Hi all :star:

Where is everybody?? Chilling now that we have interview dates?

Here is our revised interview list. I added Mayra:

3/25 - Pat the man - Case Complete on 4/13/09

4/1 - Elima - Case Complete on 4/10/09

4/2 - GS4EVER - Case complete on 4/21; interview 06/17/09, assigned 04/27/09, Case forwarded to consulate: 04/28/09

4/3 - atk_721 - Case Complete on 4/21/09, Interview: 6/24/09, assigned on 04/23/09, Case forwarded to consulate: 4/24/2009

4/3 - oceansea1 - Case Complete on 4/23/09, Interview: 6/2/09

4/6 - Serendipity_ - Case Complete on 4/23/09

4/6 - champi - Case Complete on 4/13/09, Interview: 6/2/09, assigned on 04/23/09, Case forwarded to consulate: 4/24/2009

4/6 - Eca y Bubu - Case Complete on 4/17/09, Interview: 6/1/09

4/7 - Ben and Ash - Case Complete on 4/17/09, Interview: 6/16/09, assigned on 04/23/09

4/8 - _Hopefully - Case Complete on 4/15/09, Interview: 6/2/09

4/8 - Amanda_Raad- Case complete, Interview 6/15/09

4/10 - VivianNYC - case Complete on 4/20/09, Interview: 6/16/09, Case forwarded to the consulate on 4/24/2009.

4/10 - corinne from oz - Case Complete on 4/17/09

4/10 - gixbr - case Complete on 4/20/09, Interview: 6/3/09, assigned on 04/24/09

4/10 - K.D - Case Complete on 4/20/09, Interview: 6/8/09, assigned on 04/24/09

4/15 - Vny- Case Complete, Interview 06/08/09, case forwaded to consulate 04/29/09

4/23 - IlovemyDirtDoctor Case Complete

4/29- MayraandJuan- Case complete

Feel free to add to it if something or someone is missing.

47 days and counting!!

4/30 Case Complete. Thank GOD!

and here is a new SPREADSHEET and please let me know if i missed anything

Good Luck :thumbs:

Hi th3mo, good job with the spreadsheet.

CR1 and Brazil for me! :)

----------------------------------------------

Our Timeline:

(California Service Center)

I-129F and I-130

11/23/08 - I-130 sent

12/16/08 - I-129F sent

02/23/09 - NOA2 I-130

02/23/09 - NOA2 I-129F

CR1 Process on NVC:

03/03/09 - NVC received papers

03/05/09 - NVC number assigned

03/09/09 - NVC generated DS 3032 and AOS bill

03/10/09 - E-mailed and mailed DS 3032

03/13/09 - Paid for AOS bill

03/18/09 - Choice of agent accepted by e-mail

03/20/09 - Got e-mail with IV bill

03/20/09 - Paid for IV bill

03/25/09 - Sent the IV DS-230 packet by mail direct from beneficiary's country

03/28/09 - Sent the AOS packet by mail

04/01/09 - AOS packet delivered at NVC

04/08/09 - DS-230 Packet delivered at NVC ( I don't know why that long it was stuck at Customs for like 2 weeks!!!)

04/09/09 - AVR says it's missing the DS-230 (False RFE)

04/09/09 - AOS approved

04/10/09 - DS 230 entered into the system, probably under review now.

04/13/09 - AVR says "The NVC has received the checklist letter response on April 10th"

04/20/09 - Case Completed at NVC

04/24/09 - Got e-mail with the appointment letter

Consular Process

05/26/09 - Medical Exam

06/03/09 - Interview Date!!!! PASSED!!

06/06/09 - Received passport and the Big Brown Envelope

06/24/09 - POE

-----------------------------------------------

Link to comment
Share on other sites

  • Replies 1.1k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

Filed: K-3 Visa Country: Lebanon
Timeline

ILovemyDoc, Glad we made u laugh :star: . Hang in there! There is still plenty of time till 2nd week of May.

Gixbr, nice to c u again. How did u (or anyone else) manage to open the spreadsheet? I am not able to :unsure:

Edited by GS4EVER

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

GS I just went on the link and its there.....What error message ur getting.

Th3mo can u pls add Pakistan and CR1 for me....

Thanks .....

BTW ,where is our Champi.......I wonder if she is out shopping for her new apartment or making arrangments for her bday :)

Mar 4,06 I-130 sent ,rcvd Mar 7,06

Oct 24,08 USC, called to Upgrade

Nov 1,08 Citizenship certificate sent

Jan 3,09 Case upgraded.

