Called NVC to check to see if our case is on final riview but nothing is happening :crying: Will keep calling hoping that we get our case completed early this week.

Orlando.... :blink:

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

  • Replies 289
  • Created
  • Last Reply

Top Posters In This Topic

Filed: IR-1/CR-1 Visa Country: India
Timeline
This is kiilling me!!!!!! :wacko: I can't wait becuase the timming is important to be able to use our K-3 interview on June 22nd as CR-! and this wait is killing me!!!!!!!!!!!! :crying::crying:

Orlando...

dont wana let you down :)

but i see ur K3 Interview in June 23 i guess ...

if ur case complete that week , GOD willing u may get an Interview for July , if not then u wait the next assign times ..so either ways i believe ur K3 is to come first ..so investigate this with ur embassy if they can put the K3 on hold till u do the CR-1

thts the only best solution

my best wishes :)

I also was hoping to convert K3 (Jun 9th) interview to CR1. I didn't have success since my case is stuck in so called final review from past three weeks. Haven't been 15 business days yet so can't do much. Anyway my wife is going to go for her K3 interview and visit me on that. Once she gets her CR1 interview she will go back for it. This is going to cost me $600 for her return tickets but she will get to spend time with me.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
This is kiilling me!!!!!! :wacko: I can't wait becuase the timming is important to be able to use our K-3 interview on June 22nd as CR-! and this wait is killing me!!!!!!!!!!!! :crying::crying:

Orlando...

dont wana let you down :)

but i see ur K3 Interview in June 23 i guess ...

if ur case complete that week , GOD willing u may get an Interview for July , if not then u wait the next assign times ..so either ways i believe ur K3 is to come first ..so investigate this with ur embassy if they can put the K3 on hold till u do the CR-1

thts the only best solution

my best wishes :)

I also was hoping to convert K3 (Jun 9th) interview to CR1. I didn't have success since my case is stuck in so called final review from past three weeks. Haven't been 15 business days yet so can't do much. Anyway my wife is going to go for her K3 interview and visit me on that. Once she gets her CR1 interview she will go back for it. This is going to cost me $600 for her return tickets but she will get to spend time with me.

I didn't know that it was passible to get the K-3 and also the CR-1! Is that really possible?

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
This is kiilling me!!!!!! :wacko: I can't wait becuase the timming is important to be able to use our K-3 interview on June 22nd as CR-! and this wait is killing me!!!!!!!!!!!! :crying::crying:

Orlando...

dont wana let you down :)

but i see ur K3 Interview in June 23 i guess ...

if ur case complete that week , GOD willing u may get an Interview for July , if not then u wait the next assign times ..so either ways i believe ur K3 is to come first ..so investigate this with ur embassy if they can put the K3 on hold till u do the CR-1

thts the only best solution

my best wishes :)

I also was hoping to convert K3 (Jun 9th) interview to CR1. I didn't have success since my case is stuck in so called final review from past three weeks. Haven't been 15 business days yet so can't do much. Anyway my wife is going to go for her K3 interview and visit me on that. Once she gets her CR1 interview she will go back for it. This is going to cost me $600 for her return tickets but she will get to spend time with me.

I didn't know that it was passible to get the K-3 and also the CR-1! Is that really possible?

As far as I know you have option to either do AOS or go back to you country and do CR1 interview.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
This is kiilling me!!!!!! :wacko: I can't wait becuase the timming is important to be able to use our K-3 interview on June 22nd as CR-! and this wait is killing me!!!!!!!!!!!! :crying::crying:

Orlando...

dont wana let you down :)

but i see ur K3 Interview in June 23 i guess ...

if ur case complete that week , GOD willing u may get an Interview for July , if not then u wait the next assign times ..so either ways i believe ur K3 is to come first ..so investigate this with ur embassy if they can put the K3 on hold till u do the CR-1

thts the only best solution

my best wishes :)

I also was hoping to convert K3 (Jun 9th) interview to CR1. I didn't have success since my case is stuck in so called final review from past three weeks. Haven't been 15 business days yet so can't do much. Anyway my wife is going to go for her K3 interview and visit me on that. Once she gets her CR1 interview she will go back for it. This is going to cost me $600 for her return tickets but she will get to spend time with me.

I didn't know that it was passible to get the K-3 and also the CR-1! Is that really possible?

As far as I know you have option to either do AOS or go back to you country and do CR1 interview.

ok I was no aware of that! :huh:

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

case completed as of 6/8/09..yeah.finally! You will get yours soon. Keep calling!

USCIS Took 5 months for me (too long)

I-130 Sent : 2008-09-02

I-130 NOA1 : 2008-09-08

I-129F Sent :

I-129F NOA1 : 2008-09-23

I-129F RFE(s) : 2009-02-05

RFE Reply(s) : 2009-02-06

I-129F NOA2 : 2009-02-10

G325A sent to USCIS- 2009- 02-05

G325A received by USCIS- 2009- 02-06

I-130 Approval : 2009-02-10

I130 and I129 F APPROVED AT THE SAME TIME

NVC Took almost 4 months

02/23/2009- NVC Received and case number assigned (Oh! God is great!)

