I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

1919m3v26vlf5u.gif

--------------------

01-25-2008 =I-129f sent to CSC

01-28-2008 = CSC recieved petition

02-05-2006 =Noa1

06-02-2008 =touched

06-03-2008 =touched

06-10-2008 = NOA2

06-17-2008 = NVC harcdcopy

07-03-2008 = medical (passed)

07-09-2008- Paid DV

07-16-2008 - DV Forward to NSO

08-05-2008= Interview

08-20-2008 = visa printed

08-21-2008 = VISA ON HAND ( my birthday too)

09-02-2008- flight to USA

10-18- 2008= wedding

Posted

Hayy naku, malala parin ang DV process (malala or palala ng palala).. it almost makes me feel guilty that I got the easy way sa DV. :( I didn't call NSO, didn't bother USEM (before interview) just made two calls to Robbie at delbros (1st right after paying, 2nd call a week before interview) but was lucky that my verification result was with USEM during interview.

Btw dear, yang mga 2weeks, 1-4weeks and 4-6weeks are just standard replies when they don't want to really check your case and just want to let you off the phone fast.

Do hope to see all of you stuck on DV prison be able to get out and recieve the visa soon. (F)

ROC

still waiting for GC replacement

N-400

04/23/2012...... N-400 packet sent to Lewisville, TX via USPS express mail

04/24/2012...... N-400 delivered signed for by J. Arthur; priority date according to NOA1

04/27/2012...... Check cashed

04/30/2012...... Received NOA 1 dated April 26, 2012

06/01/2012...... Received notice for biometrics dated May 29, 2012

06/20/2012...... Biometrics schedule (early bio June 05, 2012)

06/18/2012...... Email notification, N400 placed in line for interview

06/29/2012...... Email notification, N400 scheduled for interview

07/05/2012...... Interview Letter Received

08/07/2012...... Interview (PASSED)

Link to: Full timeline

God is in CONTROL. His time is always better than mine: never too early yet never late, always the perfect time.

Filed: K-1 Visa Country: Philippines
Timeline
Posted
I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

sorry to hear that jhen....... grabe...kinakabahan tuloy me bka mmya d pa rin nila nforward sa embassy ung sa akin......tintawagan ng bf ko knina c Grace kya lang lagi busy ung line nya........bukas try nmin twagan ang NSO......goodluck sis...sana matapos n yang DV na yan so u can have ur visa soon.....

Posted
I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

hi jhen

sorry to hear ur having problems AND delays with DV, mine took all of 6 weeks total from the time i paid to the time it went to the USEM. hope urs get done soon sis, take care

June 2006 Met on Myspace
Sep 21 2007 Proposed and she accepted
Dec 9 2007 Arrived in Manila
Dec 15 2007 Returned home, very sad day
Dec 21 2007 Sent Form I-129F to CSC
Dec 24 2007 Packet received at CSC
Dec 31 2007 NOA 1 received
Jan 02 2008 Check cashed
May 05 2008 NOA2
May 12 2008 Received letter from NVC MNL2008xxxxxx
May 19 2008 Paid Delbros fee at Metrobank
May 20 2008 First day of medical
May 21 2008 Told to return for sputum test
May 21 2008 Delbros confirmed receiving payment
May 27 2008 Delbros sent proof of payment to USEM
May 27,28,29 2008 Sputum test done
June 6 2008 Delbros sent doc ver request to the NSO
June 27 2008 NSO doc ver completed, to be picked up by USEM
July 1, 2008 Called USEM, doc ver is at the embassy
July 30, 2008 Passed the sputum test and finished the physical
Aug 5, 2008 Interview, PASSED received PINK SLIP
Aug 12 2008 VISA IN HAND!!!!!!!!!!!!!! Thank you God
Aug 16,2008 Flight to US. Manila to Narita, to Chicago
Sept 8, 2008 Civil wedding
Feb 14, 2009 Big fancy wedding
groupresized.jpg

Filed: K-1 Visa Country: Philippines
Timeline
Posted
Hayy naku, malala parin ang DV process (malala or palala ng palala).. it almost makes me feel guilty that I got the easy way sa DV. :( I didn't call NSO, didn't bother USEM (before interview) just made two calls to Robbie at delbros (1st right after paying, 2nd call a week before interview) but was lucky that my verification result was with USEM during interview.

Btw dear, yang mga 2weeks, 1-4weeks and 4-6weeks are just standard replies when they don't want to really check your case and just want to let you off the phone fast.

