We will have a busy 15 days in April, there are 7 interviews between the 14th and the 28th. There is 1 - IR-5, and 6 - IR-1/CR-1's.

Brian @ CFL, you are our leader, 4/14, you are in charge of re-con.

Lock @ CFL, 4/20 IR-5

Rod, "Gakuken" @ VJ 4/21, IR-1/CR-1

IVLP @ CFL, 4/21 IR-1

Trudger24 @ CFL, 4/22, CR-1

JBHYPNO @ CFL, 4/28, IR-1/CR-1

turbo2253 @ VJ, mikepellicore @ CFL, 4/28, IR-1 after K-3(8/8/2007)

It seems like the CR-1/IR-1 is growing in popularity, probably because the time difference is getting so small.

Good luck to all, maybe we could exchange some contact #'s for getting together or helping each other while we are in GUZ. We can also use CFL if you have internet access. Mike & Yizhen

married in Nanning 10/28/06 I-130 mailed 11/24/06 I-129F mailed 12/8/06

I-130 & I-129F both approved 3/1/07

I-824 sent 3/9/07 K-3 sent to GUZ 3/15/07

K-3 P-3 sent 5/30/07 P-3 ret'd 5/31/07 (P-3 rec'd by mail 6/7/07)

rec'd P-4 6/27/07 interview 8/8/07 (rec'd P-4 by mail 7/3/07)

Interview 8/8/07 "PINK" entered US 8/27/07

Rec'd approved I-824 & re-approved I-130 10/11/07

after 12.5 mo. DHS Ombudsman sends I-130 to NVC 10/30/08, and asks for case to be expedited

NVC rec'd 12/26/08, NVC to GUZ 1/5/09,

NVC sends email to GUZ requesting Expedite 1/9 or 1/14? DOS says "waiting for interview date" 2/9

INTERVIEW 4/28/2009 P-4 delivered to US in 6 days via FedEx 3/26/2009

4/28/2009 INTERVIEW PINK ! ! ! !

VISA PICK-UP 4/30/2009 9:50 AM

Enter IR-1 POE Chicago "ORD", SS Card 6/27/09, welcome letter 7/2/09

10 YEAR GREEN CARD 7/6/2009

Link to comment
Share on other sites

Filed: Citizen (apr) Country: China
Timeline
We will have a busy 15 days in April, there are 7 interviews between the 14th and the 28th. There is 1 - IR-5, and 6 - IR-1/CR-1's.

Brian @ CFL, you are our leader, 4/14, you are in charge of re-con.

Lock @ CFL, 4/20 IR-5

Rod, "Gakuken" @ VJ 4/21, IR-1/CR-1

IVLP @ CFL, 4/21 IR-1

Trudger24 @ CFL, 4/22, CR-1

JBHYPNO @ CFL, 4/28, IR-1/CR-1

turbo2253 @ VJ, mikepellicore @ CFL, 4/28, IR-1 after K-3(8/8/2007)

It seems like the CR-1/IR-1 is growing in popularity, probably because the time difference is getting so small.

Good luck to all, maybe we could exchange some contact #'s for getting together or helping each other while we are in GUZ. We can also use CFL if you have internet access. Mike & Yizhen

I wish all great success in this process and please tell the resr of us not far behind all you can I appreciate it!

USA NATURALIZATION CITIZEN :-------------------------------------------------------
08-13-2014 - N-400 mailed priority Phoenix lockbox
08-1x-2014 - N-400 package accepted

08-20-2014 - Check cashed

09-xx-2014 - NOA bio-metrics appointment

09-18-2014 - Bio-metrics appointment Columbus office

09-22-2014 - NOA letter scheduled interview 10-30-2014

10-30-2014 - Naturalization interview and test Columbus Ohio office.

Application changed to five year as mark reached while waiting for interview

Passed civic test and interview recommends approval !!!

10-30-2014 - NOA hand letter stating recommendation for approval and wait for letter of approval and oath
11-13-2014 - Case Status updated "We scheduled your oath ceremony"

11-14-2014 - NOA letter final interview and oath Tuesday 11-25-2014

11-25-2014 - Final red tape and oath ceremony Columbus, Ohio Officially a US Citizen!!!

- Applied US Passport at local post office

08-2016 - Received 10 year Q2 visa to visit China as a US citizen

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

good luck guys!! I'll be joining you too.. :dance: :dance: :dance:

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Link to comment
Share on other sites

  • 2 weeks later...
Filed: K-1 Visa Country: China
Timeline
good luck guys!! I'll be joining you too.. :dance::dance::dance:

I have a question if they are only doing 7 interviews in 2 weeks does that mean they only work every other day.

Is this the reason they are so slow at getting their job done? while all of our lives are on hold waiting on them.

in 2003 the embassy in moscow was doing 150 interviews a week for USA visas.

And you are saying china can only do 3 a week??????

