Damn so it's another 7months for this whole process to finish plus waiting for an appointment so basically from this day until 8-9 months I have to wait.. Is that about correct..? Ugh this is crazy, I'm here thinking that you have to wait 2 to 3 months and boom my husband will be here..

i believe what they were saying is they waited 7MONTHS from approval till the choice of agent documents will come. since you were just approved then have to wait 7months or sooo (that would be september) till you'll hear another thing from them... im just stating here the worst scenario. but based on our friends' case complete timelines, the whole processing which includes mailing of documents to NVC... the checking... and all... normally will take 3-4 months.... and then another LOONNNGGG WAIT for your priority date to be currect for visa availability.

so, its NOT gonna be like BOOM!!! your hubby will be here in a blink of an eye... to our friends that are already reunited with their beloved can say "BEEN THERE, DONE THAT" so lets all hang in there...just like our friend Michelle_jim, they waited too but now, lo and behold!!!! she's already here in the US enjoying the cold weather hahahah ....and will live happily ever after... we all will have our own turn.....

PATIENCE IS VIRTUE!

------USCIS-- married since March 28, 2005 - I130 filed: july 27, 2007

NOA #1: Aug 6, 2007 NOA #2: Oct. 29, 2009 - APPROVED

--NVC--December 12, 2009 - Case# generated from NVC

December 17, 2009 - hubby received his letter from NVC[/font]

April 13, 2010 - received DS-3032 via email

April 19, 2010 - sent back DS-3032 to NVC thru DHL (did not email a copy)

April 23, 2010 - DS3032 was received per operator and reviewed, received IV and AOS bill thru mail.

April 29, 2010 - paid AOS ($70) fee bill

April 30, 2010 - paid IV fee bill ($400.00 each beneficiary)

May 01, 2010 - AOS shows "PAID" in the system, printed cover sheet.

May 05, 2010 - iv bill shows "PAID"

June 24, 2010 - sent AOS via USPS/certified and prioritized

July 14, 2010 - received RFE. nvc is requesting again for Tax Transcript 2009

Sept 14, 2010 - Mailed RFE documents via usps

Sept 22, 2010 - mailed complete DS-230 via DHL

Oct 14, 2010 - received RFE about beneficiary's police clearances

Nov. 30, 2010 - sent corrected DS-230 with correct years of residency via USPS

Dec. 21, 2010 - CASE COMPLETED!!!

April 28, 2011 - interview date was set to JUNE 28, 2011 @6:30AM

June 15, 2011 - MEDICAL EXAM and will be back fri (6/17/11) for results

June 28, 2011 - Interview

July 12, 2011 - arrived at LAX - and we'll live happily ever after!

Filed: Other Country: Nigeria
Timeline
Posted
hi everyone im happy coz my case was completed last march 3, 2010... :dance: :dance: :dance: :dance:

just waiting for my appointment letter...im planning to resign nxt month...can i ask what is the best reason for leaving....thanks!

lebanese girl, i waited for 7months til my DS3032/choice of agent....i was approved june 09, see my timeline...

Jeanette07, congratulations on completing your case!

F2A for Wife and Son

Priority Date: Mar 23, 2006

2006-03-21: I-130 Sent

2006-03-23: I-130 NOA1

2009-05-28: I-130 Approved

2009-06-02: NVC Case No. generated

2009-11-21: Sent NVC Choice of Agent request by email

2009-12-08: DS-3032 / I-864 Bill generated

2009-12-08: Paid I-864 Bill

2009-12-09: Choice of Agent request accepted by NVC

2009-12-09: I-864 Bill shows PAID

2009-12-09: IV Bill

2009-12-09: Paid IV Bill

2009-12-10: Sent completed I-864 package to NVC

2009-12-11: IV Bill shows PAID

2009-12-24: Mailed DS-230 forms to NVC

2009-12-27: DS-230 forms delivered according to UPS

2009-12-30: DS-230 forms received by NVC according to AVR

2010-01-12: CASE COMPLETE according to NVC Operator

2010-01-22: Interview Appointment received for March 31, 2010!

2010-03-31: Visa Approved!