Do hope to see all of you stuck on DV prison be able to get out and recieve the visa soon. (F)

yes indeed.. they don't want to entertain callers...pero huwag naman sanang ganon ang reason..they should act professional because this is not a non sense matters...tayo pa nga ang nagbabayad eh..

It should'nt be that hard...

I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

sorry to hear that jhen....... grabe...kinakabahan tuloy me bka mmya d pa rin nila nforward sa embassy ung sa akin......tintawagan ng bf ko knina c Grace kya lang lagi busy ung line nya........bukas try nmin twagan ang NSO......goodluck sis...sana matapos n yang DV na yan so u can have ur visa soon.....

well about grace naman..sasabihin sa yo..na its better daw na yun fiance ang tatawag...ano ba yan ,,they descriminating us???

I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

hi jhen

sorry to hear ur having problems AND delays with DV, mine took all of 6 weeks total from the time i paid to the time it went to the USEM. hope urs get done soon sis, take care

Thanks...

1919m3v26vlf5u.gif

--------------------

01-25-2008 =I-129f sent to CSC

01-28-2008 = CSC recieved petition

02-05-2006 =Noa1

06-02-2008 =touched

06-03-2008 =touched

06-10-2008 = NOA2

06-17-2008 = NVC harcdcopy

07-03-2008 = medical (passed)

07-09-2008- Paid DV

07-16-2008 - DV Forward to NSO

08-05-2008= Interview

08-20-2008 = visa printed

08-21-2008 = VISA ON HAND ( my birthday too)

09-02-2008- flight to USA

10-18- 2008= wedding

Filed: K-3 Visa Country: Philippines
Timeline
Posted
I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

Hi! Same here...PJ of NSo told me that my name is common (Catherine) so verification will take 2-3 wks daw. He told me that July 14 and 21 when I kept caling them for follow-up since NSO releases DV results to Embassy every Friday. I paid my DV June 26, I got interviewed July 3, and my DV was done Aug 1. Now Embassy told my husband that they already received my DV from NSO on Aug 4. And Aug 5 the Consular Officer started reviewing again my docs, and it will take 2weeks, HMP!!! So I'm now stuck waiting...waiting...waiting...and still waiting....What a long WAIT!!! :bonk::help::angry:

Filed: K-3 Visa Country: Philippines
Timeline
Posted

sorry to hear about this jhen..but everything have a good reason behind it i know the waiting is killing everyone i had an easy way out with the DV thing..but be patient just a little bit more and pray always God won't give u a problem that u can't handle! God bless! :star:

Love is an unexpected thing...and when it arrives grab it with all ur heart....it may pass u jsut once.......

1_217966694l.jpg

11.20.07 : mailed I130

01.23.08 : NOA1

04.21.08 : mailed I129F

04.22.08 : NOA1

05.14.08 : NOA2 both for I 130 and I 129F

06.26.08 : medical exam 2nd day PASSED!!

07.09.08 : interview day! PASSED! PINK SLIP!

07.15.08 : visa on hand!!!

08.01.08 : POE SFO (home with my papi!)

Filed: K-1 Visa Country: Philippines
Timeline
Posted
I thought when you paid delbros early..everything is going well..but its not...there are some excuses..and so on ..

don't just rely what Richard told you ..He told me that mine was 1-4 weeks before my interview...and then i call again before my interview and he said..15 working days and wait at the embassy...but after my interview..I found out that my DV is not yet done and it was still at the nso!..ive got white slip!..

So I make a calls to the embassy even my fiance too..and Grace told me that the process was 4-6 weeks...omg...then we call up again at the nso..and Richard told me that i have a common name...what!..everybody has a common name and they are not just relying only on my last name and how many people will born on the same date, day and place ...and the parents...

I don't know how are they doing the right process...and why it took so long ... he told to my fiance that it will take 4 weeks ...my fiance said ..it already been 4 weeks!