Edited by OKIE2

You may be only one person in the world,

but you may be the whole world to one person

LIVED IN YUDU CHINA SINCE 5-5-2008

SENT 129F AUG 5 2008

NOA1 AUG 13TH 2008--8 DAYS

NOA2 MAR 20TH 2009--227 DAYS

RECEIVED P3 MAY18TH--286 DAYS

RETURNED P3 MAY 19TH--287 DAYS

RECEIVED P4 JULY 3 4:30 PM

JUST 351 DAYS TO GET INTERVIEW

INTERVIEW DATE JULY 30TH 7:30 AM

RECEIVED A BLUE GOT IT TAKEN CARE OF

NOW INTO A DNA TEST

R4ECEIVED VISAS 3-26-2010 FOR VISAS

POE SAN FRANSISCO APRIL 6TH 2010

HAVE BE IN THE SYSTEM FOR 1 YR 8 MO 16 DAYS

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline
I have a question if they are only doing 7 interviews in 2 weeks does that mean they only work every other day.

Is this the reason they are so slow at getting their job done? while all of our lives are on hold waiting on them.

in 2003 the embassy in moscow was doing 150 interviews a week for USA visas.

And you are saying china can only do 3 a week??????

No this is not the case at all, you need to remember that the vast majority of visa applicants/petitoners never join VJ and provide their timelines so there is no way of knowing how many people will actually be interviewed in any given week. The numbers provided are just based upon the timelines that fellow VJ & CFL members have given. From the accounts of other members who have already interviewed at GUZ, it seems that they have a full slate of interviews scheduled just about every weekday.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

We now have 9 members with interviews, 2 have already received PINK, and 1 is in AP. Wishing everyone PINK, Mike & Yizhen

married in Nanning 10/28/06 I-130 mailed 11/24/06 I-129F mailed 12/8/06

I-130 & I-129F both approved 3/1/07

I-824 sent 3/9/07 K-3 sent to GUZ 3/15/07

K-3 P-3 sent 5/30/07 P-3 ret'd 5/31/07 (P-3 rec'd by mail 6/7/07)

rec'd P-4 6/27/07 interview 8/8/07 (rec'd P-4 by mail 7/3/07)

Interview 8/8/07 "PINK" entered US 8/27/07

Rec'd approved I-824 & re-approved I-130 10/11/07

after 12.5 mo. DHS Ombudsman sends I-130 to NVC 10/30/08, and asks for case to be expedited

NVC rec'd 12/26/08, NVC to GUZ 1/5/09,

NVC sends email to GUZ requesting Expedite 1/9 or 1/14? DOS says "waiting for interview date" 2/9

INTERVIEW 4/28/2009 P-4 delivered to US in 6 days via FedEx 3/26/2009

4/28/2009 INTERVIEW PINK ! ! ! !

VISA PICK-UP 4/30/2009 9:50 AM

Enter IR-1 POE Chicago "ORD", SS Card 6/27/09, welcome letter 7/2/09

10 YEAR GREEN CARD 7/6/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

We now have completed 6 of the nine interviews, and one today 4/22.

5 PINK, and 1 PINK in AP ! ! ! ! ! !

We are expecting a Clean Sweep ! ! ! !

GOOD LUCK to ALL ! ! ! !, Mike & Yizhen

Edited by turbo2253

married in Nanning 10/28/06 I-130 mailed 11/24/06 I-129F mailed 12/8/06

I-130 & I-129F both approved 3/1/07

I-824 sent 3/9/07 K-3 sent to GUZ 3/15/07

K-3 P-3 sent 5/30/07 P-3 ret'd 5/31/07 (P-3 rec'd by mail 6/7/07)

rec'd P-4 6/27/07 interview 8/8/07 (rec'd P-4 by mail 7/3/07)

Interview 8/8/07 "PINK" entered US 8/27/07

Rec'd approved I-824 & re-approved I-130 10/11/07

after 12.5 mo. DHS Ombudsman sends I-130 to NVC 10/30/08, and asks for case to be expedited

NVC rec'd 12/26/08, NVC to GUZ 1/5/09,

NVC sends email to GUZ requesting Expedite 1/9 or 1/14? DOS says "waiting for interview date" 2/9

INTERVIEW 4/28/2009 P-4 delivered to US in 6 days via FedEx 3/26/2009

4/28/2009 INTERVIEW PINK ! ! ! !

