Hmm. thanks raymon. So i guess we'll have to send through regular mail all the papers in I864. Thanks for the advise, one more thing if you know. My spouse will be using a sponsor, so does that sponsor fill out an I-864A and we fill out a regular I-864.?

@Mitch.. good to hear your phone's finally working ... hee hee hee... i guess this time you probably had a lot of pushy-good vibes to call. :whistle:

Twulf, right...the joint sponsor will fill up the I-864A. Emailing mine today and hopefully the DS-230

next week. :thumbs:

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

hi Sam, now were talking days.... your wife and lil one will be here in 3days??? how wonderful huh? post some pictures for us to see the those happy faces. okay? so their POE is in San francisco?

i know huh? now, NVC should be prepared to answer to all the questions that i have in my mind, and all the questions that i will have.. ehehhehehe... im just so glad i got some issues straightened up.

------USCIS-- married since March 28, 2005 - I130 filed: july 27, 2007

NOA #1: Aug 6, 2007 NOA #2: Oct. 29, 2009 - APPROVED

--NVC--December 12, 2009 - Case# generated from NVC

December 17, 2009 - hubby received his letter from NVC[/font]

April 13, 2010 - received DS-3032 via email

April 19, 2010 - sent back DS-3032 to NVC thru DHL (did not email a copy)

April 23, 2010 - DS3032 was received per operator and reviewed, received IV and AOS bill thru mail.

April 29, 2010 - paid AOS ($70) fee bill

April 30, 2010 - paid IV fee bill ($400.00 each beneficiary)

May 01, 2010 - AOS shows "PAID" in the system, printed cover sheet.

May 05, 2010 - iv bill shows "PAID"

June 24, 2010 - sent AOS via USPS/certified and prioritized

July 14, 2010 - received RFE. nvc is requesting again for Tax Transcript 2009

Sept 14, 2010 - Mailed RFE documents via usps

Sept 22, 2010 - mailed complete DS-230 via DHL

Oct 14, 2010 - received RFE about beneficiary's police clearances

Nov. 30, 2010 - sent corrected DS-230 with correct years of residency via USPS

Dec. 21, 2010 - CASE COMPLETED!!!

April 28, 2011 - interview date was set to JUNE 28, 2011 @6:30AM

June 15, 2011 - MEDICAL EXAM and will be back fri (6/17/11) for results

June 28, 2011 - Interview

July 12, 2011 - arrived at LAX - and we'll live happily ever after!

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

Mitch, i was right after all..you will start receiving those stuff either this month end or next. Better advise hubby to start getting those requirements.! :thumbs:

aside from the authenticated by NSO birthcerts and marraige contracts... what documents does my husband need to have?

Edited by -mitch-

------USCIS-- married since March 28, 2005 - I130 filed: july 27, 2007

NOA #1: Aug 6, 2007 NOA #2: Oct. 29, 2009 - APPROVED

--NVC--December 12, 2009 - Case# generated from NVC

December 17, 2009 - hubby received his letter from NVC[/font]

April 13, 2010 - received DS-3032 via email

April 19, 2010 - sent back DS-3032 to NVC thru DHL (did not email a copy)

April 23, 2010 - DS3032 was received per operator and reviewed, received IV and AOS bill thru mail.

April 29, 2010 - paid AOS ($70) fee bill

April 30, 2010 - paid IV fee bill ($400.00 each beneficiary)

May 01, 2010 - AOS shows "PAID" in the system, printed cover sheet.

May 05, 2010 - iv bill shows "PAID"

June 24, 2010 - sent AOS via USPS/certified and prioritized

July 14, 2010 - received RFE. nvc is requesting again for Tax Transcript 2009

Sept 14, 2010 - Mailed RFE documents via usps

Sept 22, 2010 - mailed complete DS-230 via DHL

Oct 14, 2010 - received RFE about beneficiary's police clearances

Nov. 30, 2010 - sent corrected DS-230 with correct years of residency via USPS

Dec. 21, 2010 - CASE COMPLETED!!!

