Filed: Other Country: Philippines
Timeline
After paying IV bills, once we get DS230 checklist by email, does that mean OR can we say I864 is approved/accepted?

Actually that's the other side of the track..if your DS3032 is accepted, they send you the IV bill. Once paid you can send the DS230. The first stage which was the AOS fee, upon payment you send the I-864. Once accepted/entered into their system then your done on this track. You just have to wait for the completion of review of your DS230 and you'll receive notice of case complete (according to those who were done already). After which they'll schedule the date & time of interview and also send your case to your embassy..You can schedule them for their medicals as well.

I-R5 at USCIS California Service Center

Consulate: Manila Philippines

5/19/09 Filed I-130 at Chicago Lockbox

5/22/09 USCIS rcvd I-130

6/01/09 Checks cashed

6/03/09 NOA1 rcvd for both parents

8/12/09 Email approval for Dad

8/17/09 Rcvd NOA2 for Dad

8/20/09 Rcvd RFE email for Mom

9/08/09 Email approval for Mom

9/12/09 Rcvd NOA2 for Mom

NVC

8/19/09 NVC rcvd dad's case

9/18/09 NVC rcvd mom's case

9/22/09 Emailed DS3032

9/28/09 Paid AOS/ I-864 fee of $70 for both

10/08/09 rcvd emails: DS3032 accepted

10/08/09 sent I-864

10/09/09 IV bill generated for both cases

10/10/09 Paid IV bill $800 for both

10/13/09 I-864 rcvd by NVC

10/15/09 DS230 mailed to NVC

10/16/09 I-864 accepted & entered into the system

10/19/09 DS230 rcvd by NVC

11/02/09 rcvd checklist emails

11/09/09 sent RFE to NVC via UPS

11/12/09 NVC received RFE

11/19/09 AVR: checklist response rcvd 11/18/09

11/28/09 Log-in failed for both

12/01/09 Case complete as of 11/30/09

12/14/09 rcvd emails of interview date

01/04-05/09 medical @ St.Lukes done

01/11/10 Interview @ USEmbassy Manila 6:30am

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

Probably Yes. In my case this is true.

After paying IV bills, once we get DS230 checklist by email, does that mean OR can we say I864 is approved/accepted?

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

I just checked AVR and it says "NVC has received the Checklist reponse on 10/29/09....." this means that the DS-230 is entered into their system right? As i received checklist email yesterday morning saying missing DS-230.....

Mooninlove, Domi22 and vveell did you check your AVR and any updates on your end as you also got checklist emails.

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Timeline
Probably Yes. In my case this is true.

After paying IV bills, once we get DS230 checklist by email, does that mean OR can we say I864 is approved/accepted?

Raj do we have anywhere to see sample of checklist, because once I will get email back with checklist I want to see if local police station will accept this and issue PCC.

08/27/2009: Sent I-130 for IR5

09/12/2009: Received NOA1

10/02/2009: Received NOA2

10/12/2009: DS3032 sent by email

10/22/2008: I864 sent

10/26/2009: DS3032 accepted

10/29/2009: IV bill generated got email and PAID

11/04/2009: Got checklist email for DS230

12/01/2009: (needed some time to collect documents so here it got some delayed) Sent DS230

12/04/2009: DS230 delivered

12/08/2009: DS230 Received Updated AVR

12/15/2009: Login failed

12/18/2009: Case completed as per AVR - no email yet for interview date

12/28/2009: Got Interview schedule email - Scheduled on 02/22/2010 (hoorrayyy)

01/25/2010: Medical Appointment

01/25/2010: Medical Done

02/22/2010: Interview Done - Visa issued.

05/20/2010: US Entry - Washington DC IAD.

06/10/2010: Received Welcome Notice from USCIS

06/28/2010: Received GC for Mom, still waiting for DAD

06/30/2010: Received GC for Dad

07/01/2010: applied for SSN

07/08/2010: Received SSN card in mail.

