Hi, NVC really stressed me out..

First, they didn't recognize my certified copy of BC and MC.. I called them last May 19 and told the operator that those docs are certified copy from issuing entity, which is the court where we got married in the US and registry and civilize office here in my country, the one who issued my BC. That lady said that she will put those informations on their system and request for a supervisor to review my docs. I called them again the next morning just to make sure that they really put those informations on their system, and they said it is already on their system, and ask me to wait 10-15 business days. But now May 21, they sent a RFE to my hubby's email asking for original/cert copy of my BC and MC!! It's a joke!!

I'm just hoping that email is a false RFE and was sent before I provide informations about my certified copy of BC and MC.. sigh..

im sory to hear that.. it should be a false RFE, just give them a call again tomorrow and ask about it..

dont worry, u will get through it soon....

wishing for our case completion...

Thanks xylide.. Yeah, I'm hoping it's a false RFE. I'll call NVC tomorrow and ask about it..

Hope we will hear the magic words soon. Good luck to all of us!!

you're welcome...

i'll pray that we all get our case completion...

this journey really gives me headache.. :lol:

d5muaz79s9.pngs-event.png

IR-5 for dad

02/16/12 - mailed I-130

02/27/12 - NOA1 petition received(hubby's birthday!)

06/06/12 - NOA2 stating I-130 approved

06/29/12 - NVC received case

07/09/12 - case entered in the system,assigned MNL # and IIN,email add given

07/12/12 - beneficiary emailed DS-3032, auto response received

07/18/12 - AOS fee bill/paid "IN PROCESS"

07/20/12 - AOS fee bill shows "PAID", mailed AOS package

07/25/12 - received AOS

07/25/12 - IV Fee Bill Invoiced, paid $230.00 "IN PROCESS"

07/26/12 - IV Fee bill shows "PAID"

07/28/12 - mailed IV Package

08/03/12 - received DS 230 packet

08/14/12 - sent RFE

08/16/12 - NVC received RFE

08/21/12 - log in failed

08/22/12 - case complete!

09/26-27/12 - medical at SLMC

10/04/12 - interview

12/01/12 - Left Philippines

Link to comment
Share on other sites

  • Replies 289
  • Created
  • Last Reply

Top Posters In This Topic

Filed: IR-1/CR-1 Visa Country: Germany
Timeline

the e-mails are always delayed and sometimes never sent at all. when you do talk to the operator, make sure to ask why the BC or MC were not approved.

they refused to recognize a certified copy of the international version of my husband's BC but it took talking to 3 different operators to find out that they just wanted the version in its original language only. go figure. so make sure you get all the information you can from the operators. sometimes it is faster to get a document again then have them "review" your file just to get the same RFE.

Hi, NVC really stressed me out..

First, they didn't recognize my certified copy of BC and MC.. I called them last May 19 and told the operator that those docs are certified copy from issuing entity, which is the court where we got married in the US and registry and civilize office here in my country, the one who issued my BC. That lady said that she will put those informations on their system and request for a supervisor to review my docs. I called them again the next morning just to make sure that they really put those informations on their system, and they said it is already on their system, and ask me to wait 10-15 business days. But now May 21, they sent a RFE to my hubby's email asking for original/cert copy of my BC and MC!! It's a joke!!

I'm just hoping that email is a false RFE and was sent before I provide informations about my certified copy of BC and MC.. sigh..

VSC > NVC > Frankfurt....married since 2002

07/28/2008 I-130 received

07/31/2008 NOA 1

8/15/2008 I-129F received

03/9/2009 NOA 2: I-129 F and I-130 approved (221 days)

3/17/2009 I-129 F case number assigned at Paris Consulate

3/19/2009 IR-1 case number/AOS Bill received; DS 3032 received

3/20/09 mailed in DS 3032; 3/21/09 paid AOS bill

3/25/09 AOS bill reads PAID

3/26/09 retracted K-3 application at Paris Consulate

3/26/09 mailed I-864, e-mailed DS 3032

4/3/09 I-864 received, e-mailed DS 3032 again

4/9/09 AVR: I-864 reviewed, RFE; DS 3032 accepted by e-mail; paid IV bill

4/10/09 IV bill reads PAID; received checklist letter for I-864 RFE by e-mail; received IV Bill

4/14/09 DS 230 mailed

4/15/09 DS 3032 mail version accepted

4/21/09 I-864 checklist response mailed

4/22/09 I-864 checklist response received by NVC; NVC operator says mail arrived on 4/17/09 (should be DS230!)

