Jump to content
TayRivers

I-130 Progress list

 Share

2,626 posts in this topic

Recommended Posts

Filed: Other Country: Philippines
Timeline
thanks, moninlove. i had got the same email like the begining of last week. i am just wordering if they are working on the case, by that i meant i should get the approval soon. how long did you get your approval after they received the RFE?

I just checked usics website, it says "On October 13, 2009, we received your response to our request for evidence......." however, i haven't hear anything from them yet. does anybody know how long does it take uscis to process the RFE?

Mine was 5 days. they sent me an email that they've received the RFE and that they continue processing my mom's case.. I am still awaiting for the DS230 review until now..

5 days upon their receipt but it depends on each cases. Mine was for my mom's first name slightly different from my BC. It was touched once and received the email approval on the 5th day.

@ Feliz: Congratulations!!!! still waiting here for case complete. were you notified via email for the I-864 & DS230 complete review?

I-R5 at USCIS California Service Center

Consulate: Manila Philippines

5/19/09 Filed I-130 at Chicago Lockbox

5/22/09 USCIS rcvd I-130

6/01/09 Checks cashed

6/03/09 NOA1 rcvd for both parents

8/12/09 Email approval for Dad

8/17/09 Rcvd NOA2 for Dad

8/20/09 Rcvd RFE email for Mom

9/08/09 Email approval for Mom

9/12/09 Rcvd NOA2 for Mom

NVC

8/19/09 NVC rcvd dad's case

9/18/09 NVC rcvd mom's case

9/22/09 Emailed DS3032

9/28/09 Paid AOS/ I-864 fee of $70 for both

10/08/09 rcvd emails: DS3032 accepted

10/08/09 sent I-864

10/09/09 IV bill generated for both cases

10/10/09 Paid IV bill $800 for both

10/13/09 I-864 rcvd by NVC

10/15/09 DS230 mailed to NVC

10/16/09 I-864 accepted & entered into the system

10/19/09 DS230 rcvd by NVC

11/02/09 rcvd checklist emails

11/09/09 sent RFE to NVC via UPS

11/12/09 NVC received RFE

11/19/09 AVR: checklist response rcvd 11/18/09

11/28/09 Log-in failed for both

12/01/09 Case complete as of 11/30/09

12/14/09 rcvd emails of interview date

01/04-05/09 medical @ St.Lukes done

01/11/10 Interview @ USEmbassy Manila 6:30am

Link to comment
Share on other sites

Thank you guys! :star:

@ Feliz: Congratulations!!!! still waiting here for case complete. were you notified via email for the I-864 & DS230 complete review?

Thanks :-) No emails about case complete yet. first my payment website log in failed at 10 pm on Oct 20,

then i called 4 times yesterday - Oct 21 - at 9 am, 3 pm, 6 pm - same old message, and at 10 pm - it was "Case complete Oct 21".

I guess they email only when interview is scheduled, which happens (according to ptrober's experience) about 4 business days after case complete.

also my experience confirms that both website and AVR update around 10 pm, as to e-mails they tend to come around 9 am- 3 pm

My PAST Timelines:

10/2004 - Conditional GC

08/2006 - 10/2007 - Lifting Conditions timeline

10/2007 - 6/26/2009 Citizenship, Los Angeles DO timeline

auBam7.png

CSC i-130 for my Mom

06/30/09 - delivered

07/06/09 - NOA date (rec'd - 07/10) #WAC 09xxx3, touched.

07/08/09 - check cashed, #WAC 09xxx2 (not online)

08/29/09 - APPROVED!!!