VISA PICK-UP 4/30/2009 9:50 AM

Enter IR-1 POE Chicago "ORD", SS Card 6/27/09, welcome letter 7/2/09

10 YEAR GREEN CARD 7/6/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

CONGRATULATIONS ! ! ! ! ! ! Trudger24

7 down and 2 to go, Mike & Yizhen

married in Nanning 10/28/06 I-130 mailed 11/24/06 I-129F mailed 12/8/06

I-130 & I-129F both approved 3/1/07

I-824 sent 3/9/07 K-3 sent to GUZ 3/15/07

K-3 P-3 sent 5/30/07 P-3 ret'd 5/31/07 (P-3 rec'd by mail 6/7/07)

rec'd P-4 6/27/07 interview 8/8/07 (rec'd P-4 by mail 7/3/07)

Interview 8/8/07 "PINK" entered US 8/27/07

Rec'd approved I-824 & re-approved I-130 10/11/07

after 12.5 mo. DHS Ombudsman sends I-130 to NVC 10/30/08, and asks for case to be expedited

NVC rec'd 12/26/08, NVC to GUZ 1/5/09,

NVC sends email to GUZ requesting Expedite 1/9 or 1/14? DOS says "waiting for interview date" 2/9

INTERVIEW 4/28/2009 P-4 delivered to US in 6 days via FedEx 3/26/2009

4/28/2009 INTERVIEW PINK ! ! ! !

VISA PICK-UP 4/30/2009 9:50 AM

Enter IR-1 POE Chicago "ORD", SS Card 6/27/09, welcome letter 7/2/09

10 YEAR GREEN CARD 7/6/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

Yizhen got PINK !, she had to wait again, but this time she was done at 11:30 instead of 12:45. I have not heard about JBHypno, but we are 8 out of 9 so far! I sat in the coffee shop with 2 other gentlemen who also got pink, a K-3/K-4 and a K-1. Only saw a few blues and they looked like students or tourists. Thanks and Good Luck to all, Mike & Yizhen

married in Nanning 10/28/06 I-130 mailed 11/24/06 I-129F mailed 12/8/06

I-130 & I-129F both approved 3/1/07

I-824 sent 3/9/07 K-3 sent to GUZ 3/15/07

K-3 P-3 sent 5/30/07 P-3 ret'd 5/31/07 (P-3 rec'd by mail 6/7/07)

rec'd P-4 6/27/07 interview 8/8/07 (rec'd P-4 by mail 7/3/07)

Interview 8/8/07 "PINK" entered US 8/27/07

Rec'd approved I-824 & re-approved I-130 10/11/07

after 12.5 mo. DHS Ombudsman sends I-130 to NVC 10/30/08, and asks for case to be expedited

NVC rec'd 12/26/08, NVC to GUZ 1/5/09,

NVC sends email to GUZ requesting Expedite 1/9 or 1/14? DOS says "waiting for interview date" 2/9

INTERVIEW 4/28/2009 P-4 delivered to US in 6 days via FedEx 3/26/2009

4/28/2009 INTERVIEW PINK ! ! ! !

VISA PICK-UP 4/30/2009 9:50 AM

Enter IR-1 POE Chicago "ORD", SS Card 6/27/09, welcome letter 7/2/09

10 YEAR GREEN CARD 7/6/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline
Yizhen got PINK !, she had to wait again, but this time she was done at 11:30 instead of 12:45. I have not heard about JBHypno, but we are 8 out of 9 so far! I sat in the coffee shop with 2 other gentlemen who also got pink, a K-3/K-4 and a K-1. Only saw a few blues and they looked like students or tourists. Thanks and Good Luck to all, Mike & Yizhen

Congrats Mike!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

How did everyone get pink except for me? :crying: :crying:

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

No. JBHypno got a white, You just received a delayed pink, Mike & Yizhen

married in Nanning 10/28/06 I-130 mailed 11/24/06 I-129F mailed 12/8/06

I-130 & I-129F both approved 3/1/07

I-824 sent 3/9/07 K-3 sent to GUZ 3/15/07

K-3 P-3 sent 5/30/07 P-3 ret'd 5/31/07 (P-3 rec'd by mail 6/7/07)

rec'd P-4 6/27/07 interview 8/8/07 (rec'd P-4 by mail 7/3/07)

Interview 8/8/07 "PINK" entered US 8/27/07

Rec'd approved I-824 & re-approved I-130 10/11/07

after 12.5 mo. DHS Ombudsman sends I-130 to NVC 10/30/08, and asks for case to be expedited

NVC rec'd 12/26/08, NVC to GUZ 1/5/09,

NVC sends email to GUZ requesting Expedite 1/9 or 1/14? DOS says "waiting for interview date" 2/9

INTERVIEW 4/28/2009 P-4 delivered to US in 6 days via FedEx 3/26/2009

4/28/2009 INTERVIEW PINK ! ! ! !

VISA PICK-UP 4/30/2009 9:50 AM

Enter IR-1 POE Chicago "ORD", SS Card 6/27/09, welcome letter 7/2/09

10 YEAR GREEN CARD 7/6/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

are you sure? sometimes they turn to white.. I'm expecting to go back and live with her at the end of the year.. giving up, haha.. I continue to preach that, but I'm going to give in if nothing happens.. BUT, not before a big fight (another lawsuit up their butts soon.. lawyers told me to wait at least 3 months before slamming them again).. my wife said she saw someone get a pink, then it turned to blue on 001 forums?..

what happened to JBHypno's case?

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...