The violent protests of people in different city localities, against prolonged power failures have made no difference on the performance of the Karachi Electric Supply Corporation (KESC), as people continue to suffer on the seventh consecutive day of the prevailing power crisis.

As the cable faults and feeder trippings continue in the metropolis, the power utility also carried out load-shedding in different city areas during the day and in the evening for a total duration of about three hours. The work to rejoin 132 KV Extra High Tension (EHT) Line carrying electricity from Civil Aviation-Landhi Circuit could not be completed till evening, causing system overloading, which led to more breakdowns.

On Wednesday, people in different localities attacked and ransacked KESC complaint centres and in Gulistan-e-Jauhar locality, enraged protestors torched the area complaint centre. The KESC spokesman said that those complaint centres, which were damaged by angry protestors, were made operational on Wednesday night.

Many vehicles of the KESC were damaged by angry protestors and one of the vehicles was torched in Lasbela area. Also, in Gulshan-e-Iqbal and Pak Colony localities, angry residents took to streets and blocked the main roads for vehicular traffic. They pelted stones on moving vehicles and burnt tyres on roads. The KESC staff responsible for repairing of faults was working under police protection in Gulshan-e-Iqbal, Gulistan-e-Jauhar, Nazimabad, Liaquatabad and other affected areas.

Even though, the KESC failed to maintain uninterrupted power supply in the metropolis, residents said that the intensity of power breakdowns were relatively less compared to those experienced during the last four days.

However, reports of long duration of power cuts were received from Gulshan-e-Iqbal, Pak Colony, Metroville III, Gulistan-e-Jauhar, Malir, Landhi, Khokhrapar, Model Colony, Airport, Liaquatabad, Gulbahar, Nazimabad, Federal B Area, Lyari, II Chundrigar Road, Old City Areas, Garden, Defence, Gizri and other localities.

A resident of Federal B Area Block 9 said that his area experienced two power breakdowns for a total duration of three hours. He said that though problem was still unresolved, the situation was much better as compared to Tuesday, when his locality remained without power for a total of 14 hours.

Criticising the management of the KESC, a resident of Gulshan-e-Iqbal said in the current hot weather his entire locality experienced two power breakdowns for three hours each.

An irate resident of Liaquatabad area said that KESC authorities deliberately shut their electricity in order to maintain uninterrupted power supply to affluent localities.

However, a spokesman for the KESC said that in the morning, the power utility faced acute shortage of 100 megawatts electricity and it carried out group-wise load-shedding to meet the demand. Again, he said, during evening peak hours, the cityís power demand touched 2250 megawatts against the supply of 2100 mw electricity. The KESC had no other option but to carryout load-shedding for one-and-half hour to meet the shortage of 150 MW.

Regarding work to rejoin EHT line at Civil Aviation-Landhi Circuit, he hoped that the work would be completed late in the night and after its completion, the system overloading could be minimised. He said that work to repair cable faults in Gulshan-e-Iqbal and Gulistan-e-Jauhar areas was going on and it would be completed in the night.

He said that KESC was facing difficulties in attending peopleís complaints due to the fact that angry protestors had damaged many complaint centres.

However, till our filing of this report, angry people in Lasbela area took to streets, pelted moving vehicles with stones, burnt tyres on roads, damaged traffic signals and raised slogans against the management of the KESC for failing to provide electricity in their locality.

The vehicular traffic on Nishtar Road and Nawab Siddique Ali Khan Road was also blocked due to the violence in Lasbela. Police and Rangers reached the scene and tried to calm down the angry protestors.

The KESC staff responsible for repairing of faults was working under police protection in Gulshan-e-Iqbal, Gulistan-e-Jauhar, Nazimabad, Liaquatabad and other affected areas.

Aapki Nazroan Ne Samjha, Pyaar Ke Kabil Mujhe

Dil Ki Ai Dharkan Thaher Ja, Mil Gayee Manzil Mujhe

I-130 Process

01-29-2006 | Marriage

02-13-2006 | Mailed to NSC

02-27-2006 | NOA1

06-15-2006 | I-130 Approved

I-129F Process

03-08-2006 | Mailed to CHICAGO LOCKBOX

03-13-2006 | NOA1

07-31-2006 | I-129F Approved

09-01-2006 | K3 Interview, Visa Approved

09-14-2006 | Passport recieved from Consulate

01-23-2007 | POE at Chicago

AOS process

07-25-2007 | Mailed to CHICAGO LOCKBOX

08-30-2007 | NOA1

09-07-2007 | Biometrics Appointment

01-28-2008 | AOS interview-More evidence requested

02-07-2008 | AOS approved

02-19-2008 | Recieved Green Card in mail

Link to comment
Share on other sites

Typical of the sub-continent... we had an 18 hour power cut on Sunday (I think) and another on Monday - for about 12 hours. Daily power cuts of a couple of hours at a stretch are the norm... the area I live in New bloody Delhi is a fairly affluent area... but only the government and the diplomatic areas have next to no power cuts... or the extremely affluent areas... the poorer parts of New bloody Delhi have virtually no leccy to speak of - 14-15 hours a day... just goes to show what a frigging economic giant this place is!!!

