Called NVC and operator says , case under review. Takes two to 4 weeks.

" how many weeks has it been since Aug 4" that is when my IV package arrived was entered into NVC system.

she says, i cant answer specifics, but your whole package recieved on Aug 4 is under review. and takes 2-4 weeks. it can take longer"

"what you mean by longer. Are they backed up right now"

" I can't tell you that.

what do I do. what should be the course of action for me. do I start contacting Senators, congressman, Bill. Hillay clinton, Barak Hussein, Madeline Albright, Colin powell, who else.

Help

NOA1 recieved NOV 8, 2008

Approval: approval email "Approval Notice Sent on July 6." Hard copy recieved on July 11

NVC:

NVC Case Number Assigned- July 16th, 2009

DS-3032/AOS Generated- July 21st, 2009

DS-3032 - Emailed today7/22/09, got auto response

Recieved AOS fee bill and original DS-3032 in mail and AOS Paid- 7/24/09

AOS Bill Shows as PAID -7/25/09

printed coversheets for AOS- 7/25/09

I-864 Package Generated - no need/online payment

Mailed I-864 Package and DS-3032- Expressed mailed USPS 7/27/09

I-864 Package Received at NVC - 7/28/09, at 11:22 AM

DS-3032 accepted and IV bill generated - 7/29/09

Paid IV Bill -7/29/09, at 8:40 AM EDT

IV Bill Show as PAID - 7/30/29. printed the Reciepts . mailing civil docs ( AVR says Waiting for Biographic documents from the petitioner )

Mailed (DS-230) IV Package - 7/31/09

NVC Rcieved IV package: Aug 4, 2009

RFE email recieved ( AOS) : Aug 7, on child case . Need I-864w not I-864 ( those applying for children be warned)

Fedexed I 864w : 08/07/09 with the bar coded page

RFE recieved by NVC: 08/10/09

Called NVC and confirmed not in AP: Aug 24

CASE COMPLETE- Aug 26/ 2009

Interview email recieved : Sept 2, Interview date is Oct 14

Medical completed: Sep 7, all negative. Sealed report on Oct 8.

VISA approved , 23 Oct

passport picked up , 26 Oct

POE and US Entered, 31 Oct.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

What? Awww, Mohan I am so sorry to hear that! It's probably some red-tape mumbo-jumbo... I can't advise you as to your next step but it's only a little past 3 weeks now -- wait the full 4 and then see what's going on...

I'm sorry about this -- if it makes you feel even a teeny-tiny bit better, we here in Canada have to wait months for our interviews to take place so I too am in a black hole of waiting.

Sorry, Mohan...

this too shall pass...

:)

LGG

Called NVC and operator says , case under review. Takes two to 4 weeks.

" how many weeks has it been since Aug 4" that is when my IV package arrived was entered into NVC system.

she says, i cant answer specifics, but your whole package recieved on Aug 4 is under review. and takes 2-4 weeks. it can take longer"

"what you mean by longer. Are they backed up right now"

" I can't tell you that.

what do I do. what should be the course of action for me. do I start contacting Senators, congressman, Bill. Hillay clinton, Barak Hussein, Madeline Albright, Colin powell, who else.

Help

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

What? Awww, Mohan I am so sorry to hear that! It's probably some red-tape mumbo-jumbo... I can't advise you as to your next step but it's only a little past 3 weeks now -- wait the full 4 and then see what's going on...

I'm sorry about this -- if it makes you feel even a teeny-tiny bit better, we here in Canada have to wait months for our interviews to take place so I too am in a black hole of waiting.

Sorry, Mohan...

this too shall pass...

:)

LGG

Called NVC and operator says , case under review. Takes two to 4 weeks.

" how many weeks has it been since Aug 4" that is when my IV package arrived was entered into NVC system.

she says, i cant answer specifics, but your whole package recieved on Aug 4 is under review. and takes 2-4 weeks. it can take longer"

"what you mean by longer. Are they backed up right now"

" I can't tell you that.

what do I do. what should be the course of action for me. do I start contacting Senators, congressman, Bill. Hillay clinton, Barak Hussein, Madeline Albright, Colin powell, who else.