Jan 6,09 TOUCHED!!!

Feb 13,09 Approved : )

Feb 20,09 Case # assigned

Mar 2,09 bill paid online,DS-3032 emailed

Mar 4,09 NVC recvd fee

Mar 10,09 AOS sent

Mar 30,09 mailed DS-230

Apr 13,09 CASE COMPLETED(per operators)

Apr 20,09 FINAL REVIEW

Apr 21,09 CASE COMPLETED (per AVR)

Apr 23,09 called:INTERVIEW JUNE 24th

Jun 24,09 AP, 1-3 months

Calling DOS begins,here is what I was told

Jul 7,09 No info @ DOS

Jul 10,09 Case sent to DC-pending

Jul 17,09 Pending

Jul 24,09 Pending,you can call every day for update but the day they call him for passport it means something is up so you get to know it before we do

Jul 31,09 Pending AP

Aug 06,09 Call from USEM requesting to submit passport

Aug 07,09 Every thing looks very good,visa issuance is up to the consulate!!!

Aug 07,09 Passport submitted

Aug 07,09 USEM is requesting applicant's passport :)

Aug 17,09-call 1 Visa issued Aug 3rd,EM recvd passport on 10th but still havent returned it

Aug 17,09-call 2 Case pending some kind of processing (URGHHHHHHHHH NOT AGAIN)

Aug 18,09 call to pick up passport,picked up from AMEX

Sep 26,09 REUNION :)

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Egypt
Timeline

HI all ,now all requested add done you can check it if still missing any thing feel free and let me know B)

Edited by th3mo

Service Center: Vermont Service Center

Consulate : Egypt

Marriage : 2008-03-03

I-130 Sent : 2008-05-29

I-130 NOA1 : 2008-06-06

TOUCHED : 2008-31-12

I-130 Approved : 2009-1-1

.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Italy
Timeline

okiee dokiee im here too lol

Married:10-04-2008

USCIS

I-130 Sent : 12-12-2008

I-130 NOA1 : 12-18-2008

APPROVED: 03-05-2009

NVC

Case Entered Into NVC: 03-18-2009

NVC Sent DS-3032/I-864 Bill: 03-25-2009

E-mailed DS-3032: 03-26-2009

Received DS-3032 / I-864 Bill: 03-30-3009

Paid I-864 Bill: 03-30-2009

I-864 Bill Shows as PAID: 04-01-2009/printed the document cover sheet

Sent I-864 Package: 04-02-2009

NVC put the I-864 in system: 04-07-2009

Mailed Ds-3032 after not hearing anything about the e-mail overnight thru usps: 04-08-2009

(Same Day) got e-mail from nvc approving Ds-3032/ IV Bill (hahah)

Paid IV bill: 04-08-2009

IV Bill Shows as PAID: 04-10-2009/printed the document cover sheet

**** waiting for husband to send me police record****

NVC e-mailed Checklist: 04-21-2009/printed that cover sheet too

Sent Ds-230 overnight thru usps: 04-23-2009

AVR-Checklist Received: 04-24-2009

Sign in error to nvc website: 05-04-2009

Final Review: 05-05-2009

Case Complete @ NVC: 05-06-2009 (no Rfe for I-864 or Ds-230 yey)

NVC Scheduled interview: 05-11-2009

Received E-mail from NVC for Interview: 05-12-2009

NVC forwarded case to Naples: 05-12-2009

Embassy @ Naples Received case: 05-14-2009

Medical: 06-22-2009

Interview Date: 06-23-2009@8am 2 days b4 his b-day!! (Got Visa)

POE:06-30-09 JFK

bday006-1.jpglasvegasandindia495-1.jpgpic324123131.jpg

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Japan
Timeline
hes stationed there vny..... will be moving though.... are you originally from there.... i love that place.... been there twice :) its a long flight for me though.... i have to get 3 plans of a whole 36 hours journey to get there... so this swine flu thing is not helping right now

Hey Wifey,

Will be glad to have you here. Hope your interview goes well and you will be here soon. Yup, been here all of my 29 years I've been alive. But you know what, seems like I've been 29 for the last 18 years. Oh well.......