Filed: Other Country: Nigeria
Timeline
Posted
i believe what they were saying is they waited 7MONTHS from approval till the choice of agent documents will come. since you were just approved then have to wait 7months or sooo (that would be september) till you'll hear another thing from them... im just stating here the worst scenario. but based on our friends' case complete timelines, the whole processing which includes mailing of documents to NVC... the checking... and all... normally will take 3-4 months.... and then another LOONNNGGG WAIT for your priority date to be currect for visa availability.

so, its NOT gonna be like BOOM!!! your hubby will be here in a blink of an eye... to our friends that are already reunited with their beloved can say "BEEN THERE, DONE THAT" so lets all hang in there...just like our friend Michelle_jim, they waited too but now, lo and behold!!!! she's already here in the US enjoying the cold weather hahahah ....and will live happily ever after... we all will have our own turn.....

PATIENCE IS VIRTUE!

Well said, mitch.

F2A for Wife and Son

Priority Date: Mar 23, 2006

2006-03-21: I-130 Sent

2006-03-23: I-130 NOA1

2009-05-28: I-130 Approved

2009-06-02: NVC Case No. generated

2009-11-21: Sent NVC Choice of Agent request by email

2009-12-08: DS-3032 / I-864 Bill generated

2009-12-08: Paid I-864 Bill

2009-12-09: Choice of Agent request accepted by NVC

2009-12-09: I-864 Bill shows PAID

2009-12-09: IV Bill

2009-12-09: Paid IV Bill

2009-12-10: Sent completed I-864 package to NVC

2009-12-11: IV Bill shows PAID

2009-12-24: Mailed DS-230 forms to NVC

2009-12-27: DS-230 forms delivered according to UPS

2009-12-30: DS-230 forms received by NVC according to AVR

2010-01-12: CASE COMPLETE according to NVC Operator

2010-01-22: Interview Appointment received for March 31, 2010!

2010-03-31: Visa Approved!

Filed: Other Country: Philippines
Timeline
Posted

good news everyone! visa bulletin for april is coming! watch out for it! :wow:

I-130 Track:

Apr. 19. 2006: I-130 Sent/Submitted

May.06. 2006: I-130 NOA1

Oct. 26. 2009: I-130 NOA2

NVC Track:

Oct. 20. 2009: ACL email received with case number & AOS Fee Bill from email

Oct. 25. 2009: AOS paid online

Oct. 27. 2009: AOS Cover Sheet & ACL sent via FedEx

Oct. 29. 2009: NVC received the ACL

Nov. 11/16. 2009: IV Fee Bill / paid online

Nov. 17. 2009: IV Cover Sheet & Requested to add a child in NVC case

Dec. 07. 2009: Approval of additional child in NVC case received via email & paid IV bill

Dec. 11. 2009: Sent DS-230 via LBC

Dec. 17. 2009: I-864 sent via USPS overnight & DS-230 received (as per avr)

Dec. 21. 2009: I-864 received as per avr/has reviewed DS-230

Jan. 07. 2010: Received email-checklist dated Jan.06.2010. printed & mailed it via usps.

Jan. 26. 2010: CASE COMPLETED on January 23, 2010 as per avr.

Mar. 15. 2010: Schedule was given last Feb.12/ Interview on April 22! at USEM as per operator & email

USEM Track:

Mar. 19. 2010: Left NVC and forwarded to USEM

Apr. 19-21 2010: Passed medical (me and my son) / May 4-6 passed medical (daughter)

Apr. 22. 2010: Interview APPROVED for me and my son / May 12 interivew APPROVED (daughter)

May 26. 2010: POE SEATTLE

Filed: Country: Philippines
Timeline
Posted
Jeanette07, congratulations on completing your case!

Samkunle, Thank u so much!!! hope to receive my appointment letter on may 2010...and expecting my interview on june or july2010... :star:

my PD is DEC. 22, 2006

Dec. 26, 2006- 1130 sent

June 10, 2009- Case Approved w/ case # MNLXXXX

Jan. 24, 2010- AOS fee bill generated/DS3032

Jan. 25, 2010- AOS bill paid online & DS3032 sent thru email & mail

Jan. 28, 2010- AOS shows PAID

Feb. 06, 2010- NVC received DS3032

Feb. 06, 2010- Download I-864 Affidavit of Support Package

Feb. 07, 2010- IV bill Paid Online

Feb. 09, 2010- Send I-864 to NVC thru mail (USPS)

Feb. 12, 2010- Download DS230

Feb. 16, 2010- Send DS230 via LBC

March 3, 2010- CASE COMPLETE

Filed: Other Country: Lebanon
Timeline
Posted

wow.. This is so confusing and heart breaking.. :) as long as I don't have to wait another year, I can't wait another year.. If I wait another yr it would be 11 yrs, I can't do that..

