what's an I-130? it's been so long since i've seen one LOL :rofl:

USCIS

09-12-09 : I-130 Sent

09-21-09 : NOA1

01-26-10 : NOA2

127 days @ USCIS

NVC

02-01-10 : NVC receives case / Case number assigned / Gave e-mail addresses to operator

02-05-10 : Received DS-3032 & AOS bill / Sent DS-3032 (E-mail) / Paid AOS Bill

02-07-10 : Sent DS-3032 (Snail Mail)

02-09-10 : AOS fee showing PAID

02-11-10 : DS-3032 Delivered to NVC / E-mail confirmation DS-3032 (signed by JESUS)

02-12-10 : IV Bill generated

02-19-10 : IV Bill paid

02-26-10 : AoS package & DS-230 Sent

03-02-10 : AoS package & DS-230 received at 4:11am (Signed by RUDOLPH)

03-05-10 : AVR Updated - Received DS-230

03-16-10 : 3 RFE's received (Incorrect Police Certificate DS230 / I-864 / I-864A

05-20-10 : CASE COMPLETE & SIGN IN FAIL

05-22-10 : New RFE checklist received stating ONLY I-864A needs to be resent.

05-23-10 : Called NVC. AVR claimed our case was 'COMPLETE'

05-26-10 : Interview date set for 07-20-2010

115 days @ NVC

242 DAYS TOTAL SO FAR

US CONSULATE (SYDNEY)

07-12-10 : Medical @ 10am

07-20-10 : Interview @ 9am VISA APPROVED

07-26-10 : VISA IN HAND!!!!!

08-10-10 : P.O.E. Los Angeles

Link to comment
Share on other sites

  • Replies 877
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

Filed: IR-1/CR-1 Visa Country: India
Timeline

Yeahhhhhhhhhhhhhhhhhhhh!!!!!!!!!!!!!!! I opened up my email and got the notice that my application has been approved as of Jan 22!! NOA2 is on the way!! Not sure what happens next but I know this is very good for us!! Yeahhhhh....hang in there guys...I guess I am heading to NVC now!

Personal Journey

2009-01-09 : Met online

2009-08-20 : Wedding in Bangalore, India

2011-06-14 : Hubby finally makes the permanent move to USA

2011-07-20 : Two Pink Lines (Oops!)

2012-04-02 : Our daughter Lili is born!

NVC ~CR-1 Visa~ Journey

2010-02-01 : NVC case # assigned

2010-02-05 : DS-3032/AOS Bill Generated

2010-02-07 : DS-3032 e-mailed; AOS/I-864 Bill (paid online $70)

2010-02-12 : e-mailed DS-3032 accepted by NVC

2010-03-05 : Sent In Completed I-864

2010-03-15 : IV Fee bill generated, paid online $400

2010-06-17 : Sent In Completed DS-230 Packet (took forever to get PCC and BC)

2010-06-18 : DS-230 Signed for by NVC

2010-06-23 : AVR updates "The checklist letter response has been received. Wait 6-8 weeks and you will be notified.

2010-08-06 : Sign in Failed: Finally

2010-08-10 : AVR updates "The case was complete on August 9..."

2010-08-13 : NVC e-mailed an interview date for September 2 2010 9AM - per our request--rescheduled for Oct 4 2010

2010-09-23 : Medical scheduled

2010-10-04 : Interview Failed - Required additional documetation because of sponser job change

2010-10-10 : Submitted additional paperwork to VFS in Bangalore

2010-10-21 : Received notice that Visa is APPROVED!!!

2010-10-24 : Visa in hand

2010-12-23 : US entry

2011-02-14 : Received Green Card

2011-02-15 : Welcome letter sent

USCIS ~Removal of Conditions~ Journey

2012-09-30 : I-751 package sent via USPS (Vermont)

2012-10-05 : Check Cashed

2012-10-09 : Received NOA Letter dated 10-03-2012

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

OMG--Congratulations! Read up on the NVC guides. ASAP.