Help

Mo, call and ask if your case is in AP!! NVC will not tell you it is, they will not voulunteer that info, YOU have to ask that dirty question!!!! I pray it is not in AP. Call and ask. Its taking way too long to complete your case.

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline

Lgg, thanks. I know. but you are very close now. I wish you all the best. Only interview left. you should be done in few weeks.

paris,

I suspect AP as well. How long does one last on AP at NVC. very long, few weeks, few months. Few days.

I will call this afternoon and ask that question. Thanks for the suggestion.

I dont know how long I am stuck at NVC> I wonder if anyone else has endured similar timeline at NVC ? ANYBODY out THERE!!!!

thanks in Advance

NOA1 recieved NOV 8, 2008

Approval: approval email "Approval Notice Sent on July 6." Hard copy recieved on July 11

NVC:

NVC Case Number Assigned- July 16th, 2009

DS-3032/AOS Generated- July 21st, 2009

DS-3032 - Emailed today7/22/09, got auto response

Recieved AOS fee bill and original DS-3032 in mail and AOS Paid- 7/24/09

AOS Bill Shows as PAID -7/25/09

printed coversheets for AOS- 7/25/09

I-864 Package Generated - no need/online payment

Mailed I-864 Package and DS-3032- Expressed mailed USPS 7/27/09

I-864 Package Received at NVC - 7/28/09, at 11:22 AM

DS-3032 accepted and IV bill generated - 7/29/09

Paid IV Bill -7/29/09, at 8:40 AM EDT

IV Bill Show as PAID - 7/30/29. printed the Reciepts . mailing civil docs ( AVR says Waiting for Biographic documents from the petitioner )

Mailed (DS-230) IV Package - 7/31/09

NVC Rcieved IV package: Aug 4, 2009

RFE email recieved ( AOS) : Aug 7, on child case . Need I-864w not I-864 ( those applying for children be warned)

Fedexed I 864w : 08/07/09 with the bar coded page

RFE recieved by NVC: 08/10/09

Called NVC and confirmed not in AP: Aug 24

CASE COMPLETE- Aug 26/ 2009

Interview email recieved : Sept 2, Interview date is Oct 14

Medical completed: Sep 7, all negative. Sealed report on Oct 8.

VISA approved , 23 Oct

passport picked up , 26 Oct

POE and US Entered, 31 Oct.

Link to comment
Share on other sites

Lgg, thanks. I know. but you are very close now. I wish you all the best. Only interview left. you should be done in few weeks.

paris,

I suspect AP as well. How long does one last on AP at NVC. very long, few weeks, few months. Few days.

I will call this afternoon and ask that question. Thanks for the suggestion.

I dont know how long I am stuck at NVC> I wonder if anyone else has endured similar timeline at NVC ? ANYBODY out THERE!!!!

thanks in Advance

There is no timeline for AP, it ends when it ends, Im sorry. I wish I had a more positive answer for you.

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Lgg, thanks. I know. but you are very close now. I wish you all the best. Only interview left. you should be done in few weeks.

paris,

I suspect AP as well. How long does one last on AP at NVC. very long, few weeks, few months. Few days.

I will call this afternoon and ask that question. Thanks for the suggestion.

I dont know how long I am stuck at NVC> I wonder if anyone else has endured similar timeline at NVC ? ANYBODY out THERE!!!!

thanks in Advance

There is no timeline for AP, it ends when it ends, Im sorry. I wish I had a more positive answer for you.

Mo, glad your not in AP. My Mo says congrats, I talked to him right after talking to you!!!!

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

I agree with calling to see about AP but you just have to wait. You haven't been at NVC that long, honestly.

Met: 2004-07-18

Islamic marriage: 2006-07-31

Marriage : 2008-12-27

Entry San Fran 2009-09-27

Hubby is HOME!!!!

