Jump to content
Joyce/Jeremy

Administrative Processing/Review

 Share

118 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

better to wait 6 weeks than 3 or 4 months. i don't know too...this word "review" is really stupid because they should have done all their reviewing while the case was still at NVC...

June 2004...i sat down on the bench to tie my shoelaces (literally) not knowing i would marry the man i just sat down next to...

Oct. 18, 2007...Married

Oct. 27, 2007...my beautiful son is born

USCIS IR-1/CR-1 Visa Journey

Service Center : Vermont Service Center

Consulate: Manila, Philippines

Feb. 05, 2009: I 130 sent

Feb. 12, 2009: NAO1

Feb. 17, 2009: first touch

Feb. 18, 2009: Touch

May 01, 2009: Touch and NAO2 mailed...yeah hey!

May 08, 2009: NAO2 in the mail

NVC Journey

May 15, 2009: NVC case number

May 18, 2009: Gave email add to NVC

May 28, 2009: Received DS 3032 / I-864 Bill

June 1, 2009: Paid I-864 Bill

June 5, 2009: sent AOS stuff

June 29, 2009: sent DS 230

June 28 - Aug. 8: i spent time with my boys in the philippines

IN A BIG HUGE BLUR...OUR CASE WAS COMPLETED AUGUST 5, 2009 (AFTER RFE: HUSBAND'S ORIGINAL BIRTH CERTIFICATE) AND MY HUSBANDS INTERVIEW WILL BE SEPTEMBER 25, 2009...WE HOPE AND PRAY WE GET IT!

CURRENTLY DOING: PREPARING DOCUMENTS FOR MY SON'S PETITION!

...I am one day further from the last time I saw you but I am one day closer to the next time I will...

Link to comment
Share on other sites

  • Replies 117
  • Created
  • Last Reply

Top Posters In This Topic

Filed: K-1 Visa Country: Philippines
Timeline
better to wait 6 weeks than 3 or 4 months. i don't know too...this word "review" is really stupid because they should have done all their reviewing while the case was still at NVC...

Hello,

yeah but 6 weeks is still long time to wait,,yes i agree!for sure you really miss your husband too..and i do feel same with my fiance. :crying::crying::crying: im just worried because my fiance ITR didnt reach the poverty guideline..but i did bring co sponsor forms that time but pre screener didnt even bother to ask me,,so i keep it..but this year my fiance income is above to what they ask.so im a little worried about it.. :crying: maybe they wont consider it! :(:(:(:(:( i having sleepless night coz if this..im too worried..

But i do pray all the time and have faith to ouR almighty father!

GOD BLESS!

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

if he did not make it to the required income, the consul would have told you so. but since he didn't then you are okay in that area. usually they will tell you straightforward what you need to bring or need to do.

June 2004...i sat down on the bench to tie my shoelaces (literally) not knowing i would marry the man i just sat down next to...

Oct. 18, 2007...Married

Oct. 27, 2007...my beautiful son is born

USCIS IR-1/CR-1 Visa Journey

Service Center : Vermont Service Center

Consulate: Manila, Philippines

Feb. 05, 2009: I 130 sent

Feb. 12, 2009: NAO1

Feb. 17, 2009: first touch

Feb. 18, 2009: Touch

May 01, 2009: Touch and NAO2 mailed...yeah hey!

May 08, 2009: NAO2 in the mail

NVC Journey

May 15, 2009: NVC case number

May 18, 2009: Gave email add to NVC

May 28, 2009: Received DS 3032 / I-864 Bill

June 1, 2009: Paid I-864 Bill

June 5, 2009: sent AOS stuff

June 29, 2009: sent DS 230

June 28 - Aug. 8: i spent time with my boys in the philippines

IN A BIG HUGE BLUR...OUR CASE WAS COMPLETED AUGUST 5, 2009 (AFTER RFE: HUSBAND'S ORIGINAL BIRTH CERTIFICATE) AND MY HUSBANDS INTERVIEW WILL BE SEPTEMBER 25, 2009...WE HOPE AND PRAY WE GET IT!

CURRENTLY DOING: PREPARING DOCUMENTS FOR MY SON'S PETITION!

...I am one day further from the last time I saw you but I am one day closer to the next time I will...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
if he did not make it to the required income, the consul would have told you so. but since he didn't then you are okay in that area. usually they will tell you straightforward what you need to bring or need to do.

yes they didnt even bothered to tell me that..so i can show the documents that i have..ahhh i see now i understand,,thanx taj's..well,let just pray..hoping our case will be done soon and we will be together with our love ones,,...

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

my husband was also surprised because they didnt ask for any more documents. he was also asking them to look at my tax returns, my paychecks from work and other documents that he brought but the consul said it was okay. they just looked at our pictures and our chat logs and phone logs. the consul asked alot of questions. the consul was pretty nice i guess...when he asked about my son's petition my husband said that we have already processed it and he said, then i guess i will see you again here for your son's interview. about my work he just asked if i work full time as a nurse...and if my husband ever worked in any country before.

ill keep calling every monday and friday though...