NVC

09/14/09 - NVC case # assigned, emails registered

09/17/09 - email AOS bill received and paid online, ds3032 received and returned

09/21/09 - AOS bill status "PAID", FedExed out AOS, 09/24/09 delivered to NVC

09/28/09 - AVR:AOS acknowledged

10/02/09 - 3032 was acknol. by NVC, paid IV Bill online

10/05/09 - emails: 1 pm -RFE for 3032, 3 pm - IV bill, 5 pm - status PAID

10/09/09 - ds230 delivered to NVC at 9am

10/14/09 - AVR: Checklist response was received

10/20/09 - login failed! - between 5 pm and 9 pm PST, at 5 pm it was still working

10/21/09 - case complete! (AVR updated after 10 pm) = total NVC 37 days

10/28/09 - interview date email came at 6.30 pm, no AVR changes yet

10/30/09 - AVR: "Case sent to embassy on Oct 29" = total 4 months from delivery of i130 to USCIS

11/02/09 - Medical

11/20/09 - Interview - PASSED!!!

11/28 - POE: LAX

Link to comment
Share on other sites

Filed: Timeline

I have sent email for DS3032 on 10/12 and then I got email for AOS and I paid it and also sent I 864 which delivered this Monday(10/19). but nothing since from NVC about DS3032 acceptance. I also sent scanned copy and email printout as well.which is delivered on last friday 10/16. and AVS is saying they got AOS bill fees on 10/16. Should I wait for DS3032 acceptance email or speak with operator about it.

any suggestions?

Thanks in advance.

08/27/2009: Sent I-130 for IR5

09/12/2009: Received NOA1

10/02/2009: Received NOA2

10/12/2009: DS3032 sent by email

10/22/2008: I864 sent

10/26/2009: DS3032 accepted

10/29/2009: IV bill generated got email and PAID

11/04/2009: Got checklist email for DS230

12/01/2009: (needed some time to collect documents so here it got some delayed) Sent DS230

12/04/2009: DS230 delivered

12/08/2009: DS230 Received Updated AVR

12/15/2009: Login failed

12/18/2009: Case completed as per AVR - no email yet for interview date

12/28/2009: Got Interview schedule email - Scheduled on 02/22/2010 (hoorrayyy)

01/25/2010: Medical Appointment

01/25/2010: Medical Done

02/22/2010: Interview Done - Visa issued.

05/20/2010: US Entry - Washington DC IAD.

06/10/2010: Received Welcome Notice from USCIS

06/28/2010: Received GC for Mom, still waiting for DAD

06/30/2010: Received GC for Dad

07/01/2010: applied for SSN

07/08/2010: Received SSN card in mail.

Good luck to all for your process, and congratulation who already received Visa.

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

I have a question on DS-230 ( Signature of the Applicant box ).

My parents signed and sent the DS-230 forms but instead of signing on the box provided for the signature on page 2 they did right above where it says "signature of the applicant". Do you guys think that will pose a problem? I should have told them to sign on the box and in India they are used to sign right above "signature".

I paid the IV fee bill on 10/20/09 and the amount is withdrawn from my bank today and expecting the status to change sometime today or tomorrow and i am ready with the sets to be mailed to NVC.

Please let me know.

Thanks in advance, Raj

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

I called NVC and talked to an operator about the signature and she said that she knows about this issue and said that shouldnt be a issue. But you never know..it all depends upon the person reveiwing the file. I will ask my parents to sign and send it to me again..just in case if NVC comes back and asks me about the signatures....

Let me know if anyone faces similar situation.....

I have a question on DS-230 ( Signature of the Applicant box ).

My parents signed and sent the DS-230 forms but instead of signing on the box provided for the signature on page 2 they did right above where it says "signature of the applicant". Do you guys think that will pose a problem? I should have told them to sign on the box and in India they are used to sign right above "signature".

I paid the IV fee bill on 10/20/09 and the amount is withdrawn from my bank today and expecting the status to change sometime today or tomorrow and i am ready with the sets to be mailed to NVC.

Please let me know.

Thanks in advance, Raj

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

Once DS3032 is accepted they will send you an IV Fee Bill Email. On mine AVR said DS3032 is received on 10/16/09 and on 10/19/09 IV Fee Bill was enabled online and got an email 10/20/09 at 7:20 PM CST about IV Fee Bill.

