Jump to content

13 posts in this topic

Recommended Posts

Filed: Citizen (pnd) Country: India
Timeline
Posted

Hey everyone,

I read on shortcut guide as well as read somehwere in posts to write down NVC case # on top of all the documents you send. For original documents, use sticky notes. I am right now creating little sticky notes with Form #, Case #, Name, and DOB (tedious). I was wondering if all of you've done this. On what documents you wrote down NVC # vs. used sticky notes, etc. Any help is appreciated. Thanks!!!!

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
Hey everyone,

I read on shortcut guide as well as read somehwere in posts to write down NVC case # on top of all the documents you send. For original documents, use sticky notes. I am right now creating little sticky notes with Form #, Case #, Name, and DOB (tedious). I was wondering if all of you've done this. On what documents you wrote down NVC # vs. used sticky notes, etc. Any help is appreciated. Thanks!!!!

the best way to do is to create labels. you can do it through ms word. i wrote nvc case number and name on the labels.

USCIS (Vermont Service Center) Journey

Mailed I-130 Packet on 05/27/08

Approved: 12/23/08

NVC Journey

NVC Case Number assigned 01/02/09

Case Completed 01/21/09

End of Visa Journey

New Delhi Embassy Interview 03/17/09

VISA APPROVED!!!!!

Filed: Citizen (pnd) Country: India
Timeline
Posted
the best way to do is to create labels. you can do it through ms word. i wrote nvc case number and name on the labels.

Did you put labels on everything? Original or not? I don't have label maker (printer or the paper thus doing it manually.

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Filed: Citizen (pnd) Country: India
Timeline
Posted
Excellent idea in case someone drops a stack of petitions. Did ours in upper right corner by hand.

Haole, did you put it on every paper you sent including forms, cover letters, etc?

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
Excellent idea in case someone drops a stack of petitions. Did ours in upper right corner by hand.

Haole, did you put it on every paper you sent including forms, cover letters, etc?

Good idea to write case# but I have not mentioned anything on originals.

I hope they will not loss it.

Cover letter already has your NVC case #. Yes write on form too (upper left corner).

*IR-1 Visa* VSC

I-130 (IR-1):

07/22/2008: NOA1

02/17/2009: I-130 NOA2: Approved in 210 days from NOA1 date

I-129F (K-3):

08/11/2008: NOA1

02/17/2009: I-129F NOA2: Approved in 190 days from NOA1 date

<not pursuing I-129F petition further but NVC forwarded case to Consulate on 02/24/2009>

NVC Journey:

02/19/2009: NVC Received/Case number assigned for I-130

02/20/2009: DS-3032 sent by e-mail and 03/04/2009: DS-3032 sent by regular mail

02/26/2009: NVC received DS-3032 Choice of Agent selection

02/26/2009: DS-3032 accepted and AOS Bill Generated but not IV Bill

02/28/2009: AOS Bill Package received in mail

02/28/2009: Paid AOS Bill and IV Bill (as it was available) online

03/03/2009: Both AOS and IV Bill Show as Paid and Coversheet Printed

03/04/2009: Mailed I-864 and IV (DS-230) Packages

03/06/2009: I-864 and IV Packages Received by NVC and Scanned on 03/10/2009

03/13/2009: Case completed at NVC (in 17 working days from date NVC Received)

03/25/2009: Interview date assigned by NVC

US Consulate @ Mumbai, India

04/02/2009: Medical Exam (based on NVC e-mail for interview)

04/13/2009: Interview Packet Received from US Consulate

04/16/2009: Documents submitted at VFS office

[Classified]: Date of Interview

USA Journey

02/21/2009: Permanent Resident # Received (Ref: NOA2 of USCIS)

05/2009: POE

##/##/2009: Permanent Resident Card

##/##/2009: SSN

Love must be sincere............Roman 12:9

Filed: Citizen (pnd) Country: India
Timeline
Posted

Thanks all of you....