Received SSN 2009-10-06

Received welcome letter 2009-10-10

GREEN CARD!!! 2009-10-13

Driver's License 2009-10-26

HUBBY FOUND A JOB!!! after about 4 months of being here :)

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Egypt
Timeline

Sometimes petitions are ' pulled randomly ' for checks before NVC sends them to the designated Embassies.

Don't just open your mouth and prove yourself a fool....put it in writing.

It gets harder the more you know. Because the more you find out, the uglier everything seems.

kodasmall3.jpg

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline

I called Last night and spoke to an operator. She put me on hold and came back to tell me that my case was in teh review department. So i asked if I were in AP she said no, she did not see anything of that nature. and she said I was still going through normal review. She said they may be backup and that is why it is taking time

Just to confirm i called this morning again, and spoke to a different operator. I asked the same question, " Am I in AP" She agian said no , your case is going through normal review processing and takes 2-4 weeks to complete the review, sometimes takes longer

Kenza, i heard and pray and wish you all the best. GOd is good. he will take care. :)

Out of curiousity, have I not been at NVC long enough? is it normal to be at NVC for this long ?

NOA1 recieved NOV 8, 2008

Approval: approval email "Approval Notice Sent on July 6." Hard copy recieved on July 11

NVC:

NVC Case Number Assigned- July 16th, 2009

DS-3032/AOS Generated- July 21st, 2009

DS-3032 - Emailed today7/22/09, got auto response

Recieved AOS fee bill and original DS-3032 in mail and AOS Paid- 7/24/09

AOS Bill Shows as PAID -7/25/09

printed coversheets for AOS- 7/25/09

I-864 Package Generated - no need/online payment

Mailed I-864 Package and DS-3032- Expressed mailed USPS 7/27/09

I-864 Package Received at NVC - 7/28/09, at 11:22 AM

DS-3032 accepted and IV bill generated - 7/29/09

Paid IV Bill -7/29/09, at 8:40 AM EDT

IV Bill Show as PAID - 7/30/29. printed the Reciepts . mailing civil docs ( AVR says Waiting for Biographic documents from the petitioner )

Mailed (DS-230) IV Package - 7/31/09

NVC Rcieved IV package: Aug 4, 2009

RFE email recieved ( AOS) : Aug 7, on child case . Need I-864w not I-864 ( those applying for children be warned)

Fedexed I 864w : 08/07/09 with the bar coded page

RFE recieved by NVC: 08/10/09

Called NVC and confirmed not in AP: Aug 24

CASE COMPLETE- Aug 26/ 2009

Interview email recieved : Sept 2, Interview date is Oct 14

Medical completed: Sep 7, all negative. Sealed report on Oct 8.

VISA approved , 23 Oct

passport picked up , 26 Oct

POE and US Entered, 31 Oct.

Link to comment
Share on other sites

I called Last night and spoke to an operator. She put me on hold and came back to tell me that my case was in teh review department. So i asked if I were in AP she said no, she did not see anything of that nature. and she said I was still going through normal review. She said they may be backup and that is why it is taking time

Just to confirm i called this morning again, and spoke to a different operator. I asked the same question, " Am I in AP" She agian said no , your case is going through normal review processing and takes 2-4 weeks to complete the review, sometimes takes longer

Kenza, i heard and pray and wish you all the best. GOd is good. he will take care. :)

Out of curiousity, have I not been at NVC long enough? is it normal to be at NVC for this long ?

Mo, any news?????? :dance::whistle::whistle:

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline

Yes, called this monring and AVR says " we completed this case on Aug 26th. Please allow ..."

Called back and spoke to an operator. She confirmed both the cases have beeon completed as of yesterday. Cannot logint o NVC payment site either.

She also said, "NVC schedules interview on the second week of a month for the following month. we cannot give you sepetember interview date for the load the kathmandu Consular office has. So call back on or after Sept 15 and you may get October date. Keep in mind that depends on the couslar business, meaning how swamped they are."

Well, seems like i am on the final lap of the journey.

Is it time for the Medical ?