April 28, 2011 - interview date was set to JUNE 28, 2011 @6:30AM

June 15, 2011 - MEDICAL EXAM and will be back fri (6/17/11) for results

June 28, 2011 - Interview

July 12, 2011 - arrived at LAX - and we'll live happily ever after!

Link to comment
Share on other sites

aside from the authenticated by NSO birthcerts and marraige contracts... what documents does my husband need to have?

Photos,Passport, Police Certificate/or NBI in our case.

Link to comment
Share on other sites

Filed: AOS (apr) Country: Albania
Timeline

Photos,Passport, Police Certificate/or NBI in our case.

WOW LOOK AT THIS:

F2A is now 01DEC06 For all countries, except Mexico 01Jun05 :dance::dance::dance::dance::star::star::star:

http://travel.state.gov/visa/frvi/bulletin/bulletin_4805.html

I-130 Sent : 08/15/2006 F2A (spouse of LPR)

I-130 Approved : 03/29/2010

AOS data section: Filed I-485 & I-765 (more details see About Me section)

04/30/2010 - Mailed out

06/02/2010 - RFE

08/11/2010 - Interview Date - APPROVED

08/23/2010 - Green Card at Home :)

Hubby's USC

Service Center : Dallas TX ; CIS Office : New York City NY

05/29/2010 - Date Filed

06/08/2010 - Email & phone mess with case number.

06/07/2010 - Checks cashed

06/11/2010 - NOA Date

06/21/2010 - Biometrics letter

07/07/2010 - Biometrics appointment

11/11/2010 - Interview Date

Waiting for interview letter

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

WOW LOOK AT THIS:

F2A is now 01DEC06 For all countries, except Mexico 01Jun05 :dance::dance::dance::dance::star::star::star:

http://travel.state.gov/visa/frvi/bulletin/bulletin_4805.html

ohh.. i think my heart is running 95mph already... i cant believe that!!! let say worse comes to worst.. if they will be moving 1 month of processing time every month then, i have 7months to go???? but i do know that wont happen. its normally 2months move every months.... great news for a great weekend you guys.

Photos,Passport, Police Certificate/or NBI in our case.

ok... ill tell him to do that...

------USCIS-- married since March 28, 2005 - I130 filed: july 27, 2007

NOA #1: Aug 6, 2007 NOA #2: Oct. 29, 2009 - APPROVED

--NVC--December 12, 2009 - Case# generated from NVC

December 17, 2009 - hubby received his letter from NVC[/font]

April 13, 2010 - received DS-3032 via email

April 19, 2010 - sent back DS-3032 to NVC thru DHL (did not email a copy)

April 23, 2010 - DS3032 was received per operator and reviewed, received IV and AOS bill thru mail.

April 29, 2010 - paid AOS ($70) fee bill

April 30, 2010 - paid IV fee bill ($400.00 each beneficiary)

May 01, 2010 - AOS shows "PAID" in the system, printed cover sheet.

May 05, 2010 - iv bill shows "PAID"

June 24, 2010 - sent AOS via USPS/certified and prioritized

July 14, 2010 - received RFE. nvc is requesting again for Tax Transcript 2009

Sept 14, 2010 - Mailed RFE documents via usps

Sept 22, 2010 - mailed complete DS-230 via DHL

Oct 14, 2010 - received RFE about beneficiary's police clearances

Nov. 30, 2010 - sent corrected DS-230 with correct years of residency via USPS

Dec. 21, 2010 - CASE COMPLETED!!!

April 28, 2011 - interview date was set to JUNE 28, 2011 @6:30AM

June 15, 2011 - MEDICAL EXAM and will be back fri (6/17/11) for results

June 28, 2011 - Interview

July 12, 2011 - arrived at LAX - and we'll live happily ever after!

Link to comment
Share on other sites

Filed: Other Country: Nigeria
Timeline

WOW LOOK AT THIS:

F2A is now 01DEC06 For all countries, except Mexico 01Jun05 :dance::dance::dance::dance::star::star::star:

http://travel.state.gov/visa/frvi/bulletin/bulletin_4805.html

This is incredible!!! I have never seen this before - 6 months progression in the F2A category within one month. WOW! Congratulations to everyone all in this forum - your visa journey will end sooner than you expect. I encourage you guys to buckle up and start gathering documents, especially those with PD for next year.