03/27/2009: Engaged in Ithaca, New York.
08/17/2009: Wedding in Calcutta, India.
09/29/2009: I-130 NOA1
01/25/2010: I-130 NOA2
03/23/2010: Case completed.
05/12/2010: CR-1 interview at Mumbai, India.
05/20/2010: US Entry, Chicago.
03/01/2012: ROC NOA1.
03/26/2012: Biometrics completed.
12/07/2012: 10 year card production ordered.

09/25/2013: N-400 NOA1

10/16/2013: Biometrics completed

12/03/2013: Interview

12/20/2013: Oath ceremony

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
OMG--Congratulations! Read up on the NVC guides. ASAP.

where is the best place to look at this? Yours must be coming soon!!

Personal Journey

2009-01-09 : Met online

2009-08-20 : Wedding in Bangalore, India

2011-06-14 : Hubby finally makes the permanent move to USA

2011-07-20 : Two Pink Lines (Oops!)

2012-04-02 : Our daughter Lili is born!

NVC ~CR-1 Visa~ Journey

2010-02-01 : NVC case # assigned

2010-02-05 : DS-3032/AOS Bill Generated

2010-02-07 : DS-3032 e-mailed; AOS/I-864 Bill (paid online $70)

2010-02-12 : e-mailed DS-3032 accepted by NVC

2010-03-05 : Sent In Completed I-864

2010-03-15 : IV Fee bill generated, paid online $400

2010-06-17 : Sent In Completed DS-230 Packet (took forever to get PCC and BC)

2010-06-18 : DS-230 Signed for by NVC

2010-06-23 : AVR updates "The checklist letter response has been received. Wait 6-8 weeks and you will be notified.

2010-08-06 : Sign in Failed: Finally

2010-08-10 : AVR updates "The case was complete on August 9..."

2010-08-13 : NVC e-mailed an interview date for September 2 2010 9AM - per our request--rescheduled for Oct 4 2010

2010-09-23 : Medical scheduled

2010-10-04 : Interview Failed - Required additional documetation because of sponser job change

2010-10-10 : Submitted additional paperwork to VFS in Bangalore

2010-10-21 : Received notice that Visa is APPROVED!!!

2010-10-24 : Visa in hand

2010-12-23 : US entry

2011-02-14 : Received Green Card

2011-02-15 : Welcome letter sent

USCIS ~Removal of Conditions~ Journey

2012-09-30 : I-751 package sent via USPS (Vermont)

2012-10-05 : Check Cashed

2012-10-09 : Received NOA Letter dated 10-03-2012

Link to comment
Share on other sites

massive congrats. Check the wiki and guides at the top of the pages.

were you getting touched allong the way or did the NOA2 come from no where? :)

USCIS

09-12-09 : I-130 Sent

09-21-09 : NOA1

01-26-10 : NOA2

127 days @ USCIS

NVC

02-01-10 : NVC receives case / Case number assigned / Gave e-mail addresses to operator

02-05-10 : Received DS-3032 & AOS bill / Sent DS-3032 (E-mail) / Paid AOS Bill

02-07-10 : Sent DS-3032 (Snail Mail)

02-09-10 : AOS fee showing PAID

02-11-10 : DS-3032 Delivered to NVC / E-mail confirmation DS-3032 (signed by JESUS)

02-12-10 : IV Bill generated

02-19-10 : IV Bill paid

02-26-10 : AoS package & DS-230 Sent

03-02-10 : AoS package & DS-230 received at 4:11am (Signed by RUDOLPH)

03-05-10 : AVR Updated - Received DS-230

03-16-10 : 3 RFE's received (Incorrect Police Certificate DS230 / I-864 / I-864A

05-20-10 : CASE COMPLETE & SIGN IN FAIL

05-22-10 : New RFE checklist received stating ONLY I-864A needs to be resent.