4/23/09 sent DS-230 addendum to NVC by overnight mail and e-mail

4/27/09 AVR: tax transcript entered into system on 4/23

4/30/29 AVR: DS-230 entered into system 4/29

5/2/09 AVR: new RFE

5/4/09 NVC: false RFE due to DS-230; e-mail version of DS-230 J-1 info received - NVC e-mail response

5/6/09 AVR: new RFE ! (passport photos???? and canadian police certificate that is not required???)

5/7/09 NVC operator: canadian police certificate not needed, file will be pulled to look for passport photos (15 bus. days)

5/14/09 AVR: checklist letter response received on 5/13; 5/16/09 AVR: checklist letter response received on 5/15

5/19/09 login to NVC site failed!

5/20/09 CASE COMPLETE!!!!

7/20/09 Interview Date

Link to comment
Share on other sites

i was trying to log on to NVC website the whole day,and just tonight i cant sign in anymore!

im so excited to get my case complete...

Really!! That's great! I should get the same result since we both have the same timeline....

Link to comment
Share on other sites

i was trying to log on to NVC website the whole day,and just tonight i cant sign in anymore!

im so excited to get my case complete...

Really!! That's great! I should get the same result since we both have the same timeline....

No such luck... Will try again tomorrow<

Link to comment
Share on other sites

the e-mails are always delayed and sometimes never sent at all. when you do talk to the operator, make sure to ask why the BC or MC were not approved.

they refused to recognize a certified copy of the international version of my husband's BC but it took talking to 3 different operators to find out that they just wanted the version in its original language only. go figure. so make sure you get all the information you can from the operators. sometimes it is faster to get a document again then have them "review" your file just to get the same RFE.

Hi, NVC really stressed me out..

First, they didn't recognize my certified copy of BC and MC.. I called them last May 19 and told the operator that those docs are certified copy from issuing entity, which is the court where we got married in the US and registry and civilize office here in my country, the one who issued my BC. That lady said that she will put those informations on their system and request for a supervisor to review my docs. I called them again the next morning just to make sure that they really put those informations on their system, and they said it is already on their system, and ask me to wait 10-15 business days. But now May 21, they sent a RFE to my hubby's email asking for original/cert copy of my BC and MC!! It's a joke!!

I'm just hoping that email is a false RFE and was sent before I provide informations about my certified copy of BC and MC.. sigh..

My BC is an original version in our language, I also provide the translation doc for that. My friend from Indonesia who also file a CR-2 had no problem at all, and she sent certified copy of applicant's BC from exactly the same office where I got my certified copy. So I don't see the reason why they can't approve mine.

I'll call them again tomorrow and ask more about it. This time I'll try to speak to a supervisor.. If they allow me.

CR1 TIme Line (California Service Center):

2009-03-02 : I-130 Sent

2009-03-04 : I-130 received by USCIS

2009-03-10 : I-130 NOA1 (Check has been cashed on March 11, 09)

2009-03-13 : Touched

2009-03-30 : I-130 Approved! 20 days after NOA1

2009-04-17 : NVC Received and assigned case # (18 days after NOA2)

2009-04-22 : Received DS-3032/I-864 Bill

2009-04-22 : Return Completed DS-3032 trough e-mail (accepted by NVC on May 04, 09, finally after 12 days)

2009-04-23 : Pay I-864 Bill

2009-04-28 : Return Completed I-864 (NVC upload in their system on May 1, 09)

2009-05-04 : Pay IV Bill

2009-05-05 : Receive IV Bill in our email

2009-05-06 : Return Completed IV package/DS-230 (NVC upload it in their system on May 11, 09)

2009-05-26 : Case Completed at NVC (39 days from case# assigned)

2009-06-04 : NVC Left

2009-06-08 : Consulate Received

2009-07-15 : Medical check up

2009-07-29 : Interview Date (PASSED)

2009-08-04 : Visa Received

2009-08-09 : US Entry

2009-08-18 : Received SS card in the mailbox

2009-08-24 : Welcome Notice

2009-09-04 : Receive Greencard (finally)

Removing Condition Time Line (Vermont Service Center):

2011-06-02 : I-751 sent

2011-06-04 : I-751 received

2011-06-06 : NOA1 date

2011-06-22 : Biometrics Notice date, received in the mail on 24th

2011-07-12 : Biometrics Appointment

2012-02-24 : Approved!

For we walk by faith, not by sight (2 Corinthians 5:7).

