Today i received the following message via email, any idea what they mean by "requesting initial evidence in this case" I called USCIS (800) 375 – 5283 and they told me that i need to wait till i get something in the mail and they also gave me the same "status information"

Any idea, why they are asking for this information - this late in the filing process?

Application Type: I130, IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN

Current Status: REQUEST FOR INITIAL EVIDENCE SENT, CASE PLACED ON HOLD

On February 12, 2009, we mailed a notice requesting initial evidence in this case. Please follow the instructions on the notice to submit the evidence requested. Meanwhile, processing of this case is on hold until we either receive the evidence or the opportunity to submit it expires. Once you submit the evidence requested and a decision is made, you will be notified by mail. If you move while this case is pending, please use our Change of Address online tool to update your mailing address.

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

Filed: K-3 Visa Country: Romania
Timeline
Posted
Today i received the following message via email, any idea what they mean by "requesting initial evidence in this case" I called USCIS (800) 375 – 5283 and they told me that i need to wait till i get something in the mail and they also gave me the same "status information"

Any idea, why they are asking for this information - this late in the filing process?

Application Type: I130, IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN

Current Status: REQUEST FOR INITIAL EVIDENCE SENT, CASE PLACED ON HOLD

On February 12, 2009, we mailed a notice requesting initial evidence in this case. Please follow the instructions on the notice to submit the evidence requested. Meanwhile, processing of this case is on hold until we either receive the evidence or the opportunity to submit it expires. Once you submit the evidence requested and a decision is made, you will be notified by mail. If you move while this case is pending, please use our Change of Address online tool to update your mailing address.

I got this same message on my case. when I got the mail it stated they wanted the original copy of my divorce papers from previous marraige. I got that and sent it to them and the process resumed. I was approved 30 days later. good luck

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

Was that from USCIS or from National Visa Center? If they are requesting for original, i only got 1 original copy of marriage certificate. I read somewhere that after the approval, i need to send most of these documents again to NVC and some of those docs, they need to see the original.

Edited by KeralianNY

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

Filed: K-3 Visa Country: Romania
Timeline
Posted
Was that from USCIS or from National Visa Center? If they are requesting for original, i only got 1 original copy of marriage certificate. I read somewhere that after the approval, i need to send most of these documents again to NVC and some of those docs, they need to see the original.

this letter came from uscis. your request could be for something totally different. all I know is the faster you get the info back to them the fster you case will resume. as far as having to send docs again I have read that to but I have also read that they will not be needed until your interview. I have copies of everything with my wife in Romania and I will be there for her interview

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
Was that from USCIS or from National Visa Center? If they are requesting for original, i only got 1 original copy of marriage certificate. I read somewhere that after the approval, i need to send most of these documents again to NVC and some of those docs, they need to see the original.

this letter came from uscis. your request could be for something totally different. all I know is the faster you get the info back to them the fster you case will resume. as far as having to send docs again I have read that to but I have also read that they will not be needed until your interview. I have copies of everything with my wife in Romania and I will be there for her interview

USCIS needs copy of the documents and NVC require all the documents in original (with translations in english if the originals are in foreign language) except copy of the biographic page of beneficiary, copy of 3 yeards of tac return with copy of W-2 and/or 1099, copy of pay checks. I included 2 1 /2 months of recent pay checks.

Keraliany just wait for the RFE and respond back. Your case had already in review and will be approves as soon as USCIS receives it.

Filed: Citizen (pnd) Country: India
Timeline
Posted

KeralianNY - They person reviewing your case is probably looking for additional information regarding something in your package. Wait for the notice from USCIS and send the documents requested back to them. Your case is in the hands of an immigration officer so its just a matter of time until you get your approval.

The Journey Home
04/27/2009 - POE at JFK (Quick and Easy!!!!)
05/07/2009 - Applied for SSN
05/09/2009 - Welcome Letter Received
05/14/2009 - SSN Received
05/11/2009 - GC Production Ordered
06/12/2009 - GC Production Ordered (AGAIN ?!?!?!)
06/19/2009 - Alien Registration Approval notice email
06/22/2009 - 2 Year Green Card Received!!!!!!