March 25 07 i130 sent

March 27 07 i130 case #

November 19 09 i130 transfered to Taxes

March 2 10 i130 approved

Filed: Other Country: Lebanon
Timeline
Posted
i believe what they were saying is they waited 7MONTHS from approval till the choice of agent documents will come. since you were just approved then have to wait 7months or sooo (that would be september) till you'll hear another thing from them... im just stating here the worst scenario. but based on our friends' case complete timelines, the whole processing which includes mailing of documents to NVC... the checking... and all... normally will take 3-4 months.... and then another LOONNNGGG WAIT for your priority date to be currect for visa availability.

so, its NOT gonna be like BOOM!!! your hubby will be here in a blink of an eye... to our friends that are already reunited with their beloved can say "BEEN THERE, DONE THAT" so lets all hang in there...just like our friend Michelle_jim, they waited too but now, lo and behold!!!! she's already here in the US enjoying the cold weather hahahah ....and will live happily ever after... we all will have our own turn.....

PATIENCE IS VIRTUE!

I see LOL Thanx for the break down.. ur so sweet :)

Filed: Country: Philippines
Timeline
Posted
wow.. This is so confusing and heart breaking.. :) as long as I don't have to wait another year, I can't wait another year.. If I wait another yr it would be 11 yrs, I can't do that..

March 25 07 i130 sent

March 27 07 i130 case #

November 19 09 i130 transfered to Taxes

March 2 10 i130 approved

just like what everyone is trying to guess... it will take a year from approval till interview date... and if your case was filed 2007 and your beneficiary's interview will be early next year (assuming!!!) then that will be 4 YEARS TOTAL.

------USCIS-- married since March 28, 2005 - I130 filed: july 27, 2007

NOA #1: Aug 6, 2007 NOA #2: Oct. 29, 2009 - APPROVED

--NVC--December 12, 2009 - Case# generated from NVC

December 17, 2009 - hubby received his letter from NVC[/font]

April 13, 2010 - received DS-3032 via email

April 19, 2010 - sent back DS-3032 to NVC thru DHL (did not email a copy)

April 23, 2010 - DS3032 was received per operator and reviewed, received IV and AOS bill thru mail.

April 29, 2010 - paid AOS ($70) fee bill

April 30, 2010 - paid IV fee bill ($400.00 each beneficiary)

May 01, 2010 - AOS shows "PAID" in the system, printed cover sheet.

May 05, 2010 - iv bill shows "PAID"

June 24, 2010 - sent AOS via USPS/certified and prioritized

July 14, 2010 - received RFE. nvc is requesting again for Tax Transcript 2009

Sept 14, 2010 - Mailed RFE documents via usps

Sept 22, 2010 - mailed complete DS-230 via DHL

Oct 14, 2010 - received RFE about beneficiary's police clearances

Nov. 30, 2010 - sent corrected DS-230 with correct years of residency via USPS

Dec. 21, 2010 - CASE COMPLETED!!!

April 28, 2011 - interview date was set to JUNE 28, 2011 @6:30AM

June 15, 2011 - MEDICAL EXAM and will be back fri (6/17/11) for results

June 28, 2011 - Interview

July 12, 2011 - arrived at LAX - and we'll live happily ever after!

Filed: Country: Philippines
Timeline
Posted (edited)
Samkunle, Thank u so much!!! hope to receive my appointment letter on may 2010...and expecting my interview on june or july2010... :star:

wow... JEANETTE07!!! you're really uplifting my spirit!!! your priority date is DEC 06... and mine is JULY 07 which is 6 months farther than yours... and if you're thinking that your beneficiary's interview will be around June or July then let's say 6 months from that will be mine.... YEHEY!!! getting closer..... Getting closer!!! as per DOREY from finding nemo.... we shoud "KEEP SWIMMING..... KEEP SWIMMING!!!!"