I am creating bunch of sticky notes for both I-864 and DS-230. I am going to put sticky notes on everything....since they can easily be taken out, it wouldn't hurt I guess... I'll see if I can find out from NVC operator if they've any preferences.

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Filed: Citizen (apr) Country: Canada
Timeline
Posted (edited)
Thanks all of you....

I am creating bunch of sticky notes for both I-864 and DS-230. I am going to put sticky notes on everything....since they can easily be taken out, it wouldn't hurt I guess... I'll see if I can find out from NVC operator if they've any preferences.

We wrote our case # in pencil in the upper right hand corner of every page unless it was already noted on the form. On the original certificates for the DS-230 (birth, marriage, police) and tax transcripts for the I-864 we used post-it-notes. Our case was completed within 4 days!

Good luck :thumbs: Sounds like you are well prepared!

Edited by OBX

USCIS

NOA1 08/19/08

NOA2 01/20/09

NVC

Received 01/26/09

Completed 02/13/09 (19 Days)

Interview Assigned 03/27/09 (6 weeks after NVC completion)

Medical

04/14/09 (Toronto)

Interview

Montreal 05/12/09 (88 days after NVC completion) **APPROVED**

POE

06/16/09 Buffalo

07/02/09 Welcome Letter Received

07/07/09 Applied for SSN

07/10/09 "Card production ordered" email received

07/13/09 SSN received

07/14/09 "Approval notice sent" email received

07/17/09 GREEN CARD received

Removal of Conditions

03/21/11 I-751 mailed to VSC

03/23/11 I-751 received at VSC

03/29/11 Cheque Cashed

03/30/11 NOA1 received (3/24/11)

04/11/11 Biometrics appointment notice received

05/05/11 Biometric appointment

12/13/11 **Approval date** (5 days short of 9 months!)

12/19/11 Approval letter and green card received

Naturalization

05/16/2019 Filed online (estimated completion February 2020)

05/18/2019 Biometrics scheduled

05/21/2019 Receipt notice and biometrics notices posted to online account.05/23/2019 Hard copy of NOA1 received

05/24/2019 Hard copy of biometrics appointment received

06/07/2019 Biometrics appointment (estimated completion January 2020)

12/31/2019 Email received "Interview scheduled"

01/01/2020 Interview date notice posted to online account (02/19/2020)

01/05/2019 Hard copy of interview appointment received

02/19/2020 Interview (**Approved**) and same day Oath Ceremony. 

Filed: Citizen (pnd) Country: India
Timeline
Posted

Thanks OBX.

I love this forum...

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Filed: Citizen (apr) Country: Canada
Timeline
Posted
Thanks OBX.

I love this forum...

Me too :thumbs: Without VJ what would I do with myself while waiting for an interview date?? :lol:

USCIS

NOA1 08/19/08

NOA2 01/20/09

NVC

Received 01/26/09

Completed 02/13/09 (19 Days)

Interview Assigned 03/27/09 (6 weeks after NVC completion)

Medical

04/14/09 (Toronto)

Interview

Montreal 05/12/09 (88 days after NVC completion) **APPROVED**

POE

06/16/09 Buffalo

07/02/09 Welcome Letter Received

07/07/09 Applied for SSN

07/10/09 "Card production ordered" email received

07/13/09 SSN received

07/14/09 "Approval notice sent" email received

07/17/09 GREEN CARD received

Removal of Conditions

03/21/11 I-751 mailed to VSC

03/23/11 I-751 received at VSC

03/29/11 Cheque Cashed

03/30/11 NOA1 received (3/24/11)

04/11/11 Biometrics appointment notice received

05/05/11 Biometric appointment

12/13/11 **Approval date** (5 days short of 9 months!)