You can call and talk to the operator to get more information.

I have sent email for DS3032 on 10/12 and then I got email for AOS and I paid it and also sent I 864 which delivered this Monday(10/19). but nothing since from NVC about DS3032 acceptance. I also sent scanned copy and email printout as well.which is delivered on last friday 10/16. and AVS is saying they got AOS bill fees on 10/16. Should I wait for DS3032 acceptance email or speak with operator about it.

any suggestions?

Thanks in advance.

Edited by Raj456

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Timeline
Once DS3032 is accepted they will send you an IV Fee Bill Email. On mine AVR said DS3032 is received on 10/16/09 and on 10/19/09 IV Fee Bill was enabled online and got an email 10/20/09 at 7:20 PM CST about IV Fee Bill.

You can call and talk to the operator to get more information.

I have sent email for DS3032 on 10/12 and then I got email for AOS and I paid it and also sent I 864 which delivered this Monday(10/19). but nothing since from NVC about DS3032 acceptance. I also sent scanned copy and email printout as well.which is delivered on last friday 10/16. and AVS is saying they got AOS bill fees on 10/16. Should I wait for DS3032 acceptance email or speak with operator about it.

any suggestions?

Thanks in advance.

OK I will do that. Thanks.

08/27/2009: Sent I-130 for IR5

09/12/2009: Received NOA1

10/02/2009: Received NOA2

10/12/2009: DS3032 sent by email

10/22/2008: I864 sent

10/26/2009: DS3032 accepted

10/29/2009: IV bill generated got email and PAID

11/04/2009: Got checklist email for DS230

12/01/2009: (needed some time to collect documents so here it got some delayed) Sent DS230

12/04/2009: DS230 delivered

12/08/2009: DS230 Received Updated AVR

12/15/2009: Login failed

12/18/2009: Case completed as per AVR - no email yet for interview date

12/28/2009: Got Interview schedule email - Scheduled on 02/22/2010 (hoorrayyy)

01/25/2010: Medical Appointment

01/25/2010: Medical Done

02/22/2010: Interview Done - Visa issued.

05/20/2010: US Entry - Washington DC IAD.

06/10/2010: Received Welcome Notice from USCIS

06/28/2010: Received GC for Mom, still waiting for DAD

06/30/2010: Received GC for Dad

07/01/2010: applied for SSN

07/08/2010: Received SSN card in mail.

Good luck to all for your process, and congratulation who already received Visa.

Link to comment
Share on other sites

Filed: Other Country: Philippines
Timeline

Any September filers that already received NOA 2 (Approval) yet????

Congratulations to Feliz and MooninLove :)

I think your parents can start processing their medical at Saint Lukes once

case has been completed. They just need to bring a copy of the NOA 2 and

their case number.

I-130 TIMELINE for MOM

California Service Center

District Office: San Jose, CA

Consular: Manila, Philippines

09/17/09- Sent I-130 package to Chicago (via FedEx)

09/18/09- Chicago Received my I-130 package

09/22/09- Notice of Action Date

09/23/09- Check cashed

09/25/09- Received NOA1

01/20/10- Received NOA2 (Approval)

NVC

01/26/10- Case # issued MNLXXXXXXXX and registered email addresses

01/28/10- Rcv'd DS-3032 packet (email)

01/28/10- Paid AOS $70.00

01/29/10- Sent DS-3032 Choice of Agent (FEDEX) and EMAIL

01/29/10- AOS-Paid; (I printed the barcode for I-864)

02/01/10- NVC Rcv'd DS-3032

02/02/10- Sent I-864 via FEDEX

02/03/10- NVC Rcv'd I-864 (Signed by: K. St Laurent)

02/03/10- DS-3032 entered in the system

02/09/10- IV Bill Generated

02/09/10- I paid IV Bill--- In Process

02/10/10- IV Bill Status changed to PAID

02/11/10- Gathering all the documents; waiting for my mom to send me all the docs

02/12/10- AVR documents incomplete

02/19/10- Sent DS-230 via FEDEX

02/22/10- NVC received DS 230 signed by: P.Conley

02/25/10- AVR Changed to received DS-230 documents

03/04/10- AVR Missing document (Photograph---they lost it!)