Good luck to all for your process, and congratulation who already received Visa.

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

It looks like this ( atleast the one i got )

MISSING DOCUMENT LIST FOR:

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

______CORRESPONDENCE INSTRUCTIONS:_________________________________

When responding to the National Visa Center, please include the bar code sheet that came with this

letter. Failure to include the bar code sheet may cause a delay in the processing of your case. The bar

code sheet should be placed on top of all documents being submitted for this case and mailed to the

address provided.

______IMMIGRANT VISA APPLICATION:__________________________________

The NVC has received the requested Affidavit of Support form (I-864) for this case. However, we are

still waiting for the Immigrant Visa Application (DS-230) and corresponding civil documents for each

traveling applicant to be returned to National Visa Center for review. You will find the DS-230 form

along with complete instructions for submitting the civil documentation required for this case at

www.ImmigrantVisas.state.gov under the Applicant Document Processing link.

We urge you to send in the DS-230 form(s) and required civil documentation for each traveling family

member in one package to the National Visa Center (NVC). Sending the information in separately may

cause delays in the processing of the case.

______FEE PAYMENT:_________________________________________________

The NVC has received the requested Affidavit of Support (I-864). However, we are still waiting for the

Immigrant Visa fee(s). Please submit the fee(s) according to the instructions on the IV fee bill sent to

you from NVC. DO NOT SEND FEE PAYMENTS TO THE NVC NEW HAMPSHIRE FACILITY.

THIS WILL DELAY PROCESSING OF THE VISA. If you have not received an IV fee bill, please

contact NVC. Do not pay the fees unless you have the accompanying IV fee bill as this will result in a

delay in processing your case.

Probably Yes. In my case this is true.

After paying IV bills, once we get DS230 checklist by email, does that mean OR can we say I864 is approved/accepted?

Raj do we have anywhere to see sample of checklist, because once I will get email back with checklist I want to see if local police station will accept this and issue PCC.

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Timeline
I just checked AVR and it says "NVC has received the Checklist reponse on 10/29/09....." this means that the DS-230 is entered into their system right? As i received checklist email yesterday morning saying missing DS-230.....

Mooninlove, Domi22 and vveell did you check your AVR and any updates on your end as you also got checklist emails.

right AVR system updated, but not accpted yet.

Link to comment
Share on other sites

Filed: Timeline
It looks like this ( atleast the one i got )

MISSING DOCUMENT LIST FOR:

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

______CORRESPONDENCE INSTRUCTIONS:_________________________________

When responding to the National Visa Center, please include the bar code sheet that came with this

letter. Failure to include the bar code sheet may cause a delay in the processing of your case. The bar

code sheet should be placed on top of all documents being submitted for this case and mailed to the

address provided.

______IMMIGRANT VISA APPLICATION:__________________________________

The NVC has received the requested Affidavit of Support form (I-864) for this case. However, we are

still waiting for the Immigrant Visa Application (DS-230) and corresponding civil documents for each

traveling applicant to be returned to National Visa Center for review. You will find the DS-230 form

along with complete instructions for submitting the civil documentation required for this case at

www.ImmigrantVisas.state.gov under the Applicant Document Processing link.

We urge you to send in the DS-230 form(s) and required civil documentation for each traveling family

member in one package to the National Visa Center (NVC). Sending the information in separately may

cause delays in the processing of the case.

______FEE PAYMENT:_________________________________________________

The NVC has received the requested Affidavit of Support (I-864). However, we are still waiting for the

Immigrant Visa fee(s). Please submit the fee(s) according to the instructions on the IV fee bill sent to

you from NVC. DO NOT SEND FEE PAYMENTS TO THE NVC NEW HAMPSHIRE FACILITY.

THIS WILL DELAY PROCESSING OF THE VISA. If you have not received an IV fee bill, please

contact NVC. Do not pay the fees unless you have the accompanying IV fee bill as this will result in a

delay in processing your case.

Probably Yes. In my case this is true.