The thing is..Ive got my latest cenomar and bc from the nso..and already filed for verification for four weeks ago.

what are the process are they doing to verify a simple document to one person if they have a database...So all in all its gonna be 8 weeks! ..

and in the end he told us to call back on friday and we'll see what is the next excuse.. :bonk:

Hi! Same here...PJ of NSo told me that my name is common (Catherine) so verification will take 2-3 wks daw. He told me that July 14 and 21 when I kept caling them for follow-up since NSO releases DV results to Embassy every Friday. I paid my DV June 26, I got interviewed July 3, and my DV was done Aug 1. Now Embassy told my husband that they already received my DV from NSO on Aug 4. And Aug 5 the Consular Officer started reviewing again my docs, and it will take 2weeks, HMP!!! So I'm now stuck waiting...waiting...waiting...and still waiting....What a long WAIT!!! :bonk::help::angry:

ay naku there is a lot of things to locate...like birthday, parent's name,, etc..i think ..scripted na lang yan sinasabi nilang common common...Sa akin apelyido naman daw ang common ...hehehhehe natural maraming common talaga...Are they nuts!..wla ba silang standard time..ay naku ..nakakaloka sila...we will start bugging them.. :thumbs:

1919m3v26vlf5u.gif

--------------------

01-25-2008 =I-129f sent to CSC

01-28-2008 = CSC recieved petition

02-05-2006 =Noa1

06-02-2008 =touched

06-03-2008 =touched

06-10-2008 = NOA2

06-17-2008 = NVC harcdcopy

07-03-2008 = medical (passed)

07-09-2008- Paid DV

07-16-2008 - DV Forward to NSO

08-05-2008= Interview

08-20-2008 = visa printed

08-21-2008 = VISA ON HAND ( my birthday too)

09-02-2008- flight to USA

10-18- 2008= wedding

Filed: AOS (apr) Country: Philippines
Timeline
Posted

Yup don't stop bugging them. Geez that is such a pain. I didn't go through document verification during my visa application last year. It all went smoothly. Is that a new thing? When did they start doing that? Visa fees, medical exam fees, just everything raised to the roof. tsk! tsk! :protest:

K3 Visa - To Texas from Philippines

01-xx-2007 - I-130 & I-129F Sent

01-30-2007 - I-130 NOA1 Received

02-12-2007 - I-129F NOA1 Received

02-21-2007 - I-129F NOA2 Received (Transfer Notice)

06-25-2007 - I-129F NOA3 Received (Approval Notice)

07-26-2007 - I-130 NOA2 Received (Approval Notice)

06-12-2007 - K3 Packet Received

07-23-2007 - Medical

08-06-2007 - Visa Interview

08-09-2007 - Visa and Mysterious Brown Envelope Pick Up

08-29-2007 - Finally Reunited

EAD (soooo bored!)

05-14-2008 - EAD Mailed at Vermont

05-19-2008 - EAD Received (Signed for by ASTANLEY)

05-29-2008 - Check Cashed

05-30-2008 - NOA1 Received

06-27-2008 - Card Production Ordered

06-30-2008 - Approval Notice Sent

07-03-2008 - EA Card Received

AOS

06-12-2008 - AOS Mailed at Chicago Lockbox (finally, paperwork ready and complete)

06-16-2008 - AOS Received (Signed for by JCHYBA)

06-24-2008 - NOA1 Received

06-25-2008 - Check Cashed

07-16-2008 - Biometrics Appointment

11-13-2008 - Interview

01-07-2009 - Second Appointment

01-07-2009 - Card Production Ordered

01-13-2009 - Welcome Letter Received

01-20-2009 - 10-YEAR PERMANENT RESIDENT CARD Received

Filed: K-1 Visa Country: Philippines
Timeline
Posted
thats what they told me too. and when i asked if there was anything i can do to expidite the case, that fool told me "papuntahin nyo po ang embassy dito para kuhanin."

why are government employees so grumpy?

wala na talaga siguro silang masabi...tsk ..tsk...I don't think so na talagang talagang they checked for it to follow up or they don't know what to say na...I'm really dissapointed.

jhen

1919m3v26vlf5u.gif

--------------------

01-25-2008 =I-129f sent to CSC

01-28-2008 = CSC recieved petition

02-05-2006 =Noa1

06-02-2008 =touched

06-03-2008 =touched

06-10-2008 = NOA2

06-17-2008 = NVC harcdcopy

07-03-2008 = medical (passed)

07-09-2008- Paid DV

07-16-2008 - DV Forward to NSO

08-05-2008= Interview

08-20-2008 = visa printed

08-21-2008 = VISA ON HAND ( my birthday too)

09-02-2008- flight to USA

10-18- 2008= wedding

Filed: K-3 Visa Country: Philippines
Timeline
Posted

i was actually given the same excuse. my full name is CATHERINE JOY FERNANDEZ DELA CRUZ. yes, it does sound and look common but my maiden middle name isn't - OLIPAS. and I think gabrielle is right about having other data checked like the date of birth, birth place, parents' name, etc. so i dont know what other reasons they have to delay the document verification process.

this is actually weird. getting marriage certificates and other documents printed in NSO paper actually came from NSO itself. receipts can prove it. it can't be tampered. so i don't see the point as to why the USEM started all this run-around.

additional income for the Philippine gov't??? this is getting so frustrating. we've paid for lots of money for this whole thing so they should at respect us whenever we call them for follow ups and also to make sure that they are doing their jobs.