And th3mo,

Mahalo for the update on the database. I'm sure it will be of help to those still waiting for their interviews. It really is painful waiting and waiting and waiting and not knowing what is going to happen next. This may give some people at least some hope. I know I really got a lot from this website, mostly from all of you guys and I can only hope that I can contribute in some small way.

Aloha everyone,

vny

Event Date

Service Center : California Service Center

Consulate : Tokyo, Japan

2008-08-08 Marriage

2008-10-31 I-130 Sent

2008-11-07 I-130 NOA1

2009-02-19 I-130 Approved

2009-02-23 NVC Received

2009-03-12 NVC assigns case number (find out from calling NVC everyday)

2009-03-12 Emailed DS-3032

2009-03-14 Received DS-3032 / I-864 bill instructions in snail mail.

2009-03-14 Pay I-864 Bill online

2009-03-14 Receive I-864 Package electronically right after paying online.

2009-03-21 Mail Completed I-864

2009-03-25 Received email from NVC that DS-3032 accepted.

2009-03-25 Pay IV Bill online

2009-03-25 Receive Instruction Package online after paying IV bill

2009-04-02 Mailed DS-230 package via USPS Priority mail

2009-04-06 USPS online tracking says package delivered.

2009-04-08 NVC acknowledges receipt of DS-230 package

2009-04-15 Case Completed at NVC

2009-04-30 According to operator left NVC. Yaa!!! Finally AVR says forwarded to counsulate!!!

2009-05-06 to 19 Going to visit Honey in Japan!!! Back home now but HAD A GREAT TIME!!!

2009-05-07 Consulate Received

2009-06-08 Passed Interview!!! Yay!!! Finally!!!

2009-06-10 Passport and Visa paperwork received in mail.

2009-06-19 POE Hawaii!!!

2009-06-24 Visit SSA office

2009-07-01 SSN card arrived in mail

2009-07-09 I-797C Welcome notice arrived in mail

2009-07-16 GC received in mail

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Malta
Timeline
HI all ,now all requested add done you can check it if still missing any thing feel free and let me know B)

Thanks th3mo.... very good work... even though im from malta my consulate is Naples italy though....

vny : its really a lovely place.... I hope i ll get to visit the other islands too coz ive been only on Oahu :)

N400 sent : 2012-10-27

Check Cashed : 2012-11-05

Bio Appointment : 2012-11-23

Walk-In Biometrics : 2012-11-14

Interview Appointment : 2013-04-12

Approved : 2013-04-12

Oath Ceremony : 2013-06-28

as1cCET0g410010MjA0MDk1c3wwMTMxbHxTaW5jZ

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline
ILovemyDoc, Glad we made u laugh :star: . Hang in there! There is still plenty of time till 2nd week of May.

Gixbr, nice to c u again. How did u (or anyone else) manage to open the spreadsheet? I am not able to :unsure:

GS4EVER, I've been away I guess huh? Many of us after the interview now have some other things to worry about than waiting on NVC. hahaha. How is your prep for the interview?

For the spreadsheet, I just really clicked the link and it took me straight to the file. Maybe something with your browser?

:)

----------------------------------------------

Our Timeline:

(California Service Center)

I-129F and I-130

11/23/08 - I-130 sent

12/16/08 - I-129F sent

02/23/09 - NOA2 I-130

02/23/09 - NOA2 I-129F

CR1 Process on NVC:

03/03/09 - NVC received papers

03/05/09 - NVC number assigned

03/09/09 - NVC generated DS 3032 and AOS bill

03/10/09 - E-mailed and mailed DS 3032

03/13/09 - Paid for AOS bill

03/18/09 - Choice of agent accepted by e-mail

03/20/09 - Got e-mail with IV bill

03/20/09 - Paid for IV bill

03/25/09 - Sent the IV DS-230 packet by mail direct from beneficiary's country

03/28/09 - Sent the AOS packet by mail

04/01/09 - AOS packet delivered at NVC

04/08/09 - DS-230 Packet delivered at NVC ( I don't know why that long it was stuck at Customs for like 2 weeks!!!)

04/09/09 - AVR says it's missing the DS-230 (False RFE)

04/09/09 - AOS approved

04/10/09 - DS 230 entered into the system, probably under review now.

04/13/09 - AVR says "The NVC has received the checklist letter response on April 10th"

04/20/09 - Case Completed at NVC

04/24/09 - Got e-mail with the appointment letter

Consular Process

05/26/09 - Medical Exam

06/03/09 - Interview Date!!!! PASSED!!