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
:cry: I just called and AVR said that I have some missing or incorrect information! Right at 7:30am I'll call and find out what the hec is wrong!! :wacko:

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Germany
Timeline

good luck! i know it is very frustrating. they lost out passport photos, gave us an RFE for items that were not required, etc. but you will be finished soon... this is just the last part until case complete!

the e-mails are always delayed and sometimes never sent at all. when you do talk to the operator, make sure to ask why the BC or MC were not approved.

they refused to recognize a certified copy of the international version of my husband's BC but it took talking to 3 different operators to find out that they just wanted the version in its original language only. go figure. so make sure you get all the information you can from the operators. sometimes it is faster to get a document again then have them "review" your file just to get the same RFE.

Hi, NVC really stressed me out..

First, they didn't recognize my certified copy of BC and MC.. I called them last May 19 and told the operator that those docs are certified copy from issuing entity, which is the court where we got married in the US and registry and civilize office here in my country, the one who issued my BC. That lady said that she will put those informations on their system and request for a supervisor to review my docs. I called them again the next morning just to make sure that they really put those informations on their system, and they said it is already on their system, and ask me to wait 10-15 business days. But now May 21, they sent a RFE to my hubby's email asking for original/cert copy of my BC and MC!! It's a joke!!

I'm just hoping that email is a false RFE and was sent before I provide informations about my certified copy of BC and MC.. sigh..

My BC is an original version in our language, I also provide the translation doc for that. My friend from Indonesia who also file a CR-2 had no problem at all, and she sent certified copy of applicant's BC from exactly the same office where I got my certified copy. So I don't see the reason why they can't approve mine.

I'll call them again tomorrow and ask more about it. This time I'll try to speak to a supervisor.. If they allow me.

VSC > NVC > Frankfurt....married since 2002

07/28/2008 I-130 received

07/31/2008 NOA 1

8/15/2008 I-129F received

03/9/2009 NOA 2: I-129 F and I-130 approved (221 days)

3/17/2009 I-129 F case number assigned at Paris Consulate

3/19/2009 IR-1 case number/AOS Bill received; DS 3032 received

3/20/09 mailed in DS 3032; 3/21/09 paid AOS bill

3/25/09 AOS bill reads PAID

3/26/09 retracted K-3 application at Paris Consulate

3/26/09 mailed I-864, e-mailed DS 3032

4/3/09 I-864 received, e-mailed DS 3032 again

4/9/09 AVR: I-864 reviewed, RFE; DS 3032 accepted by e-mail; paid IV bill

4/10/09 IV bill reads PAID; received checklist letter for I-864 RFE by e-mail; received IV Bill

4/14/09 DS 230 mailed

4/15/09 DS 3032 mail version accepted

4/21/09 I-864 checklist response mailed

4/22/09 I-864 checklist response received by NVC; NVC operator says mail arrived on 4/17/09 (should be DS230!)

4/23/09 sent DS-230 addendum to NVC by overnight mail and e-mail

4/27/09 AVR: tax transcript entered into system on 4/23

4/30/29 AVR: DS-230 entered into system 4/29

5/2/09 AVR: new RFE

5/4/09 NVC: false RFE due to DS-230; e-mail version of DS-230 J-1 info received - NVC e-mail response

5/6/09 AVR: new RFE ! (passport photos???? and canadian police certificate that is not required???)

5/7/09 NVC operator: canadian police certificate not needed, file will be pulled to look for passport photos (15 bus. days)

5/14/09 AVR: checklist letter response received on 5/13; 5/16/09 AVR: checklist letter response received on 5/15

5/19/09 login to NVC site failed!

5/20/09 CASE COMPLETE!!!!

7/20/09 Interview Date

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I called and talk to an operator and she said that they just need to verify the DS-230 packet that I sent because they haven't reviewd yet but they are done with the I-864. I don't understand why the system gives you a message that they have missing imformation when is not true!!!!! :angry:

Orlando...

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Germany
Timeline

it's called a "false RFE" it's just a glitch in their computer system. the review for the 230 and 864 are done by different offices. if they have finished reviewing one packet and the other one has not entered the system yet, it will show up as "missing information" and generate an RFE. but that is good news. nothing for you to do except go back to waiting for them to review your case :)

I called and talk to an operator and she said that they just need to verify the DS-230 packet that I sent because they haven't reviewd yet but they are done with the I-864. I don't understand why the system gives you a message that they have missing imformation when is not true!!!!! :angry:

Orlando...