Edited by -mitch-

------USCIS-- married since March 28, 2005 - I130 filed: july 27, 2007

NOA #1: Aug 6, 2007 NOA #2: Oct. 29, 2009 - APPROVED

--NVC--December 12, 2009 - Case# generated from NVC

December 17, 2009 - hubby received his letter from NVC[/font]

April 13, 2010 - received DS-3032 via email

April 19, 2010 - sent back DS-3032 to NVC thru DHL (did not email a copy)

April 23, 2010 - DS3032 was received per operator and reviewed, received IV and AOS bill thru mail.

April 29, 2010 - paid AOS ($70) fee bill

April 30, 2010 - paid IV fee bill ($400.00 each beneficiary)

May 01, 2010 - AOS shows "PAID" in the system, printed cover sheet.

May 05, 2010 - iv bill shows "PAID"

June 24, 2010 - sent AOS via USPS/certified and prioritized

July 14, 2010 - received RFE. nvc is requesting again for Tax Transcript 2009

Sept 14, 2010 - Mailed RFE documents via usps

Sept 22, 2010 - mailed complete DS-230 via DHL

Oct 14, 2010 - received RFE about beneficiary's police clearances

Nov. 30, 2010 - sent corrected DS-230 with correct years of residency via USPS

Dec. 21, 2010 - CASE COMPLETED!!!

April 28, 2011 - interview date was set to JUNE 28, 2011 @6:30AM

June 15, 2011 - MEDICAL EXAM and will be back fri (6/17/11) for results

June 28, 2011 - Interview

July 12, 2011 - arrived at LAX - and we'll live happily ever after!

Filed: Other Country: Philippines
Timeline
Posted
wow... JEANETTE07!!! you're really uplifting my spirit!!! your priority date is DEC 06... and mine is JULY 07 which is 6 months farther than yours... and if you're thinking that your beneficiary's interview will be around June or July then let's say 6 months from that will be mine.... YEHEY!!! getting closer..... Getting closer!!! as per DOREY from finding nemo.... we shoud "KEEP SWIMMING..... KEEP SWIMMING!!!!"

hi mitch.. more likely your hubby will have his interview by the end of this year if visa bulletin will move two months in a row and earlier if they will move three months in each month. :thumbs:

I-130 Track:

Apr. 19. 2006: I-130 Sent/Submitted

May.06. 2006: I-130 NOA1

Oct. 26. 2009: I-130 NOA2

NVC Track:

Oct. 20. 2009: ACL email received with case number & AOS Fee Bill from email

Oct. 25. 2009: AOS paid online

Oct. 27. 2009: AOS Cover Sheet & ACL sent via FedEx

Oct. 29. 2009: NVC received the ACL

Nov. 11/16. 2009: IV Fee Bill / paid online

Nov. 17. 2009: IV Cover Sheet & Requested to add a child in NVC case

Dec. 07. 2009: Approval of additional child in NVC case received via email & paid IV bill

Dec. 11. 2009: Sent DS-230 via LBC

Dec. 17. 2009: I-864 sent via USPS overnight & DS-230 received (as per avr)

Dec. 21. 2009: I-864 received as per avr/has reviewed DS-230

Jan. 07. 2010: Received email-checklist dated Jan.06.2010. printed & mailed it via usps.

Jan. 26. 2010: CASE COMPLETED on January 23, 2010 as per avr.

Mar. 15. 2010: Schedule was given last Feb.12/ Interview on April 22! at USEM as per operator & email

USEM Track:

Mar. 19. 2010: Left NVC and forwarded to USEM

Apr. 19-21 2010: Passed medical (me and my son) / May 4-6 passed medical (daughter)

Apr. 22. 2010: Interview APPROVED for me and my son / May 12 interivew APPROVED (daughter)

May 26. 2010: POE SEATTLE

Filed: F-2A Visa Country: India
Timeline
Posted
wow... JEANETTE07!!! you're really uplifting my spirit!!! your priority date is DEC 06... and mine is JULY 07 which is 6 months farther than yours... and if you're thinking that your beneficiary's interview will be around June or July then let's say 6 months from that will be mine.... YEHEY!!! getting closer..... Getting closer!!! as per DOREY from finding nemo.... we shoud "KEEP SWIMMING..... KEEP SWIMMING!!!!"

Mitch you are right, it is encouraging to look at these numbers and it keeps you afloat, so to speak. My PD is April 2007, so somtimes it can get your hopes up especially the way it has been described in your and jeanette's post ......hee hee hee. I think may be cases from Philippines are moving faster, coz I still have to hear from someone from my country telling me the same timeline around Jeanette and others.