June 2004...i sat down on the bench to tie my shoelaces (literally) not knowing i would marry the man i just sat down next to...

Oct. 18, 2007...Married

Oct. 27, 2007...my beautiful son is born

USCIS IR-1/CR-1 Visa Journey

Service Center : Vermont Service Center

Consulate: Manila, Philippines

Feb. 05, 2009: I 130 sent

Feb. 12, 2009: NAO1

Feb. 17, 2009: first touch

Feb. 18, 2009: Touch

May 01, 2009: Touch and NAO2 mailed...yeah hey!

May 08, 2009: NAO2 in the mail

NVC Journey

May 15, 2009: NVC case number

May 18, 2009: Gave email add to NVC

May 28, 2009: Received DS 3032 / I-864 Bill

June 1, 2009: Paid I-864 Bill

June 5, 2009: sent AOS stuff

June 29, 2009: sent DS 230

June 28 - Aug. 8: i spent time with my boys in the philippines

IN A BIG HUGE BLUR...OUR CASE WAS COMPLETED AUGUST 5, 2009 (AFTER RFE: HUSBAND'S ORIGINAL BIRTH CERTIFICATE) AND MY HUSBANDS INTERVIEW WILL BE SEPTEMBER 25, 2009...WE HOPE AND PRAY WE GET IT!

CURRENTLY DOING: PREPARING DOCUMENTS FOR MY SON'S PETITION!

...I am one day further from the last time I saw you but I am one day closer to the next time I will...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
my husband was also surprised because they didnt ask for any more documents. he was also asking them to look at my tax returns, my paychecks from work and other documents that he brought but the consul said it was okay. they just looked at our pictures and our chat logs and phone logs. the consul asked alot of questions. the consul was pretty nice i guess...when he asked about my son's petition my husband said that we have already processed it and he said, then i guess i will see you again here for your son's interview. about my work he just asked if i work full time as a nurse...and if my husband ever worked in any country before.

ill keep calling every monday and friday though...

Hello,

ohh yeah same as mine didnt ask the other forms from my fiance..well for sure your in good shape..just need to wait for your son's interview..ohh everyday?hmmm wish my fiance do it everyday..hehehe..but he did once a week..hopefully their will be no problem w/ our documents..goodluck to you taj's..soon you will be together with your love ones..it takes time..

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

keep in touch

June 2004...i sat down on the bench to tie my shoelaces (literally) not knowing i would marry the man i just sat down next to...

Oct. 18, 2007...Married

Oct. 27, 2007...my beautiful son is born

USCIS IR-1/CR-1 Visa Journey

Service Center : Vermont Service Center

Consulate: Manila, Philippines

Feb. 05, 2009: I 130 sent

Feb. 12, 2009: NAO1

Feb. 17, 2009: first touch

Feb. 18, 2009: Touch

May 01, 2009: Touch and NAO2 mailed...yeah hey!

May 08, 2009: NAO2 in the mail

NVC Journey

May 15, 2009: NVC case number

May 18, 2009: Gave email add to NVC

May 28, 2009: Received DS 3032 / I-864 Bill

June 1, 2009: Paid I-864 Bill

June 5, 2009: sent AOS stuff

June 29, 2009: sent DS 230

June 28 - Aug. 8: i spent time with my boys in the philippines

IN A BIG HUGE BLUR...OUR CASE WAS COMPLETED AUGUST 5, 2009 (AFTER RFE: HUSBAND'S ORIGINAL BIRTH CERTIFICATE) AND MY HUSBANDS INTERVIEW WILL BE SEPTEMBER 25, 2009...WE HOPE AND PRAY WE GET IT!

CURRENTLY DOING: PREPARING DOCUMENTS FOR MY SON'S PETITION!

...I am one day further from the last time I saw you but I am one day closer to the next time I will...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

We are in the same situation, no explanation of why we are under review. I was also told to call back if we have not been contacted in 6 weeks. We did not pay air21 but the did text the tracking # and was told we could pay COD.

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
We are in the same situation, no explanation of why we are under review. I was also told to call back if we have not been contacted in 6 weeks. We did not pay air21 but the did text the tracking # and was told we could pay COD.

Hi joe_guillen,

well,lucky you!at least they give you tracking number..air21 didn't even text the tracking number so im clueless and i have no idea about it..all i know i told my about what happen to my interview..only medical result and immunization..that's the only lack but i turn to white slip..so when my fiance called the operator says could take about 6 weeks..and advice to call once a week..so were doing it the best as we can...we so much miss each other..but still there is word [b]"trials"[/b]so we still are hoping..that everything will be okay!but im so depressed.. :crying::crying::crying: i do all have the documents needed..but..aww too sad.. :crying::crying:

GOD BLESS US ALL!still have faith!