After paying IV bills, once we get DS230 checklist by email, does that mean OR can we say I864 is approved/accepted?

Raj do we have anywhere to see sample of checklist, because once I will get email back with checklist I want to see if local police station will accept this and issue PCC.

Thanks Raj.

but are they sending checklist of civil documents needed by them just to show local police station that PCC is required for NVC for further processing and I applied for immigration VISA. etc.

Thanks

JS

Edited by smithjohnatpa

08/27/2009: Sent I-130 for IR5

09/12/2009: Received NOA1

10/02/2009: Received NOA2

10/12/2009: DS3032 sent by email

10/22/2008: I864 sent

10/26/2009: DS3032 accepted

10/29/2009: IV bill generated got email and PAID

11/04/2009: Got checklist email for DS230

12/01/2009: (needed some time to collect documents so here it got some delayed) Sent DS230

12/04/2009: DS230 delivered

12/08/2009: DS230 Received Updated AVR

12/15/2009: Login failed

12/18/2009: Case completed as per AVR - no email yet for interview date

12/28/2009: Got Interview schedule email - Scheduled on 02/22/2010 (hoorrayyy)

01/25/2010: Medical Appointment

01/25/2010: Medical Done

02/22/2010: Interview Done - Visa issued.

05/20/2010: US Entry - Washington DC IAD.

06/10/2010: Received Welcome Notice from USCIS

06/28/2010: Received GC for Mom, still waiting for DAD

06/30/2010: Received GC for Dad

07/01/2010: applied for SSN

07/08/2010: Received SSN card in mail.

Good luck to all for your process, and congratulation who already received Visa.

Link to comment
Share on other sites

Filed: IR-5 Country: Colombia
Timeline

Name............SC..........Sent.......NOA1........NOA2.......NVC.....Case Complete...Relative.....Interview

zoso420.........CSC........01/22/07...01/28/07...08/24/09...--/--/--...--/--/--......Husband........

Picaraz.........CSC........09/22/08...09/29/08...01/29/09...02/02/09...03/18/09......Both Parents...05/18/09

Gemma12nel......VSC........12/10/08...12/19/08...02/10/09...02/19/09...04/03/09......Mother.........05/16/09

reshari.........CSC........01/20/09...01/29/09...05/19/09...06/06/09...08/21/09......Father.........10/14/09

reshari.........CSC........01/20/09...02/02/09...05/19/09...06/06/09...08/21/09......Mother.........10/14/09

dcl766..........NSC........01/20/09...01/31/09...03/10/09...03/30/09...06/22/09......Both Parents...08/11/09

griffin.........CSC........01/22/09...02/02/09...04/22/09...05/06/09...06/05/09......Mother.........07/21/09

Nancy1980.......VSC........02/12/09...02/18/09...08/12/09...09/18/09...09/22/08......Both Parents...11/05/09

Shumayun........CSC........02/28/09...03/07/09...05/11/09...05/27/09...09/18/09......Both Parents...11/18/09

Tayrivers.......CSC........03/06/09...03/13/09...03/30/09...04/16/09...05/22/09......Both Parents...07/29/09

Syena...........CSC........03/12/09...03/20/09...05/11/09...05/27/09...07/24/09......Mother.........09/14/09

luckyyy.........CSC........03/23/09...04/14/09...07/31/09...08/12/09...09/18/09......Mother.........

lomeshp.........CSC........03/24/09...04/04/09...08/04/09...--/--/--...--/--/--......Both Parents...

Jandamy.........CSC........03/27/09...04/02/09...07/31/09...--/--/--...--/--/--......Mother.........

Gwapa...........CSC........03/28/09...04/02/09...08/28/09...--/--/--...--/--/--......Daughter.......

Gwapa...........CSC........03/28/09...04/02/09...--/--/--...--/--/--...--/--/--......Father.........