130 Track:

Apr. 4. 2007: I-130 Sent/Submitted

Apr. 13. 2007: I-130 NOA1

Aug. 11. 2009: I-130 Approved

NVC Track:

Sep 16 2009: NVC Case # assigned

Mar 28 2010: DS3032 received via mail.

Mar 30 2010: DS3032 Entered into NVC sys

Apr 4 2010: AOS fee bill generated

Apr 5 2010: AOS paid online

Apr 6 2010: IV fee bill generated

Apr 13 2010: IV fee bill paid.

May 24 2010: I-864 sent

June 6 2010: DS-230 sent.

July 20 2010: Case complete at NVC

Sep 1 2010: Interview Appt Letter Received

Sep 13 2010: Medical done.

Oct 4 2010: Visa approved

Nov 2010: POE.

Nov 29: Got SSN

Dec 2010: Got Green card

Filed: IR-1/CR-1 Visa Country: Iran
Timeline
Posted

you have to keep trying !!

this is just the first step, god knows how long you have to be on hold to talk to an operator :)))

i was on hold for 34 minutes last night and i was sleeping when i heard the operator voice shouting her name :)))))

Hey guys how come every time I call NVC i get a busy signal (603 334-0700) is this the right number?

2006-06-01: I-130 Sent

2006-06-14: I-130 NOA1

2009-07-29: I-130 Approved

2009-09-11: DS-3032 / I-864 Bill generated

2009-09-12: Paid I-864 Bill

2009-09-28: Receive I-864 Package

2008-10-17: Return Completed I-864

2009-10-24: IV Bill

2009-10-25: Paid IV Bill

2009-11-07: Receive Instruction Package

2009-11-19: Original Marriage Certificate requested by NVC

2009-12-28: Original Marriage Certificate sent to NVC

2010-01-04: Original Marriage Certificate received at NVC

2010-01-12: CASE COMPLETE according to NVC Operator! HEYYYYY!!

2010-03-27: RECEIVED the INTERVIEW date :D 12 of MAYYYY! HOOOOORRRRAAAAAYYYYYYYYY!!!!!!

2010-05-12: INTERVIEWWWWWWW APPPROOOVEDDDDD - NO NAME CHEK REQUIRED

2010-05-15: GOT THE PACKAGE AND PASSPORTTT!!!!!! HHHHOOORAYYYYYYYYY

2010-0?-??: Entering LAX

Filed: Other Country: Lebanon
Timeline
Posted
you have to keep trying !!

this is just the first step, god knows how long you have to be on hold to talk to an operator :)))

i was on hold for 34 minutes last night and i was sleeping when i heard the operator voice shouting her name :)))))

LOL I got through after 45min, they didn't recieve my case yet.. Hmm..!!! how long does it take for them to recieve a case after its been approved? I was looking at other time lines and it shows after 2 to 5 days they recieve a case number.. Mine still hasn't even got there and its been 6 days

Filed: IR-1/CR-1 Visa Country: Lebanon
Timeline
Posted

Hi Lebanese girl,

just wanted to share my input, it took us about 1 month to get our approved case to NVC, then 3 months at NVC, and 2 months to wait for interview date and then we have 2 weeks of AP... It should not be too long for you, I hope!!

Keep trying to call NVC and try to get everything you can done before hand, download your forms and have hubby filled them out, have him send them to you so when you get the ok, you can just send it in, that's cuts down on the process a lot!!

Hope that helps

Nita

596696z2ypf41694.gif

I - 130

3.26.08 - NOA2 - APPROVAL IN 493 DAYS!!

NVC

7.22.08 - CASE COMPLETED IN 90 DAYS - THANK GOD!!

Embassy

9.29.08-Interview - AP (2 weeks)

10.15.08 - AP over :) Embassy called hubby to go get his Visa - HAPPIEST DAY!!!

10.20.08 - Visa Issued

11.25.08 - POE (JFK then SFO)

11.26.08 - Visa Journey is Over!! TOOK 737 DAYS....Habibi is Home!! :) :)

USA

11.25.08 - POE

12.10.08 - Applied for SS Card

12.15.08 - Welcome Letter Received

12.17.08 - SS Card Received

12.26.08 - Green Card Received :)

Begin Naturalization process 2011 ~ Inshallah

mybanner493ead35e2041shfr8.th.jpg

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...