03/08/10- Sent missing photograph (2 pcs. 2x2) via FEDEX

03/09/10- NVC received missing photo; Signed by: J DESMOND

03/16/10- AVR: Received missing documents it would take 6-8 weeks something.. something...

03/23/10- Log In failed.... Yay!

03/23/10- CASE COMPLETE....

05/12/10- INTERVIEW @ 8:30 A.M. (US EMBASSY-Manila) PASSED!!!!

05/20/10- POE SAN FRANCISCO @ 8:00 PM (ETA) PST

Link to comment
Share on other sites

Filed: Other Country: United Kingdom
Timeline
Any September filers that already received NOA 2 (Approval) yet????

Congratulations to Feliz and MooninLove :)

I think your parents can start processing their medical at Saint Lukes once

case has been completed. They just need to bring a copy of the NOA 2 and

their case number.

Not sure about that. I have been told that you cannot process the medical until the case is completed AND an interview date has been assigned.

I may be wrong, but that was the information I was given.

IR-5 FOR BOTH PARENTS

04/23/09 : I-130 Sent

04/30/09 : I-130 NOA1 Received

08/10/09 : I-130 Approved

08/14/09 : I-130 NOA2 Received

08/17/09 : NVC Case Numbers issued

08/17/09 : Called NVC and registered email addresses against Case Number

08/20/09 : Received DS-3032 & I-864 Bill

08/20/09 : Paid I-864 Bill

08/21/09 : Returned Completed DS-3032 Forms (by email)

08/23/09 : Receive I-864 Package

08/24/09 : Return Completed I-864

08/26/09 : I-864 Acknowledged at NVC

09/03/09 : Receive IV Bill

09/03/09 : Paid IV Bill

09/03/09 : DS-3032 Accepted

09/04/09 : IV Bill shown as PAID

09/04/09 : Returned Completed DS-230 package

09/08/09 : DS-230 Received NVC

09/17/09 : RFE (Military Record of Service & German Police Check)

10/02/09 : RFE Documents sent by DHL to NVC

10/07/09 : Documents arrive at NVC

10/16/09 : Case Complete NVC

10/26/09 : Received email notification of case complete

10/29/09 : Notification of interview date by email

10/30/09 : Medicals Booked

11/17/09 : Medical in London (Richard)

11/19/09 : Medical in London (My wife)

12/01/09 : Interview in London

12/01/09 : Required documents faxed to embassy

12/09/09 : Required documents faxed again to embassy

12/09/09 : Hard copies of documents mailed to embassy

12/17/09 : Visa received by courier

12/18/09 : US ENTRY ORLANDO!

Link to comment
Share on other sites

Filed: Other Country: United Kingdom
Timeline
Any September filers that already received NOA 2 (Approval) yet????

Congratulations to Feliz and MooninLove :)

I think your parents can start processing their medical at Saint Lukes once

case has been completed. They just need to bring a copy of the NOA 2 and

their case number.

Not sure about that. I have been told that you cannot process the medical until the case is completed AND an interview date has been assigned.

I may be wrong, but that was the information I was given.

Richard, My parents had their medicals done before they got their interview date, It was no problem, we called the number given on the UK Embassy site and asked if we could make the appointments before we had a interview date, the people at the medical place said no problem as long as the case was complete.

They had their medicals done on June 1st and we did not get their interview date until 10 days after their medicals were done.

Edited by TayRivers
Link to comment
Share on other sites

Filed: Other Country: United Kingdom
Timeline
Any September filers that already received NOA 2 (Approval) yet????

Congratulations to Feliz and MooninLove :)

I think your parents can start processing their medical at Saint Lukes once

case has been completed. They just need to bring a copy of the NOA 2 and

their case number.