MyMother........CSC........04/01/09...04/07/09...08/14/09...08/25/09...--/--/--......Mother.........

sweetcitywife...CSC........04/01/09...04/14/09...--/--/--...--/--/--...--/--/--......Husband........

jepp19..........CSC........04/01/09...04/29/09...08/11/09...08/17/09...--/--/--......Step-Son.......

speedygonzales..CSC........04/07/09...04/09/09...09/16/09...09/30/09...--/--/--......Both Parents

bingtian........???........04/04/09...??/??/??...08/07/09...08/14/09...09/30/09......Both Parents....

cinthia717......csc........04/09/09...04/15/09...08/19/09...08/28/09...--/--/--......Father.........

mili09..........CSC........04/09/09...04/17/09...08/05/09...08/19/09...--/--/--......Mother.........

ptrober.........CSC........04/21/09...04/27/09...08/04/09...08/17/09...09/23/09......Both Parents...11/30/09

Richard-UK......CSC........04/24/09...04/30/09...08/10/09...08/17/09...10/16/09......Both Parents...12/01/09

Jmari...........CSC........05/03/09...05/11/09...09/18/09...10/01/09...--/--/--......Mother.........

mooninlove......CSC........05/19/09...06/03/09...08/12/09...08/19/09...--/--/--......Both Parents...

Domi22..........CSC........05/22/09...06/06/09...08/21/09...09/01/09...--/--/--......Both Parents...

Honey19.........VSC........06/01/09...06/13/09...09/10/09...09/25/09...--/--/--......Father.........

Export of Dhaka.???........06/16/09...06/18/09...08/27/09...09/08/09...10/16/09......??????......12/06/09

NocturnalBeat...CSC........06/28/09...07/02/09...09/09/09...09/18/09...10/23/09......Mother.........

Feliz...........CSC........06/30/09...07/06/09...08/29/09...09/14/09...10/21/09......Mother.........12/01/09

Pook............CSC........07/15/09...07/22/09...10/01/09...10/14/09...--/--/--......Daughter.......

rajthebam.......CSC........07/24/09...08/05/09...09/17/09...09/30/09...--/--/--......Both Parents...

vveell..........CSC........07/24/09...07/30/09...09/16/09...10/01/09...--/--/--......Mother.........

cmjl............CSC........07/26/09...08/07/09...09/16/09...09/29/09...--/--/--......Mother.........

Rukh............CSC........07/30/09...08/05/09...09/15/09...09/30/09...--/--/--......Both Parents...

vega1x1.........CSC........08/12/09...08/17/09...--/--/--...--/--/--...--/--/--......Mother.........

Chinababe.......CSC........08/10/09...08/18/09...--/--/--...--/--/--...--/--/--......Both Parents...

robotica97......CSC........08/07/09...08/15/09...09/22/09...10/07/09...--/--/--......Daughter...

mlybrand........CSC........08/21/09...08/28/09...09/30/09...10/14/09...--/--/--......Wife & Son.....

Raj456..........CSC........08/26/09...09/01/09...09/21/09...10/02/09...--/--/--......Both Parents...

ssalburo........CSC........08/26/09...09/02/09...09/17/09...09/30/09...--/--/--......Both Parents...

jazzy...........CSC........09/09/09...09/16/09...--/--/--...--/--/--...--/--/--......Mother.........

comembot0120....CSC........09/17/09...09/25/09...--/--/--...--/--/--...--/--/--......Mother.........

rhowin..........CSC........09/24/09...09/28/09...--/--/--...--/--/--...--/--/--......Both Parents...

Maryces21

Mother's Journey

12/30/11 Sent I-130 Petition to CSC

01/14/11 Received NOA 1 (Priority date 01/02/11)

02/14/11 Could see case online

05/04/11 Waiting.......I am pregnant and I wish my Mom could be here when baby is born

05/23/11 Received email. Case approved. Yeahhhhhh

05/26/11 Received NOA 2 in the mail.

--------------NVC stage-----------------

06/07/11 NVC received case.

06/08/11 Called to give emails and got IIN.

06/10/11 Sent DS3032 email and paid AOS fee. Received auto response 15 seconds later.