06/06/09 - Received passport and the Big Brown Envelope

06/24/09 - POE

-----------------------------------------------

Link to comment
Share on other sites

Filed: K-3 Visa Country: Lebanon
Timeline
GS I just went on the link and its there.....What error message ur getting.

Th3mo can u pls add Pakistan and CR1 for me....

Thanks .....

BTW ,where is our Champi.......I wonder if she is out shopping for her new apartment or making arrangments for her bday :)

I am also wondering where Champi is :unsure: Champi come out come out whereever u are! :star:

HI all ,now all requested add done you can check it if still missing any thing feel free and let me know B)

Th3mo, I am finally able to see it. When I used to click on the link it used to ask me my google account for some reason but I just tried and it now started working...

Edited by GS4EVER

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Malta
Timeline
GS I just went on the link and its there.....What error message ur getting.

Th3mo can u pls add Pakistan and CR1 for me....

Thanks .....

BTW ,where is our Champi.......I wonder if she is out shopping for her new apartment or making arrangments for her bday :)

I am also wondering where Champi is :unsure: Champi come out come out whereever u are! :star:

HI all ,now all requested add done you can check it if still missing any thing feel free and let me know B)

Th3mo, help me! I am still not able to see it. When I click on the link it asks me my google account for some reason :crying: Did anyone else have the same issue?

I just clicked on it and it came up GS4ever..... didnt ask me for anything.... are you all ready for the interviews? :)

N400 sent : 2012-10-27

Check Cashed : 2012-11-05

Bio Appointment : 2012-11-23

Walk-In Biometrics : 2012-11-14

Interview Appointment : 2013-04-12

Approved : 2013-04-12

Oath Ceremony : 2013-06-28

as1cCET0g410010MjA0MDk1c3wwMTMxbHxTaW5jZ

Link to comment
Share on other sites

Filed: K-3 Visa Country: Lebanon
Timeline

Th3mo, my visa is now CR1 -our K3 was cancelled... I am finally able to see it. When I used to click on the link it used to ask me my google account for some reason but I just tried and it now started working...

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

Where can i check the status of our case? I still dont have the interview date yet.

CITIZENSHIP 06-19-2013 Sent N400 Application (Chicago Lockbox)


06-21-2013 USCIS received my N400 application


06-25-2013 USCIS mailed the NOA1


06-28-2013 USCIS mailed the Biometrics appt


07-01-2013 Received NOA1 and Biometrics appt letter


​07-15-2013 Biometrics Appt.


08-27-2013 Interview/Test passed


10-07-2013 Oath taking


IR-5 MOM AND DAD


02-20-2014 mailed I-130 for my parents


02-24-2014 USCIS received the I-130 docs


03-17-2014 USCIS approved the petition (took 15 days, weekdays only)


03-25-2014 USCIS shipped the approved case to NVC


04-02-2014 NVC received the papers (6 days from the approval date)


05-01-2014 Got the 2 case numbers. (21 days)


05-07-2014 Got an email & paid the AOS fee (4 days); DS-261(Choice of Agent) sent


05-09-2014 AOS status "PAID" (2 days from the date the was paid)


05-22-2014 AOS docs delivered in NVC


06-27-2014 RFE for I864 and I864A (i left the Place of residence blank, 26 days from the date they received the AOS)


06-28-2014 Mailed the corrected forms to NVC


06-30-2014 NVC received the AOS corrected forms


07-01-2014 Received IV Bill Invoice, paid.


07-02-2014 PAID status of the mother


07-07-2014 PAID status of the father


07-08-2014 Mailed the supporting docs


07-10-2014 Supporting docs arrived at NVC


07-11-2014 Submitted DS260 of mother


07-13-2014 Submitted DS260 of father


09-04-2014 Called NVC and the lady said CASE COMPLETE! (136 days total from the day they received the I-130)


09-11-2014 Received an email regarding the Interview (5 days from the day the case was completed)


09-15-2014 Status "In Transit" inCEAC


09-16-2014 Status "Ready" CEAC


10-03-2014 Interview/AP/USEM (no record of their medical,DAD needs to get an NBI explanation letter&new NBI clearance with his "aka"


10-8-2014 Mom called St Lukes and asked about the medical results, they said they submitted it already back in June


10-10-2014 Mom mailed the NBI Clearance of my dad


10-14-2014 NBI clearance delivered in USEM


10-06-2014 Visa Issued CEAC


10-09-2014 Got an email that my dad's visa was issued


10-14-2014 Visa delivered 11-29-2014 POE


12-08-2014 SS Card arrived

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Where can i check the status of our case? I still dont have the interview date yet.