12/19/11 Approval letter and green card received

Naturalization

05/16/2019 Filed online (estimated completion February 2020)

05/18/2019 Biometrics scheduled

05/21/2019 Receipt notice and biometrics notices posted to online account.05/23/2019 Hard copy of NOA1 received

05/24/2019 Hard copy of biometrics appointment received

06/07/2019 Biometrics appointment (estimated completion January 2020)

12/31/2019 Email received "Interview scheduled"

01/01/2020 Interview date notice posted to online account (02/19/2020)

01/05/2019 Hard copy of interview appointment received

02/19/2020 Interview (**Approved**) and same day Oath Ceremony. 

Filed: Citizen (pnd) Country: India
Timeline
Posted

Hehe.... great community service. You should be allowed to put that on your resume ;)

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Filed: Citizen (apr) Country: Canada
Timeline
Posted
Hehe.... great community service. You should be allowed to put that on your resume ;)

How about "extensive experience in emoticon use" :rofl::rofl:

Hope the upcoming week brings everyone the news they are waiting for. Good luck everyone!

USCIS

NOA1 08/19/08

NOA2 01/20/09

NVC

Received 01/26/09

Completed 02/13/09 (19 Days)

Interview Assigned 03/27/09 (6 weeks after NVC completion)

Medical

04/14/09 (Toronto)

Interview

Montreal 05/12/09 (88 days after NVC completion) **APPROVED**

POE

06/16/09 Buffalo

07/02/09 Welcome Letter Received

07/07/09 Applied for SSN

07/10/09 "Card production ordered" email received

07/13/09 SSN received

07/14/09 "Approval notice sent" email received

07/17/09 GREEN CARD received

Removal of Conditions

03/21/11 I-751 mailed to VSC

03/23/11 I-751 received at VSC

03/29/11 Cheque Cashed

03/30/11 NOA1 received (3/24/11)

04/11/11 Biometrics appointment notice received

05/05/11 Biometric appointment

12/13/11 **Approval date** (5 days short of 9 months!)

12/19/11 Approval letter and green card received

Naturalization

05/16/2019 Filed online (estimated completion February 2020)

05/18/2019 Biometrics scheduled

05/21/2019 Receipt notice and biometrics notices posted to online account.05/23/2019 Hard copy of NOA1 received

05/24/2019 Hard copy of biometrics appointment received

06/07/2019 Biometrics appointment (estimated completion January 2020)

12/31/2019 Email received "Interview scheduled"

01/01/2020 Interview date notice posted to online account (02/19/2020)

01/05/2019 Hard copy of interview appointment received

02/19/2020 Interview (**Approved**) and same day Oath Ceremony. 

Posted

We did it by hand and wrote the case # on upper right hand corner of every single page. even the form sheets. This is best in case a page falls out or gets misplaced at least you know it can find it's way back to your file.

IR-1 / CR-1 Visa

Event Date

Service Center : California Service Center

Consulate : Manila, Philippines

Marriage : 2007-05-10

I-130 Sent : 2008-06-30

I-130 NOA1 : 2008-07-09

I-130 Approved : 2009-01-27

NVC Received : 2009-02-02

Received DS-3032 / I-864 Bill : 2009-02-11

DS-3032 E-Mail accepted: 2009-02-11

Pay I-864 Bill 2009-02-14

Receive I-864 Package : 2009-02-14

Return Completed I-864 : 2009-02-18

Return Completed DS-3032 : 2009-02-11

IV Bill generated: 2009-02-11

Receive IV Bill : 2009-02-14

Pay IV Bill : 2009-02-14

Receive Instruction Package : 2009-02-18

NVC received both packages: 2009-02-20

DS-230 & I-864 scanned NVC: 2009-02-23

Case Completed at NVC : 2009-02-26

Interview confirmed: 2009-02-27

NVC Left : 2009-03-06

Consulate Received : 2009-03-09

Medical completed: 2009-03-20

Interview Date : 2009-04-03

Visa Received : 2009-04-07

US Entry : 2009-05-10

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...