05-23-10 : Called NVC. AVR claimed our case was 'COMPLETE'

05-26-10 : Interview date set for 07-20-2010

115 days @ NVC

242 DAYS TOTAL SO FAR

US CONSULATE (SYDNEY)

07-12-10 : Medical @ 10am

07-20-10 : Interview @ 9am VISA APPROVED

07-26-10 : VISA IN HAND!!!!!

08-10-10 : P.O.E. Los Angeles

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
PCCs are required for every place you've lived in for more than 6 months after the age of 16. It doesn't matter if you were visiting.

Hi Sachinky, are you sure about the PCC?? I am going to be crazy then....I spent 8 years in 7 states of India!!!!......Currently I am in Kochi (Kerala) and I got PCC from RPO Kochi and also PCC from Commissioner of Police, Kochi....If this is not the case then I am blind how to proceed .....U can refer the trailing links

http://travel.state.gov/visa/frvi/reciproc...ocity_3582.html

http://www.visajourney.com/forums/index.ph...p;#entry3209822

USCIS journey:

09-21-2009: I-130 package sent to Chicago.

09-24-2009: Check cashed.

09-28-2009: I-130 NOA1 hard copy received

09-30-2009: Touched

01-13-2010: Touched

01-14-2010: Touched

01-19-2010: Touched

01-20-2010: Touched

01-21-2010: Touched and I130 approved-after 113 days of NOA1

NVC Journey

27-01-2010 NVC received the case

28-01-2010 NVC case# assigned,email address provided over phone

02-02-2010 Received DS-3032 and AoS bills in mail

04-02-2010 Paid Bills

05-02-2010 Bill status shown as PAID

08-02-2010 Sent DS230 and AoS packages

10-02-2010 NVC received the documents

19-02-2010 AVR updated saying "missing information"

23-02-2010 RFE-email received from NVC for incomplete biographic information [Q30]

24-02-2010 Hard copy send back to NVC with DS230-part1 filled and signed along with the bar code letter received

02-03-2010 AVR updated-"NVC received the checklist response on March 2nd"

08-03-2010 Login Failed !!! AVR updated-"Your case was completed on March 8th"

11-03-2010 Interview scheduled on 13-Apr-2010@Chennai,India-email received from NVC-

43 days@NVC and 156 days from I130 filed for case complete...!!!!!!

16-03-2010 Packet reached Chennai Embassy (used DHL tracking method)

22-03-2010 Chennai website updated with my case# in the April IV appointments!!

30-03-2010 Medical exam scheduled@Appolo,Chennai

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Australia
Timeline
where is the best place to look at this? Yours must be coming soon!!

Congrats!! ... guess everyone's will be coming in the next week. Most exciting ... :star:

OUR JOURNEY SO FAR: (dd/mm/yyyy)

18/09/09 - CR1 NOA1

16/07/10 - POE LAX (256 days NOA1 to interview)

27/09/10 - Aussie/American bun in the oven due May 10, 2011

06/01/11 - Submitted change of address online to USCIS. Mailed I-865 for sponsor. Neverending!

05/05/11 - Bouncing baby boy arrives

10/07/12 - Sent I-751

13/07/12 - I-751 NOA1

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
massive congrats. Check the wiki and guides at the top of the pages.

were you getting touched allong the way or did the NOA2 come from no where? :)

I had not been touched since the day they mailed out my NOA1...Then Bam...Sunday night I check email and there it is...so it literally came out of nowhere. I guess after Christmas break they are hitting September filers hard! I'd bet most all September filers should find something out soon! I was a little worried as I am not using a lawyer..I am processing all this myself with the help of google and of course my fellow VJ members! Thanks guys for all your help!

Personal Journey

2009-01-09 : Met online

2009-08-20 : Wedding in Bangalore, India

2011-06-14 : Hubby finally makes the permanent move to USA

2011-07-20 : Two Pink Lines (Oops!)

2012-04-02 : Our daughter Lili is born!