No wonder the Phil government never really got out of the third world country status. tsk tsk...

K-3 Visa

Marriage : 2007-12-05

I-130 Sent : 2008-01-15

Packet 4 Received : 2008-07-17

Interview Date : 2008-08-05

Visa Received : AUGUST 29,2008 VISA ON HAND!!!!!!!!!!!!

US Entry : DECEMBER 26 2008 POE-LAX

m_825bdb5ca8a44b0997b81e1c36d0c59c.jpg

AOS and EAD

05/30/2009 - sent AOS package to USCIS Chicago Lockbox via USPS Express Mail day 1

06/01/2009 - AOS package delivered to USCIS Chicago Lockbox

06/05/2009 - received NOA1 hardcopy for EAD and AOS day 7

06/10/2009 - check cashed :)

06/15/2009 - received Biometrics Appointment Letter (notice date 07/02/2009) day 16

07/02/2009 - biometrics done (waiting for next asc appointment notice) day 33

7/06/2009 - touched i-485 and i-765

7/10/2009 - EAD CARD PRODUCTION ORDERED

7/13/2009 - EAD touched

7/16/2009 - EAD CARD PRODUCTION ORDERED

7/16/2009 - EAD APPROVAL NOTICE SENT

7/17/2009 - notice for AOS interview received

7/18/2009 - EAD CARD RECEIVED took only 8 days :)

8/18/2009 - AOS touched

8/20/2009 - AOS INTERVIEW 11am, CHULA VUSTA, CA APPROVED!!!!!!!!!!!!

8/25/2009 - AOS CARD PRODUCTION ORDERED

9/02/2009 - PERMANENT RESIDENT CARD received!!!!!!!!!!!!!!!!!!!!!!!!!!!

GOD IS GREAT ALL THE TIME...

AOS approved in 82 days (2 mos and 22 days) from the filing date. :)

Filed: K-1 Visa Country: Philippines
Timeline
Posted (edited)
Hi! Same here...PJ of NSo told me that my name is common (Catherine) so verification will take 2-3 wks daw. He told me that July 14 and 21 when I kept caling them for follow-up since NSO releases DV results to Embassy every Friday. I paid my DV June 26, I got interviewed July 3, and my DV was done Aug 1. Now Embassy told my husband that they already received my DV from NSO on Aug 4. And Aug 5 the Consular Officer started reviewing again my docs, and it will take 2weeks, HMP!!! So I'm now stuck waiting...waiting...waiting...and still waiting....What a long WAIT!!! :bonk::help::angry:

wow cooky 2 weeks for consular review its that for 1 person only all for all the papers they got wow.. that took so long ha! waahhhhh

Edited by higantetingting

2_823350812l.jpg

K-1 Visa

Event Date

Service Center :..............Vermont Service Center

Consulate :......................Manilla, Philipines

anniversary .....................Dec 25, 2006

gary went to phil...............October 8,2007

engagement anniversary...October 14,2007 gary proposed at basket ball court lot of people sooo sweet...

gary went back to tx.........October 19, 2007

I-129F Sent : ...................2008-03-22

I-129F NOA1 : ..................2008-03-27

I-129F NOA2 : ..................2008-06-20

NVC Received : ................2008-06-30

Interview Date : ...............2008-08-01

Visa Received : ................2008-08-20

US Entry : ....................... 2008-08-26

Marriage : ........................2008-08-26

biometrics:........................2008-12-20

green card received...........2009-06-04

Comments : I-129F TOUCHED APRIL 18, 2008. TOUCHED AND APPROVED

JUNE 20, 2008. TOUCHED JUNE 23, 2008.

RECIEVED LETTER FROM NVC ON JULY 3, 2008 DATED JUNE 30, 2008

SAYING NVC RECENTLY RECIEVED 1-129. AUTOMATED PHONE STILL SAYING

NO RECORD.