VSC > NVC > Frankfurt....married since 2002

07/28/2008 I-130 received

07/31/2008 NOA 1

8/15/2008 I-129F received

03/9/2009 NOA 2: I-129 F and I-130 approved (221 days)

3/17/2009 I-129 F case number assigned at Paris Consulate

3/19/2009 IR-1 case number/AOS Bill received; DS 3032 received

3/20/09 mailed in DS 3032; 3/21/09 paid AOS bill

3/25/09 AOS bill reads PAID

3/26/09 retracted K-3 application at Paris Consulate

3/26/09 mailed I-864, e-mailed DS 3032

4/3/09 I-864 received, e-mailed DS 3032 again

4/9/09 AVR: I-864 reviewed, RFE; DS 3032 accepted by e-mail; paid IV bill

4/10/09 IV bill reads PAID; received checklist letter for I-864 RFE by e-mail; received IV Bill

4/14/09 DS 230 mailed

4/15/09 DS 3032 mail version accepted

4/21/09 I-864 checklist response mailed

4/22/09 I-864 checklist response received by NVC; NVC operator says mail arrived on 4/17/09 (should be DS230!)

4/23/09 sent DS-230 addendum to NVC by overnight mail and e-mail

4/27/09 AVR: tax transcript entered into system on 4/23

4/30/29 AVR: DS-230 entered into system 4/29

5/2/09 AVR: new RFE

5/4/09 NVC: false RFE due to DS-230; e-mail version of DS-230 J-1 info received - NVC e-mail response

5/6/09 AVR: new RFE ! (passport photos???? and canadian police certificate that is not required???)

5/7/09 NVC operator: canadian police certificate not needed, file will be pulled to look for passport photos (15 bus. days)

5/14/09 AVR: checklist letter response received on 5/13; 5/16/09 AVR: checklist letter response received on 5/15

5/19/09 login to NVC site failed!

5/20/09 CASE COMPLETE!!!!

7/20/09 Interview Date

Link to comment
Share on other sites

good luck! i know it is very frustrating. they lost out passport photos, gave us an RFE for items that were not required, etc. but you will be finished soon... this is just the last part until case complete!

Just called NVC this morning and they didn't forward me to a supervisor but operator did asked supervisor while hold my phone call.. and based on the information from a supervisor I don't need to process the RFE email right now because they're still reviewing my BC and MC, and they asked me to call them again next week. Hopefully it will be done by next week, so I don't need to send my original docs.

Good luck to all of us!!

CR1 TIme Line (California Service Center):

2009-03-02 : I-130 Sent

2009-03-04 : I-130 received by USCIS

2009-03-10 : I-130 NOA1 (Check has been cashed on March 11, 09)

2009-03-13 : Touched

2009-03-30 : I-130 Approved! 20 days after NOA1

2009-04-17 : NVC Received and assigned case # (18 days after NOA2)

2009-04-22 : Received DS-3032/I-864 Bill

2009-04-22 : Return Completed DS-3032 trough e-mail (accepted by NVC on May 04, 09, finally after 12 days)

2009-04-23 : Pay I-864 Bill

2009-04-28 : Return Completed I-864 (NVC upload in their system on May 1, 09)

2009-05-04 : Pay IV Bill

2009-05-05 : Receive IV Bill in our email

2009-05-06 : Return Completed IV package/DS-230 (NVC upload it in their system on May 11, 09)

2009-05-26 : Case Completed at NVC (39 days from case# assigned)

2009-06-04 : NVC Left

2009-06-08 : Consulate Received

2009-07-15 : Medical check up

2009-07-29 : Interview Date (PASSED)

2009-08-04 : Visa Received

2009-08-09 : US Entry

2009-08-18 : Received SS card in the mailbox

2009-08-24 : Welcome Notice

2009-09-04 : Receive Greencard (finally)

Removing Condition Time Line (Vermont Service Center):

2011-06-02 : I-751 sent

2011-06-04 : I-751 received

2011-06-06 : NOA1 date

2011-06-22 : Biometrics Notice date, received in the mail on 24th

2011-07-12 : Biometrics Appointment

2012-02-24 : Approved!

For we walk by faith, not by sight (2 Corinthians 5:7).

Link to comment
Share on other sites

I called and talk to an operator and she said that they just need to verify the DS-230 packet that I sent because they haven't reviewd yet but they are done with the I-864. I don't understand why the system gives you a message that they have missing imformation when is not true!!!!! :angry:

Orlando...

It's good that it's only a false RFE.. I know how you feel, I had another false RFE before..