Not sure about that. I have been told that you cannot process the medical until the case is completed AND an interview date has been assigned.

I may be wrong, but that was the information I was given.

Richard, My parents had their medicals done before they got their interview date, It was no problem, we called the number given on the UK Embassy site and asked if we could make the appointments before we had a interview date, the people at the medical place said no problem as long as the case was complete.

They had their medicals done on June 1st and we did not get their interview date until 10 days after their medicals were done.

Honestly Tay the stuff that the US Embassy churn out is so wrong. That is the third piece of bad information I have had from London.

I will call the medical people later.

Oh our case complete of the 16th Oct has suddenly turned into the 21st Oct...!

Apparently some documents I sent weeks ago by DHL just arrived and was entered on the system.

The agent assured me that is should not make much difference to the issuing of an interview date. We shall see.

It's like they are messing with my head!

Have a great day everyone

Richard

IR-5 FOR BOTH PARENTS

04/23/09 : I-130 Sent

04/30/09 : I-130 NOA1 Received

08/10/09 : I-130 Approved

08/14/09 : I-130 NOA2 Received

08/17/09 : NVC Case Numbers issued

08/17/09 : Called NVC and registered email addresses against Case Number

08/20/09 : Received DS-3032 & I-864 Bill

08/20/09 : Paid I-864 Bill

08/21/09 : Returned Completed DS-3032 Forms (by email)

08/23/09 : Receive I-864 Package

08/24/09 : Return Completed I-864

08/26/09 : I-864 Acknowledged at NVC

09/03/09 : Receive IV Bill

09/03/09 : Paid IV Bill

09/03/09 : DS-3032 Accepted

09/04/09 : IV Bill shown as PAID

09/04/09 : Returned Completed DS-230 package

09/08/09 : DS-230 Received NVC

09/17/09 : RFE (Military Record of Service & German Police Check)

10/02/09 : RFE Documents sent by DHL to NVC

10/07/09 : Documents arrive at NVC

10/16/09 : Case Complete NVC

10/26/09 : Received email notification of case complete

10/29/09 : Notification of interview date by email

10/30/09 : Medicals Booked

11/17/09 : Medical in London (Richard)

11/19/09 : Medical in London (My wife)

12/01/09 : Interview in London

12/01/09 : Required documents faxed to embassy

12/09/09 : Required documents faxed again to embassy

12/09/09 : Hard copies of documents mailed to embassy

12/17/09 : Visa received by courier

12/18/09 : US ENTRY ORLANDO!

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

DS-230 status changed to "PAID" sometime last evening after 6:00 PM and i will be mailing(Fedex) all the documents today to NVC and will post all the updates as soon as i get one.

Thanks, Raj.

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Timeline
DS-230 status changed to "PAID" sometime last evening after 6:00 PM and i will be mailing(Fedex) all the documents today to NVC and will post all the updates as soon as i get one.

Thanks, Raj.

congrats Raj. I am still waiting for my DS3032 acceptance.

08/27/2009: Sent I-130 for IR5

09/12/2009: Received NOA1

10/02/2009: Received NOA2

10/12/2009: DS3032 sent by email

10/22/2008: I864 sent

10/26/2009: DS3032 accepted

10/29/2009: IV bill generated got email and PAID

11/04/2009: Got checklist email for DS230

12/01/2009: (needed some time to collect documents so here it got some delayed) Sent DS230

12/04/2009: DS230 delivered

12/08/2009: DS230 Received Updated AVR

12/15/2009: Login failed

12/18/2009: Case completed as per AVR - no email yet for interview date

12/28/2009: Got Interview schedule email - Scheduled on 02/22/2010 (hoorrayyy)

01/25/2010: Medical Appointment

01/25/2010: Medical Done

02/22/2010: Interview Done - Visa issued.

05/20/2010: US Entry - Washington DC IAD.