02/26/09- Received DS-3032 / I-864 Bill

03/03/09- Emailed DS3032 (using Jame's shortcut)

03/06/09- Mailed DS3032 via DHL

03/11/09- DHL arrived at NVC- 2009-03-09, DS-3032 E-Mail accepted

03/15/09-Paid I-864 Bill, Receive I-864 Package

03/16/09 -IV Bill generated

03/16/09- Received IV Bill

03/17/2009-Paid IV Bill

05/10/09- Returned Completed I-864

5/18/09- RFE received for DS230/ Sent response through DHL from PI

05/20-05/21/09- Early medical- passed

5/22/09- RFE received for AOS package (wooo..grr))

5/27/09- AOS response overnight to NVC

5/28/09- NVC received checklist (Ds230) as per AVR/ under REVIEW

6/02/09- I-1864 RFE was entered into the system- Review begins

6/05/09- NVC website log-in failed

06/08/09- case completed (per operator/US time) 6/9/09- PH time ..yeah! :-)

06/09/09- interview date assigned (through email)

07/28/09- Cr1 interview date (APPROVED)

07/30/09-Visa Received

08/07/09- US Entry : POE: LAX

08/08/09- Arrival to destination

08/20/09- Permanent card received

10/13/09- SSN received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
case completed as of 6/8/09..yeah.finally! You will get yours soon. Keep calling!

Congratulations!!!! and I'm hoping to get our case completed today Tuesday or Wednesday!!!! keep in touch.

Orlando..... :thumbs:

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

My last RFE was entered into their system on the 2nd and got our case completed on the 8th. So, give them at least 3 days to complete your case, but I can see that your RFE was entered into their system on the 5th, so it will be done very soon. You are just couting days. Try logging into the NVC website and once it fails, it's a good sign that the next day or 2 you will have your case completed. Good luck!

USCIS Took 5 months for me (too long)

I-130 Sent : 2008-09-02

I-130 NOA1 : 2008-09-08

I-129F Sent :

I-129F NOA1 : 2008-09-23

I-129F RFE(s) : 2009-02-05

RFE Reply(s) : 2009-02-06

I-129F NOA2 : 2009-02-10

G325A sent to USCIS- 2009- 02-05

G325A received by USCIS- 2009- 02-06

I-130 Approval : 2009-02-10

I130 and I129 F APPROVED AT THE SAME TIME

NVC Took almost 4 months

02/23/2009- NVC Received and case number assigned (Oh! God is great!)

02/26/09- Received DS-3032 / I-864 Bill

03/03/09- Emailed DS3032 (using Jame's shortcut)

03/06/09- Mailed DS3032 via DHL

03/11/09- DHL arrived at NVC- 2009-03-09, DS-3032 E-Mail accepted

03/15/09-Paid I-864 Bill, Receive I-864 Package

03/16/09 -IV Bill generated

03/16/09- Received IV Bill

03/17/2009-Paid IV Bill

05/10/09- Returned Completed I-864

5/18/09- RFE received for DS230/ Sent response through DHL from PI

05/20-05/21/09- Early medical- passed

5/22/09- RFE received for AOS package (wooo..grr))

5/27/09- AOS response overnight to NVC

5/28/09- NVC received checklist (Ds230) as per AVR/ under REVIEW

6/02/09- I-1864 RFE was entered into the system- Review begins

6/05/09- NVC website log-in failed

06/08/09- case completed (per operator/US time) 6/9/09- PH time ..yeah! :-)

06/09/09- interview date assigned (through email)

07/28/09- Cr1 interview date (APPROVED)

07/30/09-Visa Received

08/07/09- US Entry : POE: LAX

08/08/09- Arrival to destination

08/20/09- Permanent card received

10/13/09- SSN received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
My last RFE was entered into their system on the 2nd and got our case completed on the 8th. So, give them at least 3 days to complete your case, but I can see that your RFE was entered into their system on the 5th, so it will be done very soon. You are just couting days. Try logging into the NVC website and once it fails, it's a good sign that the next day or 2 you will have your case completed. Good luck!

Thank you!! I'm crossing my fingers and keep praying to see is this is over soon!!

Orlando....

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

I'm in big surprised. I completed my case on the 8th and I got my interview appointment letter in my email today, dated 06/09/09 for July 28, 09 interview. this is great!

USCIS Took 5 months for me (too long)

I-130 Sent : 2008-09-02

I-130 NOA1 : 2008-09-08

I-129F Sent :

I-129F NOA1 : 2008-09-23

I-129F RFE(s) : 2009-02-05

RFE Reply(s) : 2009-02-06

I-129F NOA2 : 2009-02-10

G325A sent to USCIS- 2009- 02-05

G325A received by USCIS- 2009- 02-06

I-130 Approval : 2009-02-10

I130 and I129 F APPROVED AT THE SAME TIME

NVC Took almost 4 months

02/23/2009- NVC Received and case number assigned (Oh! God is great!)