06/14/11 AOS Showed Paid. Sent AOS Package.

06/16/11 NVC Received and accepted DS3032. AOS Package was delivered to NVC.

06/17/11 Paid IV fee.

06/22/11 IV Showed Paid.

06/23/11 Sent DS-230 via Express Mail.

06/24/11 DS 230 was delivered by USPS.

06/28/11 AOS was accepted per AVR.

06/30/11 Received AOS check list. Missing DS-230. (It was sent 06/23/11)

07/07/11 Case Complete per AVR and operator. Waiting for interview date.

08/01/11 Per NVC Operator Interview date 09/28/11

09/26/11 Medical test. Passed!!!!

09/28/11 Interview date @ BGT embassy. Approved!!!!!!!

10/06/11 Visa arrived.

10/19/11 Arrived to USA. POE ORLANDO

11/14/11 Received Green Card

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

Thank You IT_1. Will keep fingers crossed....

I just checked AVR and it says "NVC has received the Checklist reponse on 10/29/09....." this means that the DS-230 is entered into their system right? As i received checklist email yesterday morning saying missing DS-230.....

Mooninlove, Domi22 and vveell did you check your AVR and any updates on your end as you also got checklist emails.

right AVR system updated, but not accpted yet.

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

smithjohnatpa, you can take the print out from the US Mumbai Consulate which lists the required documents for DS-230 and you can use I-130 approved notice and also you can send them the DS-230 Document Cover sheet for the proof that Police Certificate is required for DS-230 processing. It clearly states on US Consulate site ( Mumbai or Chennai)....I think i saw some one from this forum got PCC and they are also from Ahemadabad, Gujarat.....let me find who that is.................

Still if they dont issue then all you can do is you send DS-230 documents to NVC without PCC and if they issue RFE then you can show them that letter and can get PCC....atleast your application will in processing with NVC.....Sorry to say this...but i cannot think of anyother alternative......GURUS please answer Smithjohnatpa..question.....

Alright here is the one from Gujarat..replied to me through person email and it is... DHRUVRON can you answer smithjohnatpa for specific question he has since he is also from same place..............

"I am Indian but here sinces last couple years. I applied for my spouse he lives in a'bad Gujarat. Passport office dont give pcc untill he will get interview letter so we are just sending local pcc copy as original he needs to sumbit to get pcc from Passport office. I hate a'bad Passport office "

Good LUck!!!!!!!!

It looks like this ( atleast the one i got )

MISSING DOCUMENT LIST FOR:

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

______CORRESPONDENCE INSTRUCTIONS:_________________________________

When responding to the National Visa Center, please include the bar code sheet that came with this

letter. Failure to include the bar code sheet may cause a delay in the processing of your case. The bar

code sheet should be placed on top of all documents being submitted for this case and mailed to the

address provided.

______IMMIGRANT VISA APPLICATION:__________________________________

The NVC has received the requested Affidavit of Support form (I-864) for this case. However, we are

still waiting for the Immigrant Visa Application (DS-230) and corresponding civil documents for each

traveling applicant to be returned to National Visa Center for review. You will find the DS-230 form

along with complete instructions for submitting the civil documentation required for this case at

www.ImmigrantVisas.state.gov under the Applicant Document Processing link.

We urge you to send in the DS-230 form(s) and required civil documentation for each traveling family

member in one package to the National Visa Center (NVC). Sending the information in separately may

cause delays in the processing of the case.

______FEE PAYMENT:_________________________________________________

The NVC has received the requested Affidavit of Support (I-864). However, we are still waiting for the

Immigrant Visa fee(s). Please submit the fee(s) according to the instructions on the IV fee bill sent to

you from NVC. DO NOT SEND FEE PAYMENTS TO THE NVC NEW HAMPSHIRE FACILITY.

THIS WILL DELAY PROCESSING OF THE VISA. If you have not received an IV fee bill, please

contact NVC. Do not pay the fees unless you have the accompanying IV fee bill as this will result in a

delay in processing your case.