F2A for Wife and Son

Priority Date: Mar 23, 2006

2006-03-21: I-130 Sent

2006-03-23: I-130 NOA1

2009-05-28: I-130 Approved

2009-06-02: NVC Case No. generated

2009-11-21: Sent NVC Choice of Agent request by email

2009-12-08: DS-3032 / I-864 Bill generated

2009-12-08: Paid I-864 Bill

2009-12-09: Choice of Agent request accepted by NVC

2009-12-09: I-864 Bill shows PAID

2009-12-09: IV Bill

2009-12-09: Paid IV Bill

2009-12-10: Sent completed I-864 package to NVC

2009-12-11: IV Bill shows PAID

2009-12-24: Mailed DS-230 forms to NVC

2009-12-27: DS-230 forms delivered according to UPS

2009-12-30: DS-230 forms received by NVC according to AVR

2010-01-12: CASE COMPLETE according to NVC Operator

2010-01-22: Interview Appointment received for March 31, 2010!

2010-03-31: Visa Approved!

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

This is incredible!!! I have never seen this before - 6 months progression in the F2A category within one month. WOW! Congratulations to everyone all in this forum - your visa journey will end sooner than you expect. I encourage you guys to buckle up and start gathering documents, especially those with PD for next year.

This is amazing and kind of explains why things have been moving so fast. :dance::star::thumbs:

130 Track:

Apr. 4. 2007: I-130 Sent/Submitted

Apr. 13. 2007: I-130 NOA1

Aug. 11. 2009: I-130 Approved

NVC Track:

Sep 16 2009: NVC Case # assigned

Mar 28 2010: DS3032 received via mail.

Mar 30 2010: DS3032 Entered into NVC sys

Apr 4 2010: AOS fee bill generated

Apr 5 2010: AOS paid online

Apr 6 2010: IV fee bill generated

Apr 13 2010: IV fee bill paid.

May 24 2010: I-864 sent

June 6 2010: DS-230 sent.

July 20 2010: Case complete at NVC

Sep 1 2010: Interview Appt Letter Received

Sep 13 2010: Medical done.

Oct 4 2010: Visa approved

Nov 2010: POE.

Nov 29: Got SSN

Dec 2010: Got Green card

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

Twulf, right...the joint sponsor will fill up the I-864A. Emailing mine today and hopefully the DS-230

next week. :thumbs:

Ok thanks Raymon. Now that you've completed your I864, may be I can bug you with any questions I have :) . So you are emailing all the supporting docs + I864(fill, print, sign, scan) and will you also send hard copies through regular mail or just email? Have you confirmed from NVC if just email is okay or do you know of anyone who has done this without sending hard copies.

Leb Girl--- thanks for the input on supporting docs.

130 Track:

Apr. 4. 2007: I-130 Sent/Submitted

Apr. 13. 2007: I-130 NOA1

Aug. 11. 2009: I-130 Approved

NVC Track:

Sep 16 2009: NVC Case # assigned

Mar 28 2010: DS3032 received via mail.

Mar 30 2010: DS3032 Entered into NVC sys

Apr 4 2010: AOS fee bill generated

Apr 5 2010: AOS paid online

Apr 6 2010: IV fee bill generated

Apr 13 2010: IV fee bill paid.

May 24 2010: I-864 sent

June 6 2010: DS-230 sent.

July 20 2010: Case complete at NVC

Sep 1 2010: Interview Appt Letter Received

Sep 13 2010: Medical done.

Oct 4 2010: Visa approved

Nov 2010: POE.

Nov 29: Got SSN

Dec 2010: Got Green card

Link to comment
Share on other sites

Filed: Other Country: Philippines
Timeline

This is incredible!!! I have never seen this before - 6 months progression in the F2A category within one month. WOW! Congratulations to everyone all in this forum - your visa journey will end sooner than you expect. I encourage you guys to buckle up and start gathering documents, especially those with PD for next year.

im so happy seeing this super big improvement. I finally was able to call nvc and ask them about my daughter's case.The operator told me that i should just send her birth certificate and that's all. And i also gave them our email address. im happy with this development! Thank u God!