NVC ~CR-1 Visa~ Journey

2010-02-01 : NVC case # assigned

2010-02-05 : DS-3032/AOS Bill Generated

2010-02-07 : DS-3032 e-mailed; AOS/I-864 Bill (paid online $70)

2010-02-12 : e-mailed DS-3032 accepted by NVC

2010-03-05 : Sent In Completed I-864

2010-03-15 : IV Fee bill generated, paid online $400

2010-06-17 : Sent In Completed DS-230 Packet (took forever to get PCC and BC)

2010-06-18 : DS-230 Signed for by NVC

2010-06-23 : AVR updates "The checklist letter response has been received. Wait 6-8 weeks and you will be notified.

2010-08-06 : Sign in Failed: Finally

2010-08-10 : AVR updates "The case was complete on August 9..."

2010-08-13 : NVC e-mailed an interview date for September 2 2010 9AM - per our request--rescheduled for Oct 4 2010

2010-09-23 : Medical scheduled

2010-10-04 : Interview Failed - Required additional documetation because of sponser job change

2010-10-10 : Submitted additional paperwork to VFS in Bangalore

2010-10-21 : Received notice that Visa is APPROVED!!!

2010-10-24 : Visa in hand

2010-12-23 : US entry

2011-02-14 : Received Green Card

2011-02-15 : Welcome letter sent

USCIS ~Removal of Conditions~ Journey

2012-09-30 : I-751 package sent via USPS (Vermont)

2012-10-05 : Check Cashed

2012-10-09 : Received NOA Letter dated 10-03-2012

Link to comment
Share on other sites

Filed: Other Country: India
Timeline
I had not been touched since the day they mailed out my NOA1...Then Bam...Sunday night I check email and there it is...so it literally came out of nowhere. I guess after Christmas break they are hitting September filers hard! I'd bet most all September filers should find something out soon! I was a little worried as I am not using a lawyer..I am processing all this myself with the help of google and of course my fellow VJ members! Thanks guys for all your help!

"smsgrl2009" ... Congratulations... :dance:

Now, get ready for NVC.. which is itself a lot of work :innocent: but worth it.

Link to comment
Share on other sites

Yeahhhhhhhhhhhhhhhhhhhh!!!!!!!!!!!!!!! I opened up my email and got the notice that my application has been approved as of Jan 22!! NOA2 is on the way!! Not sure what happens next but I know this is very good for us!! Yeahhhhh....hang in there guys...I guess I am heading to NVC now!

:dance: CONGRATSSSSSS to you and yours SMSGRL... :dance: I hope ours is coming this week... :whistle:

USCIS

Service Center : Calif Service Center - Consulate : Manila, Philippines

09/11/2009 I-130 Sent FedEX

09/21/2009 I-130 NOA1 issued

01/27/2010 I-130 Approved

02/02/2010 NOA2 hard copy received in mail

NVC

02/01/2010 NVC received case

02/02/2010 Case number assigned - Email addresses given to NVC operator

02/23/2010 Received DS-3032 / I-864 Bill (Case1 Wife)

02/24/2010 Received DS-3032 / I-864 Bill (Case2 Step-daughter)

02/24/2010 Pay I-864 Bill (online)

02/24/2010 DS3032 sent via email

02/24/2010 AOS $70 bill paid. (1 payment for both cases. Wish they would do that for IV Bill)

02/25/2010 AOS bill shows as PAID. Cover sheet printed

03/02/2010 DS3032 accepted - emailed to wifes account not mine...

03/02/2010 IV bill generated and paid

03/10/2010 AOS package sent to NVC

03/11/2010 AOS recieved. signed for by J.Desmond

08/21/2010 DS230 package sent to NVC

08/23/2010 DS230 package recieved. signed for by J.Desmond

10/18/2010 Sign In failed - 1 RFE

xx/xx/2010 Case Completed at NVC

xx/xx/2010 Left NVC

US Embassy Manila

xx/xx/2010 Medical Appointment (St. Lukes)