Probably Yes. In my case this is true.

After paying IV bills, once we get DS230 checklist by email, does that mean OR can we say I864 is approved/accepted?

Raj do we have anywhere to see sample of checklist, because once I will get email back with checklist I want to see if local police station will accept this and issue PCC.

Thanks Raj.

but are they sending checklist of civil documents needed by them just to show local police station that PCC is required for NVC for further processing and I applied for immigration VISA. etc.

Thanks

JS

Edited by Raj456

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: AOS (apr) Country: Albania
Timeline
hi im new here but i found very helful help here. my parents's case was complete on 10/22/09 so for how many days nvc will schedule the interview (any guess) ... according to people withe same case. wish u all good look

anybodyyyyyyyyyyyyy

????????

F-2A Visa

Priority date feb 16.2010

Event Date

Service Center : California Service Center

Consulate : Tirana, Albania

Marriage (if applicable):

I-130 Sent : 2010-02-02

I-130 NOA1 : 2010-02-16

I-130 Approved : 2010-09-15

NVC Received : 2010-09-30

Received DS-3032 / I-864 Bill : 2010-10-01

Pay I-864 Bill 2010-10-01

Receive IV Bill : 2010-10-20

Pay IV Bill : 2010-10-15

Case Completed at NVC :2010-12-9

Failed to sign at NVC web :2010-12-21

Interview 08/02/2012

RFE DNA/ did the DNA test req 8/2/2012

8/3/12 Collection kit was mailed in Tirana embassy (for my brother)

8/13/12 my brother was called at the embbasy. and the kit was mailed out to DNA center in California.

9/7/12 The results mailed out to Tirana Embassy

9/14/12 embassy called my brother to mail his passport to get his visa.

DNA journey lasted 6 weeks

Link to comment
Share on other sites

Name............SC..........Sent.......NOA1........NOA2.......NVC.....Case Complete...Relative.....Interview

zoso420.........CSC........01/22/07...01/28/07...08/24/09...--/--/--...--/--/--......Husband........

Picaraz.........CSC........09/22/08...09/29/08...01/29/09...02/02/09...03/18/09......Both Parents...05/18/09

Gemma12nel......VSC........12/10/08...12/19/08...02/10/09...02/19/09...04/03/09......Mother.........05/16/09

reshari.........CSC........01/20/09...01/29/09...05/19/09...06/06/09...08/21/09......Father.........10/14/09

reshari.........CSC........01/20/09...02/02/09...05/19/09...06/06/09...08/21/09......Mother.........10/14/09

dcl766..........NSC........01/20/09...01/31/09...03/10/09...03/30/09...06/22/09......Both Parents...08/11/09

griffin.........CSC........01/22/09...02/02/09...04/22/09...05/06/09...06/05/09......Mother.........07/21/09

Nancy1980.......VSC........02/12/09...02/18/09...08/12/09...09/18/09...09/22/08......Both Parents...11/05/09

Shumayun........CSC........02/28/09...03/07/09...05/11/09...05/27/09...09/18/09......Both Parents...11/18/09

Tayrivers.......CSC........03/06/09...03/13/09...03/30/09...04/16/09...05/22/09......Both Parents...07/29/09

Syena...........CSC........03/12/09...03/20/09...05/11/09...05/27/09...07/24/09......Mother.........09/14/09

luckyyy.........CSC........03/23/09...04/14/09...07/31/09...08/12/09...09/18/09......Mother.........

lomeshp.........CSC........03/24/09...04/04/09...08/04/09...--/--/--...--/--/--......Both Parents...

Jandamy.........CSC........03/27/09...04/02/09...07/31/09...--/--/--...--/--/--......Mother.........

Gwapa...........CSC........03/28/09...04/02/09...08/28/09...--/--/--...--/--/--......Daughter.......

Gwapa...........CSC........03/28/09...04/02/09...--/--/--...--/--/--...--/--/--......Father.........