06/10/2010: Received Welcome Notice from USCIS

06/28/2010: Received GC for Mom, still waiting for DAD

06/30/2010: Received GC for Dad

07/01/2010: applied for SSN

07/08/2010: Received SSN card in mail.

Good luck to all for your process, and congratulation who already received Visa.

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

Thanks smithjohnatpa. I mailed them this afternoon and should be at NVC by Monday morning.

DS-230 status changed to "PAID" sometime last evening after 6:00 PM and i will be mailing(Fedex) all the documents today to NVC and will post all the updates as soon as i get one.

Thanks, Raj.

congrats Raj. I am still waiting for my DS3032 acceptance.

Thanks,

Raj

Consulate: Chennai, INDIA

08/26/09: I-130 Mailed(Fedex) to Chicago Lockbox for Parents

08/27/09: Received by USCIS

09/01/09: ND for both parents

09/02/09: Both Checks Cashed ($355 each)

09/21/09: I-130 approved ( LUD on USCIS online )

09/29/09: Received I-130 approved notices (NOA2)

NVC:

10/02/09: NVC Case #s assigned to both parents and emails regd.

10/06/09: Rcvd. emails for DS-3032 and AOS Fee ( Paid AOS Fee same night)

10/07/09: Emailed DS-3032 ( Did mail too via Fedex )

10/08/09: DS-3032 received by NVC

10/08/09: AOS Fee Status "PAID"

10/09/09: I-864 Affidavit of Support mailed via FEDEX

10/16/09: DS-3032 Entered in NVC System

10/19/09: IV Fee Bill Generated

10/20/09: Rcvd IV Fee Bill Email and Paid $400 for each parent

10/22/09: I -864 Entered into NVC System as per NVC Operator

10/22/09: IV Fee BILL Status Changed to PAID

10/23/09: Mailed DS-230 Documents Set to NVC

10/26/09: DS-230 Received by NVC signed by J.DESMOND

10/28/09: I -864 Accepted

10/29/09: Rcvd Checklist Email

10/30/09: AVR changed to " We received checklist response on 10/29/09"

11/18/09: LOGIN Failed in the morning...AVR message not changed yet...

11/18/09: Talked to Operator and it is under "FINAL REVIEW"

11/20/09: CASE COMPLETED on 11/19/09

12/02/09: Rcvd Emails for Interview on 01/08/2010

12/04/09: Medical Appt on 12/08/09 at Hyderabad

12/09/09: Medical Completed

01/08/10: INTERVIEW COMPLETED

01/12/2010: Rcvd Passports and sealed envelope.

05/20/2010: POE at DFW

Link to comment
Share on other sites

Filed: Timeline

Raj, I heard NVC AVS that they received I864 on Oct 22nd? does that mean that entered in NVC system? or just received it.?

08/27/2009: Sent I-130 for IR5

09/12/2009: Received NOA1

10/02/2009: Received NOA2

10/12/2009: DS3032 sent by email

10/22/2008: I864 sent

10/26/2009: DS3032 accepted

10/29/2009: IV bill generated got email and PAID

11/04/2009: Got checklist email for DS230

12/01/2009: (needed some time to collect documents so here it got some delayed) Sent DS230

12/04/2009: DS230 delivered

12/08/2009: DS230 Received Updated AVR

12/15/2009: Login failed

12/18/2009: Case completed as per AVR - no email yet for interview date

12/28/2009: Got Interview schedule email - Scheduled on 02/22/2010 (hoorrayyy)

01/25/2010: Medical Appointment

01/25/2010: Medical Done

02/22/2010: Interview Done - Visa issued.

05/20/2010: US Entry - Washington DC IAD.

06/10/2010: Received Welcome Notice from USCIS

06/28/2010: Received GC for Mom, still waiting for DAD

06/30/2010: Received GC for Dad

07/01/2010: applied for SSN

07/08/2010: Received SSN card in mail.

Good luck to all for your process, and congratulation who already received Visa.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...