xx/xx/2010 Interview Date

xx/xx/2010 Visa Received

xx/xx/2010 US Entry – POE

3dflags_usa0001-0003a.gif3dflags_phl0001-0003a.gif

Link to comment
Share on other sites

Filed: Country: India
Timeline
Hi Sachinky, are you sure about the PCC?? I am going to be crazy then....I spent 8 years in 7 states of India!!!!......Currently I am in Kochi (Kerala) and I got PCC from RPO Kochi and also PCC from Commissioner of Police, Kochi....If this is not the case then I am blind how to proceed .....U can refer the trailing links

http://travel.state.gov/visa/frvi/reciproc...ocity_3582.html

http://www.visajourney.com/forums/index.ph...p;#entry3209822

That is totally wrong about PCC from every place in India. I talked to a few people on here who got their visas from Chennai consulate and only local PCC and passport office pcc is needed for India. However, If you lived abroad then I am not sure. Search for India PCC on VJ and you will find more experiences from people who have gotten their visas. To be on the safe side you might want to call the consulate and double check.

9/1/2009: Applied for I-130

9/14/2009: NOA1 for I-130

9/21/2009: NOA1 for I-129F (CSC)

9/25/2009: NOA1 received for I-129F (receipt of mail)

01/08/2010 : Thank you very much Jesus..... NOA 2 129F

01/08/2010 : NOA 2 I-130

01/15/2010 : Embassy gets the approval notice (Awesome..Love K3...so glad we have done K3)

01/20/2010: Embassy schedules interview for K3

02/19/2010: K3 interview over and approved.

[Thank You very much Jesus and our heavenly father.]

Link to comment
Share on other sites

hahahahaha another Touche today..hahaha i will just laugh...5 touches..and nothing change...this people are crazy..

USCIS-NVC Journey

09-01-2009 I 130 filled under LPR Category

09-08-2009 NOA1

11-20-2009 Upgraded status

01-27-2010 NOA2

02-05-10......Case # Assigned

03-31-10........AVR inputted Case Complete

04-29-2010...Interview date assigned via Operator & email received...

06-02-2010...Medical Exam @consultorio de visas,Sto Dgo.

06-16-2010....Interview @ Santo Domingo 7.30 A.M. APPROVED

08-06-2010..... POE date @ Hartsfield-Jackson Atlanta.. connecting flight to Washington DC

event.png

Link to comment
Share on other sites

Filed: Timeline

wow, congratulations :thumbs: :thumbs: :thumbs: just out of curiosity, did u meet your SO on sept 1st 2009 and start I-130 on sept 18th 2009? think about that before your interview if i is not a typo

Yeahhhhhhhhhhhhhhhhhhhh!!!!!!!!!!!!!!! I opened up my email and got the notice that my application has been approved as of Jan 22!! NOA2 is on the way!! Not sure what happens next but I know this is very good for us!! Yeahhhhh....hang in there guys...I guess I am heading to NVC now!

I-130 FILED: 8/26/09

TOUCHED AND APPROVED 12/23/09. THE LORD IS FAITHFUL ALWAYS

NVC: CASE COMPLETE: Feb 3rd, 2010

INTERVIEW: Mar 12th, 7:00 a.m : APPROVED

POE / ARRIVAL: Washington D.C. April 8th.

Al hamdu li'lah, Allahu Akbar, Allahu Akbar, Allahu Akbar, Al hamdu li'lah robbi al amin

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

No, I meant that for Mike.

For India, the PCC is only for your current place of residence and your regional passport office that issued your current valid passport. So 2 PCCs for India.

03/27/2009: Engaged in Ithaca, New York.
08/17/2009: Wedding in Calcutta, India.
09/29/2009: I-130 NOA1
01/25/2010: I-130 NOA2
03/23/2010: Case completed.
05/12/2010: CR-1 interview at Mumbai, India.
05/20/2010: US Entry, Chicago.
03/01/2012: ROC NOA1.
03/26/2012: Biometrics completed.
12/07/2012: 10 year card production ordered.

09/25/2013: N-400 NOA1

10/16/2013: Biometrics completed

12/03/2013: Interview

12/20/2013: Oath ceremony

event.png

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...