc, have you seen this before? http://dominicanstotheusa.com/forum/index.php/topic,2302.0.html

Mailed K1: Fedex to VSC Feb 19, 2010

NOA1: Feb 22

NOA2: May 17 (84 days, no touches, both SMS and email notice received a day later)

Rcvd at NVC: May 19

Sent on to Embassy: May 21 (in reality, May 24th)

Received at Embassy: May 26

Packet 3 received: June 1

Packet 3 returned: June 2

Packet 4 received: June 16 (emailed appointment date June 11)

interview: July 19th (Warsaw - APPROVED!!!)

POE: July 24th :)

Filed: K-1 Visa Country: United Kingdom
Timeline
Posted

uk - thanks, one more day down. :) Good luck on the medical experience. :)

solmarc, have you seen this before? http://dominicanstotheusa.com/forum/index.php/topic,2302.0.html

You are most welcome :)

Im dreading the whole thing with the children being young, our son will be fine I think, its the youngest I fear will be bored and play around, she is only 4....we are going to have a big treat afterwards as the appointment is about 10am. Hopefully the ordeal will be over by dinner...we can head off for some McDonalds (next to the London Eye) and then Im taking them to the London Aquarium and for a boat ride on the Thames so they can see the London bridge etc. I think they will deserve it, this whole thing isnt easy on them at all. They are having to deal with missing Daddy, putting up with me, missing the dog lol. Half their belongings are in the states. New friends, new school and house etc. They have been awesome and I dont know how Id cope without them. They are just ready to have Daddy come pick them up now and take them "home".

I will let you know next week when we get back as to how trumatic it was lmao. The 5 hour coach journey to London will be bad enough...lol

meet via internet: Sept 2008

Ken deployed to Iraq: Feb 2009

Offically became a couple: May 2009

R&R,Met up USA side/offically got Engaged: 17th/18th Sept 2009,then back to Iraq :(

Returned home to USA safly: Dec 2009

Christmas 2009 together in the UK :D

Engagement party: 27th Dec

Ken leaves UK: 29th Dec

Em x back to USA: 3rd-13th Feb 2010

I-129f sent: 12th Feb 2010

NOA 1: 17th Feb 2010

TOUCHED: 22nd Feb 2010

Ken back to UK: 6th-13th April 2010

Dog flys to the USA: 22nd April 2010

TOUCHED: 10th May 2010

TOUCHED: 11th May 2010

NOA 2: received by mail on 17th May 2010(dated 10th May)

NVC sent file to London: 26th May 2010

written confirmation recieved from NVC with case number: 28th May 2010

Packet 3 received by Em x: 8th June 2010

Packet 3 returned to Embassy: 9th June 2010

Packet 3 received by Embassy: 10th June 2010

Medical appointment: 22nd June 2010 (passed)

DOS says PK3 is in order: 22nd June 2010, yayyy

Packet 4 received: 7th July 2010

Ken arrives in the UK: 11th August

Interview date: 13th August 2010 wooo hoooo

Interview outcome: APPROVED!!!

Visa/passport delivered: 19th August

Arrived at POE (Philly: 26th August 2010

Wedding: 17th Sept 2010

And live happily Ever After

:)

Posted

uk - thanks, one more day down. :) Good luck on the medical experience. :)

solmarc, have you seen this before? http://dominicanstotheusa.com/forum/index.php/topic,2302.0.html

Hey SanT i really apreciate it, i am reading everything... Thank you so much....

oct 2007*met
05nov2007*started dating
02jan2010*engaged
13feb2010*sent I-129F
17feb2010*cashed check and received at VSC
24feb2010*NOA1
12May2010*** got NOA2 approval on email.
13may2010*** sent appr to NVC
17may2010***NVC received.
17May2010*** Got NOA2 approval hard copy.
25may2010*** embassy received...
30may2010***got NVC case number on mail.
17Sep2010*Interview date yayyyyyyyy *****APPROVED*****
16oct2010* POE Newark, NJ sooo easy...
************************************************************
26Oct2010* applied for SSN
10Nov2010* Wedding
27Nov2010* AOS/EAD sent.
29Nov2010* Forms arrived at facility
09Dec2010* Received notification email.
13Dec2010* NOA1/touched/SSN received
10Jan2011* biometrics in Elizabeth, NJ
15Jan2011* AOS case transfer to CSC
21Jan2011* AOS Arrived to CSC.
10Feb2011* EAD Approved
15Feb2011* Another MSG of approval of EAD?
16Feb2011* got email about letter of EAD approval on mail.
18Feb2011* got m EAD Card...
22Feb2011* AOS approved
26Feb2011* GC Received on the mail
**************************************************************
27Nov2012* Sent the I-751 (same day as the AOS/EAD!!!!)
29Nov2012* I-751 received at facility
08Dec2012* Got an ROE sad.png hubby sent only copies
10DEc2012* sent I-751 again with originals lol
12Dec2012* Received at facility
17dec2012* Got NOA extending my residence for one year!!!
16jan2013* Biometrics done

2may2013* RFE need more evidence cray5ol.gifthey dont think it is enough

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...