Hope that you'll have case complete soon :thumbs:

CR1 TIme Line (California Service Center):

2009-03-02 : I-130 Sent

2009-03-04 : I-130 received by USCIS

2009-03-10 : I-130 NOA1 (Check has been cashed on March 11, 09)

2009-03-13 : Touched

2009-03-30 : I-130 Approved! 20 days after NOA1

2009-04-17 : NVC Received and assigned case # (18 days after NOA2)

2009-04-22 : Received DS-3032/I-864 Bill

2009-04-22 : Return Completed DS-3032 trough e-mail (accepted by NVC on May 04, 09, finally after 12 days)

2009-04-23 : Pay I-864 Bill

2009-04-28 : Return Completed I-864 (NVC upload in their system on May 1, 09)

2009-05-04 : Pay IV Bill

2009-05-05 : Receive IV Bill in our email

2009-05-06 : Return Completed IV package/DS-230 (NVC upload it in their system on May 11, 09)

2009-05-26 : Case Completed at NVC (39 days from case# assigned)

2009-06-04 : NVC Left

2009-06-08 : Consulate Received

2009-07-15 : Medical check up

2009-07-29 : Interview Date (PASSED)

2009-08-04 : Visa Received

2009-08-09 : US Entry

2009-08-18 : Received SS card in the mailbox

2009-08-24 : Welcome Notice

2009-09-04 : Receive Greencard (finally)

Removing Condition Time Line (Vermont Service Center):

2011-06-02 : I-751 sent

2011-06-04 : I-751 received

2011-06-06 : NOA1 date

2011-06-22 : Biometrics Notice date, received in the mail on 24th

2011-07-12 : Biometrics Appointment

2012-02-24 : Approved!

For we walk by faith, not by sight (2 Corinthians 5:7).

Link to comment
Share on other sites

Filed: Other Country: United Kingdom
Timeline

Just called NVC.. Both my parents cases are complete. :dance::dance: Officer said we will get a July interview and they will start issuing date soon.

Good Luck to those still waiting.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Seems like you need to call and call for them (NVC) to tell you whether the case was completed or not.

I called today and the lady on the phone said, that my case was completed Last week!!!!!!

Now we will be waiting for the interview letter..

Good luck to all!!! :)

"My beautiful husband is already with me... Thank you God"

smiley-happy093.gif

28b5c84dc7.png

"Missing someone is part of loving them. If you're never apart; you'll never know how strong your love is"[/b]

Link to comment
Share on other sites

Just called NVC.. Both my parents cases are complete. :dance::dance: Officer said we will get a July interview and they will start issuing date soon.

Good Luck to those still waiting.

TayRivers & Chalupa718, congrats on your case complete :dance:

CR1 TIme Line (California Service Center):

2009-03-02 : I-130 Sent

2009-03-04 : I-130 received by USCIS

2009-03-10 : I-130 NOA1 (Check has been cashed on March 11, 09)

2009-03-13 : Touched

2009-03-30 : I-130 Approved! 20 days after NOA1

2009-04-17 : NVC Received and assigned case # (18 days after NOA2)

2009-04-22 : Received DS-3032/I-864 Bill

2009-04-22 : Return Completed DS-3032 trough e-mail (accepted by NVC on May 04, 09, finally after 12 days)

2009-04-23 : Pay I-864 Bill

2009-04-28 : Return Completed I-864 (NVC upload in their system on May 1, 09)

2009-05-04 : Pay IV Bill

2009-05-05 : Receive IV Bill in our email

2009-05-06 : Return Completed IV package/DS-230 (NVC upload it in their system on May 11, 09)

2009-05-26 : Case Completed at NVC (39 days from case# assigned)

2009-06-04 : NVC Left

2009-06-08 : Consulate Received

2009-07-15 : Medical check up

2009-07-29 : Interview Date (PASSED)

2009-08-04 : Visa Received

2009-08-09 : US Entry

2009-08-18 : Received SS card in the mailbox

2009-08-24 : Welcome Notice

2009-09-04 : Receive Greencard (finally)

Removing Condition Time Line (Vermont Service Center):

2011-06-02 : I-751 sent

2011-06-04 : I-751 received

2011-06-06 : NOA1 date

2011-06-22 : Biometrics Notice date, received in the mail on 24th

2011-07-12 : Biometrics Appointment

2012-02-24 : Approved!

For we walk by faith, not by sight (2 Corinthians 5:7).

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline
Just called NVC.. Both my parents cases are complete. :dance::dance: Officer said we will get a July interview and they will start issuing date soon.

Good Luck to those still waiting.

congratulations :)

we all wait for the Interview letters

did he told u (the officer ) when they will start with this ?!

YA ALAH Bless Our Joureny To The End , Ameen

Je T'aime Till My Dying Day

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...