Naturalization
02/06/2013 - Application Sent
02/13/2013 - NOA (Priority Date Feb 8th)
02/13/2013 - Biometrics Appt. Letter Received
02/21/2013 - Early Bio Appt. (Original March 15th)
02/26/2013 - Place Inline for Interview

04/24/2013 - Interview scheduled

05/31/2013 - Interview - Recommended for Approval

XX/XX/2013 - Oath Ceremony

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

thank you all for the prompt reply, will wait till i receive the mail...

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

Filed: AOS (pnd) Country: Philippines
Timeline
Posted

Hi, On December 15, 2008, we also got an RFE Request for an Initial Evidence. They asked my fiance's Birth certificate, his divorce decree and our G-325A. We havent able to submit his birth certificate and his divorce decree. But G-325A we did able to send it but i dont know maybe they lost it.

Goodluck!!

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

I got the USCIS RFE letter home today, and it was the marriage certificate problem. It looks like i will need to get a different marriage certificate, since my certificate says "Deed of Marriage"

As per the RFE, they wont accept it - "It Noted that a deed of marriage is not sufficient proof."

http://chennai.usconsulate.gov/fiance/fiancee_visas.html

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

  • 2 weeks later...
Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

To all,

I traveled to India and gotten the deed of marriage certificate corrected to the right marriage certificate. The local panchayat gave me so much of hard time and it took me like 3 days to finally get the certificate on hand. It appears that it usually takes about a month for most of the people, i then had to show them the urgency of why i needed it. Also i needed a few politicians involved to get everything in order. I received it before the 28th, thank god i got this before the new rule took place.

Last week on Feb 28th the rules got changed in Kerala. I was told that, if one doesn't register their marriage within 21 days [Church Marriage etc..] that it will take like 6months plus to get the certificate. For those who tries to get the certificate after 21 days - the whole process has to go through with so many different offices.

Sample of Kerala Marriage certificate: http://www.kerala.gov.in/applicationforms/kzhkdcrpn_06.pdf

And Today i send RFE back to USCIS, with the correct marriage certificate and the certificate from church.

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

Filed: Citizen (pnd) Country: India
Timeline
Posted (edited)

This is the same reason I had my rfe. Once corrected you'll have an approval on 12-14 days. Goodluck.

I got the USCIS RFE letter home today, and it was the marriage certificate problem. It looks like i will need to get a different marriage certificate, since my certificate says "Deed of Marriage"

As per the RFE, they wont accept it - "It Noted that a deed of marriage is not sufficient proof."

http://chennai.usconsulate.gov/fiance/fiancee_visas.html

Edited by robbyrob
Filed: AOS (apr) Country: Philippines
Timeline
Posted
Hi, On December 15, 2008, we also got an RFE Request for an Initial Evidence. They asked my fiance's Birth certificate, his divorce decree and our G-325A. We havent able to submit his birth certificate and his divorce decree. But G-325A we did able to send it but i dont know maybe they lost it.

Goodluck!!

I got the same problem too.we filed for AP last december with all the requirements, then we got a mail from the USCIS last march 7 for RFE asking for my 2x2 photos. But im very sure that we sent it already. Sometimes they misplace or lost papers and that makes the case take longer than it should be.

  • 4 weeks later...
Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Finally received the approvals via email today...

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

Filed: Citizen (apr) Country: Jamaica
Timeline
Posted
Hi, On December 15, 2008, we also got an RFE Request for an Initial Evidence. They asked my fiance's Birth certificate, his divorce decree and our G-325A. We havent able to submit his birth certificate and his divorce decree. But G-325A we did able to send it but i dont know maybe they lost it.

Goodluck!!

You should have sent everything that they asked for. You have not mailed what they requested so maybe that is why it appears as if they "lost" your G325A. Not sending what they requested makes it appear as if you cannot prove what you have stated on your application. I hope that you have sent it in by now with a copy of the RFE letter they send to you. All the best.