NOA1 recieved NOV 8, 2008

Approval: approval email "Approval Notice Sent on July 6." Hard copy recieved on July 11

NVC:

NVC Case Number Assigned- July 16th, 2009

DS-3032/AOS Generated- July 21st, 2009

DS-3032 - Emailed today7/22/09, got auto response

Recieved AOS fee bill and original DS-3032 in mail and AOS Paid- 7/24/09

AOS Bill Shows as PAID -7/25/09

printed coversheets for AOS- 7/25/09

I-864 Package Generated - no need/online payment

Mailed I-864 Package and DS-3032- Expressed mailed USPS 7/27/09

I-864 Package Received at NVC - 7/28/09, at 11:22 AM

DS-3032 accepted and IV bill generated - 7/29/09

Paid IV Bill -7/29/09, at 8:40 AM EDT

IV Bill Show as PAID - 7/30/29. printed the Reciepts . mailing civil docs ( AVR says Waiting for Biographic documents from the petitioner )

Mailed (DS-230) IV Package - 7/31/09

NVC Rcieved IV package: Aug 4, 2009

RFE email recieved ( AOS) : Aug 7, on child case . Need I-864w not I-864 ( those applying for children be warned)

Fedexed I 864w : 08/07/09 with the bar coded page

RFE recieved by NVC: 08/10/09

Called NVC and confirmed not in AP: Aug 24

CASE COMPLETE- Aug 26/ 2009

Interview email recieved : Sept 2, Interview date is Oct 14

Medical completed: Sep 7, all negative. Sealed report on Oct 8.

VISA approved , 23 Oct

passport picked up , 26 Oct

POE and US Entered, 31 Oct.

Link to comment
Share on other sites

Yes, called this monring and AVR says " we completed this case on Aug 26th. Please allow ..."

Called back and spoke to an operator. She confirmed both the cases have beeon completed as of yesterday. Cannot logint o NVC payment site either.

She also said, "NVC schedules interview on the second week of a month for the following month. we cannot give you sepetember interview date for the load the kathmandu Consular office has. So call back on or after Sept 15 and you may get October date. Keep in mind that depends on the couslar business, meaning how swamped they are."

Well, seems like i am on the final lap of the journey.

Is it time for the Medical ?

Really??? Hum for some reason I already knew that, LOL Congrats Dearest :dance::dance:

Wait till she gets the letter, then do medical, but in meanwhile, check on VJ embassy section for the embassy where she is at, they may lf listed doctors to see for the medical. Again, congrats!!! Could not of happened to a nicer person!!!!

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline

Mohan ji, good to hear thigs have fallen in place for you after a long journey. My jouney started last month and seems its going to be a long impatient/headache/heartache filled journey..But got to hang in here..

What is an AP anyways?

Good luck!

2009-09-30 -> I-129 Approved

2009-09-30 -> I-130 Approved

-------NVC----------

2009-10-14 -> NVC Received

2009-10-15 -> Received/Sent DS-3032

2009-10-15 -> Received/Paid I-864 Bill

2009-10-19 -> Send I-864 Packet

2009-10-26 -> NVC Received DS-3032

2009-10-28 -> Receive/Pay IV Bill Pay

2009-10-29 -> Send DS-230 (Overnight)

2009-10-30 -> NVC Received (DS-230) 11:00 AM

2009-11-03 -> NVC Entered DS-230 in system.

2009-11-09 -> Received email requesting DS-230....

2009-11-12 -> Log in to Consular Electronic App Center failed!!

2009-11-13 -> Case complete

2010-01-12 -> Rescheduled from [2010-01-25] Interview [Approved]

2010-01-14 -> Pick up passport.

2010-01-17 -> Depart

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline
Mohan ji, good to hear thigs have fallen in place for you after a long journey. My jouney started last month and seems its going to be a long impatient/headache/heartache filled journey..But got to hang in here..

What is an AP anyways?

Good luck!

AP bhaneko Additional Processing pani bhanchan, Administrative processing pani bhanchan.