02/26/09- Received DS-3032 / I-864 Bill

03/03/09- Emailed DS3032 (using Jame's shortcut)

03/06/09- Mailed DS3032 via DHL

03/11/09- DHL arrived at NVC- 2009-03-09, DS-3032 E-Mail accepted

03/15/09-Paid I-864 Bill, Receive I-864 Package

03/16/09 -IV Bill generated

03/16/09- Received IV Bill

03/17/2009-Paid IV Bill

05/10/09- Returned Completed I-864

5/18/09- RFE received for DS230/ Sent response through DHL from PI

05/20-05/21/09- Early medical- passed

5/22/09- RFE received for AOS package (wooo..grr))

5/27/09- AOS response overnight to NVC

5/28/09- NVC received checklist (Ds230) as per AVR/ under REVIEW

6/02/09- I-1864 RFE was entered into the system- Review begins

6/05/09- NVC website log-in failed

06/08/09- case completed (per operator/US time) 6/9/09- PH time ..yeah! :-)

06/09/09- interview date assigned (through email)

07/28/09- Cr1 interview date (APPROVED)

07/30/09-Visa Received

08/07/09- US Entry : POE: LAX

08/08/09- Arrival to destination

08/20/09- Permanent card received

10/13/09- SSN received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
I'm in big surprised. I completed my case on the 8th and I got my interview appointment letter in my email today, dated 06/09/09 for July 28, 09 interview. this is great!

I will call that a blessing!! good luck on you interview. :thumbs:

Orlando..

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Guys, what are tax transcripts? Isn't that just the tax forms we filled out when we did our taxes at the end of the year? Or is there some official forms we need to get from the IRS? I ususally just did my taxes either handwritten forms or online and made copies of what I did. Will that suffice?

USCIS STAGE

Service Center : California Service Center

Consulate : Islamabad, Pakistan

Marriage : 2008-11-11

I-130 Sent : 2008-12-18

I-130 NOA1 : 2008-12-23

I-130 Approved : 2009-04-23

NOA2 Hard Copy: 2009-04-27

NVC STAGE

NVC Received : 2009-5-5

Case # Assigned: 2009-5-6

Received DS-230 / I-864 Bill : e-mail received 2009-5-20

Pay I-864 Bill : 2009-6-2

Return Completed I-864 : 2009-07-10

Return Completed DS-230 : 2009-07-10

Receive IV Bill : 2009-5-20

Pay IV Bill : 2009-6-2

RFE: 2009-7-22

Returned Missing Docs: 2009-7-27

NVC Resumes Processing: 2009-7-30

Case Completed at NVC :2009-8-7

Embassy Stage

Flight to Pakistan: 2009-9-30

Medical: 2009-10-05

Interview: 2009-10-20

AP Start: 2009-10-20

Back to States alone :'( 2010-2-17

AP Done: 2010-2-23

POE:

b7evpzub78.gif

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
Guys, what are tax transcripts? Isn't that just the tax forms we filled out when we did our taxes at the end of the year? Or is there some official forms we need to get from the IRS? I ususally just did my taxes either handwritten forms or online and made copies of what I did. Will that suffice?

You have to call IRS and request your tax transcrips, this will be all information about your taxes from 2006,2007 and 2008. There is no cost for tris and ones you call them they will now what are you talking about, they will only ask you which years you need.

Good luck,

Orlando.... :thumbs:

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I have no idea what is going on with our case that NVC don't do anything with it!! Are they normally this slow at this part of the month? or is just me that I'm too anxious? :crying:

Orlando....

I-130

09/19/08 Mailed I-130

09/29/08 NOA1 Recieved

04/10/09 I-130 Approved

04/18/09 NOA2 Recieved

04/17/09 Case recieved by NVC

04/30/09 AOS Bill Recieved

04/30/09 DS-3032 Recieved

05/01/09 AOS Bill Paid

05/01/09 DS-3032 Email Sent

05/07/09 Sent I-864

05/11/09 Overnight DS-3032

05/13/09 Paid Bill IV "In Process"

05/14/09 Bill IV "Paid"

05/14/09 Overnight DS-230 Doc's

05/15/09 DS-230 recieved by NVC

05/22/09 Case on review

05/28/09 NVC requested original beneficiary divorse papers

05/29/09 Fedex RFE

06/05/09 RFE uploaded on NVC system (Finally)

06/15/09 Case Completed

06/26/09 File Left NVC

06/30/09 File arrived Embassy

07/21/09 Medical

07/22/09 CR-1 Interview Day

07/22/09 Visa Approved

xx/xx/xx Visa recieved

08/05/09 Finally home - End of Journey

09/14/09 Welcome letter and Green Card recieved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
I have no idea what is going on with our case that NVC don't do anything with it!! Are they normally this slow at this part of the month? or is just me that I'm too anxious? :crying:

Orlando....

Yeah My Case is also slow they have just added RFE in NVC.. My wife in in Pakistan and waiting it.... Operator are very rude at NVC need to complain Department of State...

HAQUE

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...