F-2 Visa

PRIORITY DATE : 2007- 06- 13

Event Date

I-130 Sent : 2007-06-13

I-130 NOA1 : 2007-06-22

I-130 Approved :2009-07-24

NVC Received :

Received DS-3032: 2010-04-14

Return Completed DS-3032: 2010-04-16

Received IV FEE BILL: 2010-04-23

PAID IV FEE BILL : 2010- 04-26

IV FEE SHOWS PAID : 2010-04-28

PAID AOS FEE: 2010- 04- 29

AOS FEE SHOWS PAID : 2010-05-01

SENT BC OF DAUGHTER TO BE ADDED AS A D.B.: 2010-05-05

ADDED MY DAUGHTER TO THE PETITION: 2010-05-19

sent completed ds230 and aos and checklist: 2010- 05- 24

received checklist as per operator to be reviewed within the next 6-8 weeks: 2010-06-04

CASE COMPLETE: 2010- 06- 14

Link to comment
Share on other sites

Filed: Other Country: Philippines
Timeline

hello! can anyone teach me how to include my timeline to my posts? i need help...thanks!

hello! can anyone teach me how to include my timeline to my posts? i need help...thanks!

F-2 Visa

PRIORITY DATE : 2007- 06- 13

Event Date

I-130 Sent : 2007-06-13

I-130 NOA1 : 2007-06-22

I-130 Approved :2009-07-24

NVC Received :

Received DS-3032: 2010-04-14

Return Completed DS-3032: 2010-04-16

Received IV FEE BILL: 2010-04-23

PAID IV FEE BILL : 2010- 04-26

IV FEE SHOWS PAID : 2010-04-28

PAID AOS FEE: 2010- 04- 29

AOS FEE SHOWS PAID : 2010-05-01

SENT BC OF DAUGHTER TO BE ADDED AS A D.B.: 2010-05-05

ADDED MY DAUGHTER TO THE PETITION: 2010-05-19

sent completed ds230 and aos and checklist: 2010- 05- 24

received checklist as per operator to be reviewed within the next 6-8 weeks: 2010-06-04

CASE COMPLETE: 2010- 06- 14

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

WOW LOOK AT THIS:

F2A is now 01DEC06 For all countries, except Mexico 01Jun05 :dance::dance::dance::dance::star::star::star:

http://travel.state.gov/visa/frvi/bulletin/bulletin_4805.html

got excited upon seeing this info.

only 3 years of wait for me.

i really missed my wife and my daughter.

according to the Visa Bulletin, visa demand for the past 15 months is very low.

This is the reason why it was advancing at a rapid pace.

Hope that this pace will continue.

My Journey

Oct 21,1997: Priority Date F2B

May 25,2009: POE LAX

Aug 29,2009: Wedding in PI

F2A for Wife and Daughter

I-130 Track

Feb 04,2010: I-130 Sent

Feb 07,2010: I-130 Received by USCIS

Feb 12,2010: NOA1

Aug 13,2010: Case Touched

Aug 14,2010: Case Touched

Aug 19,2010: Case Touched

Aug 30,2010: Case Approved

Sept 2,2010: NOA2 Received

Sept 15,2010:NVC assigned Case No.

Sept 22,2010:Received AOS Fee Bill and DS-3032. Paid AOS fee online.

Oct 05, 2010:Paid IV Fee Bill online.

Oct 25, 2010:Send package IV to NVC

Oct 27, 2010:NVC Received Package IV

Oct 28, 2010:Send AOS to NVC

Nov 01, 2010:NVC received AOS

Nov 22, 2010:Case Complete

Interview Date : July 17,2012. Passed Interview.