NVC ma chai Additional processing re ani Embassy level ma chai Administrative Processing re. Khai ke khai ke .....ma ta kurai bujhdina

aba tetro sabai processing garera GC , tespachi thap processing garera Citizenship li sakeko lai pheri ke ko Additional Processing.

Luckily my case was not in AP. In fact what i have found or heard is usually I-130 cases are not in AP at the NVC level becasue if any needs to conducted, it will be done at the Embassy.

Tehi bhayera. Tara yo process sakayera visa nalagunjel cahi yestai khai ke khai ke chai bhai rakhne kya.... :)

NOA1 recieved NOV 8, 2008

Approval: approval email "Approval Notice Sent on July 6." Hard copy recieved on July 11

NVC:

NVC Case Number Assigned- July 16th, 2009

DS-3032/AOS Generated- July 21st, 2009

DS-3032 - Emailed today7/22/09, got auto response

Recieved AOS fee bill and original DS-3032 in mail and AOS Paid- 7/24/09

AOS Bill Shows as PAID -7/25/09

printed coversheets for AOS- 7/25/09

I-864 Package Generated - no need/online payment

Mailed I-864 Package and DS-3032- Expressed mailed USPS 7/27/09

I-864 Package Received at NVC - 7/28/09, at 11:22 AM

DS-3032 accepted and IV bill generated - 7/29/09

Paid IV Bill -7/29/09, at 8:40 AM EDT

IV Bill Show as PAID - 7/30/29. printed the Reciepts . mailing civil docs ( AVR says Waiting for Biographic documents from the petitioner )

Mailed (DS-230) IV Package - 7/31/09

NVC Rcieved IV package: Aug 4, 2009

RFE email recieved ( AOS) : Aug 7, on child case . Need I-864w not I-864 ( those applying for children be warned)

Fedexed I 864w : 08/07/09 with the bar coded page

RFE recieved by NVC: 08/10/09

Called NVC and confirmed not in AP: Aug 24

CASE COMPLETE- Aug 26/ 2009

Interview email recieved : Sept 2, Interview date is Oct 14

Medical completed: Sep 7, all negative. Sealed report on Oct 8.

VISA approved , 23 Oct

passport picked up , 26 Oct

POE and US Entered, 31 Oct.

Link to comment
Share on other sites

  • 3 weeks later...
Filed: Other Country: Nepal
Timeline

hello Mohan bahadur ji,

My parents also have interview scheduled on Oct 14. As i see, u guys already have medical done. Did she did emdical done before embessy called? Can we just directly got o the doctor's place for the medical or have to go after embessy called?

IR5 Petition for Parents

01/20/2009 : Petitions package mailed to Chicago Lockbox (priority mail)

01/23/2009 : Package delivered (USPS notification)

01/29/2009 : Check cashed ( for Father)

02/02/2009 : Check cashed (for Mother)

02/03/2009 : Received NOA as notice date on 29th Jan (Father)

02/06/2009 : Received NOA as notice date on 2nd Feb (Mom)

05/26/2009 : Received I130 Approval letter (notice date May 19, 2009)

06/06/2009 : Received DS-3032/I-864 Bill

06/06/2009 : Paid I-864 Bill Online

06/09/2009 : Return Completed DS-3032 (by email)

06/23/2009 : DS-3032 accepted (by email)

06/24/2009 : Received IV Bill

06/24/2009 : Paid IV Bill

06/26/2009 : Returned I-864 package

07/24/2009 : Returned DS 230 package

08/11/2009 : RFE sent to NVC for Petitioners Birth Certificate

08/21/2009 : Case Completed at NVC (As per AVR)

09/02/2009 : Interview date assigned for 10/14/2009

09/14/2009 : NVC Left

09/22/2009 : Embessy received documents

10/06/2009 : Medical completed

10/14/2009 : Medical submitted, finger print, asking for to come again on Oct 23rd.

10/23/2009 : Visa Approved

03/04/2010 : US Entry (Houston POE)

03/17/2010 : SS Cards Received

03/25/2010 : Received Welcome Letter

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...