In fact since they privatised things in New bloody Delhi things have got worse for the part of Delhi dealt with by the Bimbani's (Ambani borthers and their bollywood #######)... we have had 9 hour power cuts every day for a period of 1 year... but the part dealt with by the tatas ha go better... we had our home catch fire twice after the Bimbani's took over... was informed by their frigging company that they are not obliged to provide leccy at any given voltage that it can be increased as and when they choose... what I said to the person who said that to me is simply not repeatable... suffice to say I completely emasculated him.

Paul and I met on the Bazaar on the 14th January (he joined my progressive rock forum that day)

July 3rd he flew to England to meet me

We fell in love while he drove all over the place coz I cannot read maps (we were supposed to go to Ingleton - but touched Darlington 4 times, Pierce Bridge 6 times, Scotch Corner twice and Bernard Castle twice and we never did make it to Ingleton)

It has been so long and so much has happened in between...

Arrived in Houston on October 29th 2006

Married 17th November 2006

Lost my father 8th January 2007 (all dates are a blur after this)

Conditional Green Card dated 24th October 2007

I-751 posted on 6th August 2009

Received on 7th August 2009 in VT

Melo's Prog Bazaar

CTTE

Link to comment
Share on other sites

He said that KESC was facing difficulties in attending peopleís complaints due to the fact that angry protestors had damaged many complaint centres.

:lol:

"The fact that we are here today to debate raising America’s debt limit is a sign of leadership failure. It is a sign that the U.S. Government can’t pay its own bills. It is a sign that we now depend on ongoing financial assistance from foreign countries to finance our Government’s reckless fiscal policies."

Senator Barack Obama
Senate Floor Speech on Public Debt
March 16, 2006



barack-cowboy-hat.jpg
90f.JPG

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Brazil
Timeline

He said that KESC was facing difficulties in attending peopleís complaints due to the fact that angry protestors had damaged many complaint centres.

:lol:

anyone else see cause and effect there? :lol:

* ~ * Charles * ~ *
 

I carry a gun because a cop is too heavy.

 

USE THE REPORT BUTTON INSTEAD OF MESSAGING A MODERATOR!

Link to comment
Share on other sites

thats right

Aapki Nazroan Ne Samjha, Pyaar Ke Kabil Mujhe

Dil Ki Ai Dharkan Thaher Ja, Mil Gayee Manzil Mujhe

I-130 Process

01-29-2006 | Marriage

02-13-2006 | Mailed to NSC

02-27-2006 | NOA1

06-15-2006 | I-130 Approved

I-129F Process

03-08-2006 | Mailed to CHICAGO LOCKBOX

03-13-2006 | NOA1

07-31-2006 | I-129F Approved

09-01-2006 | K3 Interview, Visa Approved

09-14-2006 | Passport recieved from Consulate

01-23-2007 | POE at Chicago

AOS process

07-25-2007 | Mailed to CHICAGO LOCKBOX

08-30-2007 | NOA1

09-07-2007 | Biometrics Appointment

01-28-2008 | AOS interview-More evidence requested

02-07-2008 | AOS approved

02-19-2008 | Recieved Green Card in mail

Link to comment
Share on other sites

  • 2 months later...
Typical of the sub-continent... we had an 18 hour power cut on Sunday (I think) and another on Monday - for about 12 hours. Daily power cuts of a couple of hours at a stretch are the norm... the area I live in New bloody Delhi is a fairly affluent area... but only the government and the diplomatic areas have next to no power cuts... or the extremely affluent areas... the poorer parts of New bloody Delhi have virtually no leccy to speak of - 14-15 hours a day... just goes to show what a frigging economic giant this place is!!!

Actually, the "poorer" areas very oft DON't suffer--because they have lotsa "vampire-tap" experts (or some stray dogs can be used/sacrificed AS vampire-taps). :lol: :lol:

2005/07/10 I-129F filed for Pras

2005/11/07 I-129F approved, forwarded to NVC--to Chennai Consulate 2005/11/14

2005/12/02 Packet-3 received from Chennai

2005/12/21 Visa Interview Date

2006/04/04 Pras' entry into US at DTW

2006/04/15 Church Wedding at Novi (Detroit suburb), MI

2006/05/01 AOS Packet (I-485/I-131/I-765) filed at Chicago

2006/08/23 AP and EAD approved. Two down, 1.5 to go

2006/10/13 Pras' I-485 interview--APPROVED!

2006/10/27 Pras' conditional GC arrives -- .5 to go (2 yrs to Conditions Removal)

2008/07/21 I-751 (conditions removal) filed

2008/08/22 I-751 biometrics completed

2009/06/18 I-751 approved

2009/07/03 10-year GC received; last 0.5 done!

2009/07/23 Pras files N-400

2009/11/16 My 46TH birthday, Pras N-400 approved

2010/03/18 Pras' swear-in

---------------------------------------------------------------------

As long as the LORD's beside me, I don't care if this road ever ends.

Link to comment
Share on other sites

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...