Link to comment
Share on other sites

Filed: F-2A Visa Country: Philippines
Timeline

hi everyone, im new here and id like to ask a question. my husband filed an i-130 and he got the Notice of Action last march 17, 2010. when can we possibly receive the result? thanks

Mar 08, 2010 - I-130 Submitted

Mar 17, 2010 - I-130 NOA1

Sep 02, 2010 - I-130 NOA2

Sep 16, 2010 - NVC Case # assigned

Sep 23, 2010 - received DS3230 and AOS bill thru mail

Sep 23, 2010 - paid AOS bill

Sep 28, 2010 - paid IV bill

Sep 30, 2010 - AOS packet delivered to NVC

Oct 04, 2010 - DS230 and civil docs delivered to NVC

Oct 06, 2010 - documents were received by NVC as per AVR

Oct 26, 2010 - -case complete-

Link to comment
Share on other sites

Filed: Other Country: Philippines
Timeline

i can't believe it! it's so amazing that visa bulletin has moved seven months! woot woot! :dance::wow:

I-130 Track:

Apr. 19. 2006: I-130 Sent/Submitted

May.06. 2006: I-130 NOA1

Oct. 26. 2009: I-130 NOA2

NVC Track:

Oct. 20. 2009: ACL email received with case number & AOS Fee Bill from email

Oct. 25. 2009: AOS paid online

Oct. 27. 2009: AOS Cover Sheet & ACL sent via FedEx

Oct. 29. 2009: NVC received the ACL

Nov. 11/16. 2009: IV Fee Bill / paid online

Nov. 17. 2009: IV Cover Sheet & Requested to add a child in NVC case

Dec. 07. 2009: Approval of additional child in NVC case received via email & paid IV bill

Dec. 11. 2009: Sent DS-230 via LBC

Dec. 17. 2009: I-864 sent via USPS overnight & DS-230 received (as per avr)

Dec. 21. 2009: I-864 received as per avr/has reviewed DS-230

Jan. 07. 2010: Received email-checklist dated Jan.06.2010. printed & mailed it via usps.

Jan. 26. 2010: CASE COMPLETED on January 23, 2010 as per avr.

Mar. 15. 2010: Schedule was given last Feb.12/ Interview on April 22! at USEM as per operator & email

USEM Track:

Mar. 19. 2010: Left NVC and forwarded to USEM

Apr. 19-21 2010: Passed medical (me and my son) / May 4-6 passed medical (daughter)

Apr. 22. 2010: Interview APPROVED for me and my son / May 12 interivew APPROVED (daughter)

May 26. 2010: POE SEATTLE

Link to comment
Share on other sites

Filed: AOS (apr) Country: Albania
Timeline

got excited upon seeing this info.

only 3 years of wait for me.

i really missed my wife and my daughter.

according to the Visa Bulletin, visa demand for the past 15 months is very low.

This is the reason why it was advancing at a rapid pace.

Hope that this pace will continue.

Tell me about it, I can't believe it either (but last year about this time they moved 4 months within this period) so it does really sound about right. Everyone GET YOUR PAPERWORK READY - MEDICAL EXAM IS GOOD FOR ONE YEAR.

The demand is really low is we predicted here months ago, because many LPR's are getting their USC really fast after completing 5 years of residency and their spouses are gettin to move from F2A to IR of USC category. :thumbs:

I am already in the USA with a student visa, I-130 approved a few weeks ago and next month I will apply for adjustment of status with USCIS on May 01,2010 so happy :D I still can't believe it!!! I din't expect to move so many months and I was taking it slowly :rofl: now . I have scheduled medical exam for next week.

Edited by SweetApple08

I-130 Sent : 08/15/2006 F2A (spouse of LPR)

I-130 Approved : 03/29/2010

AOS data section: Filed I-485 & I-765 (more details see About Me section)

04/30/2010 - Mailed out

06/02/2010 - RFE

08/11/2010 - Interview Date - APPROVED

08/23/2010 - Green Card at Home :)

Hubby's USC

Service Center : Dallas TX ; CIS Office : New York City NY

05/29/2010 - Date Filed

06/08/2010 - Email & phone mess with case number.

06/07/2010 - Checks cashed

06/11/2010 - NOA Date

06/21/2010 - Biometrics letter

07/07/2010 - Biometrics appointment

11/11/2010 - Interview Date

Waiting for interview letter

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...