STANLEY & KAREN
01/15/2009 - Fedex I-130, I-485, I-693, I-864, I-765, G-325A
01/20/2009 - Received in mail-room and signed for by J CHYBA
01/28/2009 - Checks cashed by Homeland Security
02/02/2009 - Received in mail 3 pcs of NOA1 one each for I-485, I-130, I-765 dated 01/28/2009
02/03/2009 - Received email RFE. What did I not send now, whew!
02/09/2009 - Received mails for initial evidence and Biometric appointment (02/19/2009); mailed evidence
02/19/2009 - biometrics done - in a out in 45 minutes
03/14/2009 - Receive NOA2 dated 03/10/2009. AOS interview April 29, 2009
03/18/2009 - Touched. EAD Card production ordered
03/25/2009 - Touched. EAD approval sent
03/27/2009 - EAD card received in the mail; applied for SS# immediately (office is across the street from my home)
04/02/2009 - Received SS# in the mail
04/29/2009 - Interviewed. I- 130 approved, I-485 pending IO's review
05/05/2009 - Received NOA2. Welcome letter for Permanent Residency. I-130 and I-485 approved 04/30/2009
05/08/2009 - Touched. I-485 approval letter sent
05/11/2009 - GC received in the mail. Expires 2019
05/11/2009 - Applied to remove restrictions on my SS Card
05/18/2009 - Received unrestricted SS card

10/13/2009 - My darling husband of 2 yrs 5 months 3 weeks 3 days passed away :(

Naturalization Process (5 Yrs Later) :goofy:

Mar 28, 2014 - Mailed N-400
Apr 08, 2014 - Check cashed
Apr 09, 2014 - Receive Notice letter Priority date April 3, 2014
Apr 11, 2014 - Touched - Email - Biometrics letter mailed
May 08, 2014 - Biometrics done
May 12, 2014 - Touched - Email - In line for interview scheduling
July 12, 2014 - Pre-interview letter (Yellow letter) received in mail
Aug 20, 2014 - Touched - Email - Interview scheduled
Aug 25, 2014 - Interview scheduled for Sept. 24, 2014
Sept 24, 2014 - Passed interview
Oct 06, 2014 - Touched - Email - In oath scheduling que
Oct 08, 2014 - Touched - Text - Oath ceremony scheduled
Oct 14, 2014 - Received letter - Oath ceremony Oct 28, 2014
Oct 28, 2014 - I AM A US CITIZEN! :joy: :joy: :joy:
Nov 12, 2014 - Updated my status from permanent resident to citizen at Social Security
Nov 14, 2014 - Applied for US passport
Nov 29, 2014 - Received US passport book
Dec 01, 2014 - Received Passport card
Dec 04, 2014 - Received Naturalization Certificate

--------------------
KayCee

Ccut.jpg.png

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Everything is fine... i got the approval today!!

-------------------

USCIS *CR-1 Visa* Journey

Service Center : Vermont Service Center

2008-08-07 : I-130 Sent

2008-08-16 : Recieved NOA1 Hard Copy

2008-08-19 : I-129 Sent

2008-08-27 : NOA1 Approved -I-129F

2009-02-12 : RFE Email

2009-02-17 : RFE mail Rcvd

2009-02-20 : Traveled 2 India to correct the RFE issue

2009-03-02 : Mailed the corrected RFE Docs to USCIS

2009-03-04 : Received confirmation via email from USCIS that they received the RFE documents. CASE RESUMED

2009-04-02 : NOA2 Approved for I-129F and I-130 via email

2009-04-08 : NOA2 Arrives in mail for I-129F and I-130

2009-04-11 : Received letter from NVC stating I-129F case has been forwarded to EMBASSY for processing.

NVC Journey

2009-04-15 : Case Number Assigned - Received this by speaking to a live operator. NVC automated message was not updated-it said "NO CASE# Assigned"

2009-04-17 : DS-3032 sent (by e-mail)

2009-04-20 : DS-3032 and AOS bill generated

2009-04-20 : DS-3032 sent (by e-mail) again after receiving the email for DS-3032 and AOS bill generated

2009-04-20 : AOS PAID (online)

2009-04-23 : AOS package sent to NVC

2009-04-24 : DS-3032 Choice of Agent accepted - Beneficiary received email - ACCEPTED one was 4/17/2009 email

2009-04-24 : IV Fee bill generated

2009-04-24 : IV bill PAID - showed PAID ON- 04/25/2009 and printed coversheet

2009-04-25 : DS-230 sent to NVC

2009-05-07 : case complete at NVC

Embassy Journey

2009-05-13 : Forward the case to Embassy in Chennai, India

2009-06-18 : Medical

2009-06-26 : Visa Interview

2009-06-26 : Visa Approved

2009-06-29 : Visa in Hand

2009-07-02 : POE - (JFK, New York)

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...