Processing

Estimates/Stats : Your I-129f was approved in 90 days from your filing date.

Filed: K-1 Visa Country: Philippines
Timeline
Posted
Hi! Same here...PJ of NSo told me that my name is common (Catherine) so verification will take 2-3 wks daw. He told me that July 14 and 21 when I kept caling them for follow-up since NSO releases DV results to Embassy every Friday. I paid my DV June 26, I got interviewed July 3, and my DV was done Aug 1. Now Embassy told my husband that they already received my DV from NSO on Aug 4. And Aug 5 the Consular Officer started reviewing again my docs, and it will take 2weeks, HMP!!! So I'm now stuck waiting...waiting...waiting...and still waiting....What a long WAIT!!! :bonk::help::angry:

wow cooky 2 weeks for consular review its that for 1 person only all for all the papers they got wow.. that took so long ha! waahhhhh

I talked yesterday Pj and he said the results of mine was going to pick up by the representative of USEM...Hope it is.. :innocent:

1919m3v26vlf5u.gif

--------------------

01-25-2008 =I-129f sent to CSC

01-28-2008 = CSC recieved petition

02-05-2006 =Noa1

06-02-2008 =touched

06-03-2008 =touched

06-10-2008 = NOA2

06-17-2008 = NVC harcdcopy

07-03-2008 = medical (passed)

07-09-2008- Paid DV

07-16-2008 - DV Forward to NSO

08-05-2008= Interview

08-20-2008 = visa printed

08-21-2008 = VISA ON HAND ( my birthday too)

09-02-2008- flight to USA

10-18- 2008= wedding

Filed: K-3 Visa Country: Philippines
Timeline
Posted
Hi! Same here...PJ of NSo told me that my name is common (Catherine) so verification will take 2-3 wks daw. He told me that July 14 and 21 when I kept caling them for follow-up since NSO releases DV results to Embassy every Friday. I paid my DV June 26, I got interviewed July 3, and my DV was done Aug 1. Now Embassy told my husband that they already received my DV from NSO on Aug 4. And Aug 5 the Consular Officer started reviewing again my docs, and it will take 2weeks, HMP!!! So I'm now stuck waiting...waiting...waiting...and still waiting....What a long WAIT!!! :bonk::help::angry:

wow cooky 2 weeks for consular review its that for 1 person only all for all the papers they got wow.. that took so long ha! waahhhhh

I talked yesterday Pj and he said the results of mine was going to pick up by the representative of USEM...Hope it is.. :innocent:

wow! sana nga sis! sana din kasabay na yung sakin dun sayo hehehe :thumbs:

K-3 Visa

Marriage : 2007-12-05

I-130 Sent : 2008-01-15

Packet 4 Received : 2008-07-17

Interview Date : 2008-08-05

Visa Received : AUGUST 29,2008 VISA ON HAND!!!!!!!!!!!!

US Entry : DECEMBER 26 2008 POE-LAX

m_825bdb5ca8a44b0997b81e1c36d0c59c.jpg

AOS and EAD

05/30/2009 - sent AOS package to USCIS Chicago Lockbox via USPS Express Mail day 1

06/01/2009 - AOS package delivered to USCIS Chicago Lockbox

06/05/2009 - received NOA1 hardcopy for EAD and AOS day 7

06/10/2009 - check cashed :)

06/15/2009 - received Biometrics Appointment Letter (notice date 07/02/2009) day 16

07/02/2009 - biometrics done (waiting for next asc appointment notice) day 33

7/06/2009 - touched i-485 and i-765

7/10/2009 - EAD CARD PRODUCTION ORDERED

7/13/2009 - EAD touched

7/16/2009 - EAD CARD PRODUCTION ORDERED

7/16/2009 - EAD APPROVAL NOTICE SENT

7/17/2009 - notice for AOS interview received

7/18/2009 - EAD CARD RECEIVED took only 8 days :)

8/18/2009 - AOS touched

8/20/2009 - AOS INTERVIEW 11am, CHULA VUSTA, CA APPROVED!!!!!!!!!!!!

8/25/2009 - AOS CARD PRODUCTION ORDERED

9/02/2009 - PERMANENT RESIDENT CARD received!!!!!!!!!!!!!!!!!!!!!!!!!!!

GOD IS GREAT ALL THE TIME...

AOS approved in 82 days (2 mos and 22 days) from the filing date. :)

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...