MyMother........CSC........04/01/09...04/07/09...08/14/09...08/25/09...--/--/--......Mother.........

sweetcitywife...CSC........04/01/09...04/14/09...--/--/--...--/--/--...--/--/--......Husband........

jepp19..........CSC........04/01/09...04/29/09...08/11/09...08/17/09...--/--/--......Step-Son.......

speedygonzales..CSC........04/07/09...04/09/09...09/16/09...09/30/09...--/--/--......Both Parents

bingtian........???........04/04/09...??/??/??...08/07/09...08/14/09...09/30/09......Both Parents....

cinthia717......csc........04/09/09...04/15/09...08/19/09...08/28/09...--/--/--......Father.........

mili09..........CSC........04/09/09...04/17/09...08/05/09...08/19/09...--/--/--......Mother.........

ptrober.........CSC........04/21/09...04/27/09...08/04/09...08/17/09...09/23/09......Both Parents...11/30/09

Richard-UK......CSC........04/24/09...04/30/09...08/10/09...08/17/09...10/16/09......Both Parents...12/01/09

Jmari...........CSC........05/03/09...05/11/09...09/18/09...10/01/09...--/--/--......Mother.........

mooninlove......CSC........05/19/09...06/03/09...08/12/09...08/19/09...--/--/--......Both Parents...

Domi22..........CSC........05/22/09...06/06/09...08/21/09...09/01/09...--/--/--......Both Parents...

Honey19.........VSC........06/01/09...06/13/09...09/10/09...09/25/09...--/--/--......Father.........

Export of Dhaka.???........06/16/09...06/18/09...08/27/09...09/08/09...10/16/09......??????......12/06/09

NocturnalBeat...CSC........06/28/09...07/02/09...09/09/09...09/18/09...10/23/09......Mother.........12/02/09

Feliz...........CSC........06/30/09...07/06/09...08/29/09...09/14/09...10/21/09......Mother.........12/01/09

Pook............CSC........07/15/09...07/22/09...10/01/09...10/14/09...--/--/--......Daughter.......

rajthebam.......CSC........07/24/09...08/05/09...09/17/09...09/30/09...--/--/--......Both Parents...

vveell..........CSC........07/24/09...07/30/09...09/16/09...10/01/09...--/--/--......Mother.........

cmjl............CSC........07/26/09...08/07/09...09/16/09...09/29/09...--/--/--......Mother.........

Rukh............CSC........07/30/09...08/05/09...09/15/09...09/30/09...--/--/--......Both Parents...

vega1x1.........CSC........08/12/09...08/17/09...--/--/--...--/--/--...--/--/--......Mother.........

Chinababe.......CSC........08/10/09...08/18/09...--/--/--...--/--/--...--/--/--......Both Parents...

robotica97......CSC........08/07/09...08/15/09...09/22/09...10/07/09...--/--/--......Daughter...

mlybrand........CSC........08/21/09...08/28/09...09/30/09...10/14/09...--/--/--......Wife & Son.....

Raj456..........CSC........08/26/09...09/01/09...09/21/09...10/02/09...--/--/--......Both Parents...

ssalburo........CSC........08/26/09...09/02/09...09/17/09...09/30/09...--/--/--......Both Parents...

jazzy...........CSC........09/09/09...09/16/09...--/--/--...--/--/--...--/--/--......Mother.........

comembot0120....CSC........09/17/09...09/25/09...--/--/--...--/--/--...--/--/--......Mother.........

rhowin..........CSC........09/24/09...09/28/09...--/--/--...--/--/--...--/--/--......Both Parents...

Link to comment
Share on other sites

Filed: Other Country: Russia
Timeline
hi im new here but i found very helful help here. my parents's case was complete on 10/22/09 so for how many days nvc will schedule the interview (any guess) ... according to people withe same case. wish u all good look

anybodyyyyyyyyyyyyy

????????

It looks like you are going to receive the interview date next week.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...