Call NVC,first thing Monday morning........:)

Best of Luck :thumbs:

Mar 4,06 I-130 sent ,rcvd Mar 7,06

Oct 24,08 USC, called to Upgrade

Nov 1,08 Citizenship certificate sent

Jan 3,09 Case upgraded.

Jan 6,09 TOUCHED!!!

Feb 13,09 Approved : )

Feb 20,09 Case # assigned

Mar 2,09 bill paid online,DS-3032 emailed

Mar 4,09 NVC recvd fee

Mar 10,09 AOS sent

Mar 30,09 mailed DS-230

Apr 13,09 CASE COMPLETED(per operators)

Apr 20,09 FINAL REVIEW

Apr 21,09 CASE COMPLETED (per AVR)

Apr 23,09 called:INTERVIEW JUNE 24th

Jun 24,09 AP, 1-3 months

Calling DOS begins,here is what I was told

Jul 7,09 No info @ DOS

Jul 10,09 Case sent to DC-pending

Jul 17,09 Pending

Jul 24,09 Pending,you can call every day for update but the day they call him for passport it means something is up so you get to know it before we do

Jul 31,09 Pending AP

Aug 06,09 Call from USEM requesting to submit passport

Aug 07,09 Every thing looks very good,visa issuance is up to the consulate!!!

Aug 07,09 Passport submitted

Aug 07,09 USEM is requesting applicant's passport :)

Aug 17,09-call 1 Visa issued Aug 3rd,EM recvd passport on 10th but still havent returned it

Aug 17,09-call 2 Case pending some kind of processing (URGHHHHHHHHH NOT AGAIN)

Aug 18,09 call to pick up passport,picked up from AMEX

Sep 26,09 REUNION :)

Link to comment
Share on other sites

Filed: K-3 Visa Country: Lebanon
Timeline
ILovemyDoc, Glad we made u laugh :star: . Hang in there! There is still plenty of time till 2nd week of May.

Gixbr, nice to c u again. How did u (or anyone else) manage to open the spreadsheet? I am not able to :unsure:

GS4EVER, I've been away I guess huh? Many of us after the interview now have some other things to worry about than waiting on NVC. hahaha. How is your prep for the interview?

For the spreadsheet, I just really clicked the link and it took me straight to the file. Maybe something with your browser?

:)

Welcome back Gixbr :thumbs: My plan is to start working on the closets next weekend. So dreading that task since I have so much freakin' clothes...Poor hubby's shirts and pants will be all suffocating amongst mine :lol:

GS I just went on the link and its there.....What error message ur getting.

Th3mo can u pls add Pakistan and CR1 for me....

Thanks .....

BTW ,where is our Champi.......I wonder if she is out shopping for her new apartment or making arrangments for her bday :)

I am also wondering where Champi is :unsure: Champi come out come out whereever u are! :star:

HI all ,now all requested add done you can check it if still missing any thing feel free and let me know B)

Th3mo, help me! I am still not able to see it. When I click on the link it asks me my google account for some reason :crying: Did anyone else have the same issue?

I just clicked on it and it came up GS4ever..... didnt ask me for anything.... are you all ready for the interviews? :)

Thanks His Wifey. Maybe u scared the spreadsheet into opening :lol: It's now finally working. Not sure why I was getting that msg b4.

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

Filed: K-3 Visa Country: Lebanon
Timeline
hes stationed there vny..... will be moving though.... are you originally from there.... i love that place.... been there twice :) its a long flight for me though.... i have to get 3 plans of a whole 36 hours journey to get there... so this swine flu thing is not helping right now

Hey Wifey,

Will be glad to have you here. Hope your interview goes well and you will be here soon. Yup, been here all of my 29 years I've been alive. But you know what, seems like I've been 29 for the last 18 years. Oh well.......

And th3mo,

Mahalo for the update on the database. I'm sure it will be of help to those still waiting for their interviews. It really is painful waiting and waiting and waiting and not knowing what is going to happen next. This may give some people at least some hope. I know I really got a lot from this website, mostly from all of you guys and I can only hope that I can contribute in some small way.

Aloha everyone,

vny

Hugs to vny. I feel the same way :luv: I like our little group and the friendliness and support of everyone here :yes:

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...