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

I have read many post on here and others, and it seems to be a trend, that if they keep your passport the outcome seems to be good, so just keep hoping and calling, as soon as you hear something post it and I will do the same.......Yes TRIALS is what we also say

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
I have read many post on here and others, and it seems to be a trend, that if they keep your passport the outcome seems to be good, so just keep hoping and calling, as soon as you hear something post it and I will do the same.......Yes TRIALS is what we also say

ohhh really?well i dont want to be happy unless i got my visa in hand! :star::crying: ..we keep calling once a week for updates..yeah i will post here if there is any good news..hehehe..TRIALS are always in our side..

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

hey everyone my husband told me that air21 text him a tracking number yesterday. i just called the embassy and said they did not issue the visa yet but our case is in the final review since air21 text my husband with a tracking number which means the embassy has already touched base with air21 that anytime soon they will be sending out the passport with the visa. i hope she meant what she said when she said within the next couple of days, that's a guarantee.

June 2004...i sat down on the bench to tie my shoelaces (literally) not knowing i would marry the man i just sat down next to...

Oct. 18, 2007...Married

Oct. 27, 2007...my beautiful son is born

USCIS IR-1/CR-1 Visa Journey

Service Center : Vermont Service Center

Consulate: Manila, Philippines

Feb. 05, 2009: I 130 sent

Feb. 12, 2009: NAO1

Feb. 17, 2009: first touch

Feb. 18, 2009: Touch

May 01, 2009: Touch and NAO2 mailed...yeah hey!

May 08, 2009: NAO2 in the mail

NVC Journey

May 15, 2009: NVC case number

May 18, 2009: Gave email add to NVC

May 28, 2009: Received DS 3032 / I-864 Bill

June 1, 2009: Paid I-864 Bill

June 5, 2009: sent AOS stuff

June 29, 2009: sent DS 230

June 28 - Aug. 8: i spent time with my boys in the philippines

IN A BIG HUGE BLUR...OUR CASE WAS COMPLETED AUGUST 5, 2009 (AFTER RFE: HUSBAND'S ORIGINAL BIRTH CERTIFICATE) AND MY HUSBANDS INTERVIEW WILL BE SEPTEMBER 25, 2009...WE HOPE AND PRAY WE GET IT!

CURRENTLY DOING: PREPARING DOCUMENTS FOR MY SON'S PETITION!

...I am one day further from the last time I saw you but I am one day closer to the next time I will...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
hey everyone my husband told me that air21 text him a tracking number yesterday. i just called the embassy and said they did not issue the visa yet but our case is in the final review since air21 text my husband with a tracking number which means the embassy has already touched base with air21 that anytime soon they will be sending out the passport with the visa. i hope she meant what she said when she said within the next couple of days, that's a guarantee.

HI taj'

So when your husband before went to the embassy and hand over the air21 form they didnt give the tracking number right away?how many weeks did you wait until air21 txt your husband the tracking number?wow!hope he will have it soon!Goodluck taj's!

GOD BLESS!

MARK N RODA

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

Reading this thread gave me so many ideas and things that might occur, even though you think or feel everything was ok, then suddenly something is gonna come up and surprise you in many ways.

This is very helpful.. :thumbs:

Dec 15,2009 - Assigned interview date on January 24,2010!!

Jan. 24, 2010 - Interview!! Approved

Jan. 28, 2010 - VISA received

Mar. 03,2010 - POE, New York (JFK)

Apr. 12,2010- CA ID

May 20,2010- CA Driving License

May, 25,2010-Wife told me that she is pregnant ^_^

Jan.25,2011- Our daughter was born

Lee and Jen + Karenza

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
Reading this thread gave me so many ideas and things that might occur, even though you think or feel everything was ok, then suddenly something is gonna come up and surprise you in many ways.

This is very helpful.. :thumbs:

Hi Lancelotte25,

yes!i agree this is really helpful to all!anyways,i didn't expect this would happen to me..i've always check my documents..just make sure to all of here who did not do their medical yet,,to go 1 week before interview...! :crying::crying: im still sad about mine..but im hoping it will be okay..i dont care i will wa 6 weeks..but i hope its worth waiting for... :(:( i miss my fiance so much,,..

ALASKA,USA------------------------MINDANAO,PHILIPPINES

I GOT THE VISA!!!!THANK YOU LORD! (OCTOBER 21,2009)

HAPPILY MARRIED TO MY WONDERFUL HUSBAND

November 19,2009------Got married

January 19,2010--------Application received date by USCIS

January 28,2010--------Notice date for Biometrics

February 12,2010--------Biometrics appointment @ 9am (done)

February 15,2010--------Last Updated (I-485 & I-765)

February 18,2010--------dated by USCIS(scheduling for my interview)

January 25,2010--------NOA1 date(I-485,I-765,I-131)

January 29,2010--------touch for my AP

February 15,2010--------touch for my EAD

March 11,2010-----------for my AOS..and always checking our mailbox..hehehe

March 10,2010------------Interview for my AOS @ 9am (done) and waiting for the result.. whew...

March 22,2010------------Received my Greencard!so happy!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...