Jump to content
melusine

AOS filers - July 2008

 Share

1,748 posts in this topic

Recommended Posts

Filed: AOS (pnd) Country: Philippines
Timeline
omgomgomg!!!! FINALLY!!! :) hehe soo happy

Application Type: I765, APPLICATION FOR EMPLOYMENT AUTHORIZATION

Current Status: Card production ordered.

On November 20, 2008, we ordered production of your new card. Please allow 30 days for your card to be mailed to you. If we need something from you we will contact you. If you move before you receive the card, call customer service. You can also receive automatic e-mail updates as we process your case. Just follow the link below to register.

So how long did it take until you guys received yours?

congrats!

next, you'll receive a message that says, approval notice sent. roughly 10 days from the date of that notice, you should receive your ead card. :)

Link to comment
Share on other sites

  • Replies 1.7k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

Filed: K-1 Visa Country: Morocco
Timeline

My husbands EAD production was ordered on Nov. 19, 2008. Can anyone give us an estimate timeline that they'll send the Approval notice? We know of a job opening up in his field and he'd really like to apply for it. We're thinking about taking the chance and sending his resume next week for it. Thanks in advance!

10/11/07 Mailed I-129F to VSC

10/13/07 Delivered to VSC

10/22/07 Recieved packet in the mail. Check wrote wrong

10/22/07 Mailed I-129F back to VSC

10/24/07 NOA1 recieved in the mail. Dated Oct. 17th

10/29/07 New check finally cleared

10/25/07 New NOA1 issued

10/30/07 "Touched"

02/17/08 "Touched"

02/19/08 NOA2 issued

02/20/08 "Touched"

02/21/08 "Touched"

02/25/08 NVC receives petition

05/07/08 INTERVIEW DATE

6/9/08 Visa in Hand!!

6/11/08 Sweety's Arrival in US

07/03/08 Married

07/18/08 NOA 1 issued for AOS & EAD

08/12/08 Bio appnt.

08/08/08 RFE for AOS

10/14/08 AOS transferred to CSC

11/19/08 EAD production ordered

11/24/08 EAD arrived in mail

02/26/09 Welcome letter mailed

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline
My husbands EAD production was ordered on Nov. 19, 2008. Can anyone give us an estimate timeline that they'll send the Approval notice? We know of a job opening up in his field and he'd really like to apply for it. We're thinking about taking the chance and sending his resume next week for it. Thanks in advance!

My EAD card arrived 4 days after it was ordered. I'd apply for that job now. Some VJers have sent out resumes before their EAD was approved because it often takes a while to hear back about resumes. Even if you hear back right away, your husband can explain that he's work-authorized except that he just has to receive the EAD card that has been ordered. It'll probably have arrived by the time he gets to the interview stage. :)

K-1, AOS, ROC
2007, 2009, 2011

Naturalization

2016-05-17 - N-400 package sent

2016-05-21 - NOA1 (IOE receipt number)

2016-06-15 - Biometrics

2016-11-08 - Citizenship interview in Detroit: approved
2016-12-16 - Oath ceremony

Link to comment
Share on other sites

Filed: K-1 Visa Country: Morocco
Timeline
My husbands EAD production was ordered on Nov. 19, 2008. Can anyone give us an estimate timeline that they'll send the Approval notice? We know of a job opening up in his field and he'd really like to apply for it. We're thinking about taking the chance and sending his resume next week for it. Thanks in advance!

My EAD card arrived 4 days after it was ordered. I'd apply for that job now. Some VJers have sent out resumes before their EAD was approved because it often takes a while to hear back about resumes. Even if you hear back right away, your husband can explain that he's work-authorized except that he just has to receive the EAD card that has been ordered. It'll probably have arrived by the time he gets to the interview stage. :)

That is what I think too. I was just worried that he'd get to the interview stage and still not have the EAD. I don't want anything to look bad on his end due to the fact that their aren't a lot of jobs in his field where we live. I've looked at several timelines and they all seem to be fairly quick to receive the EAD card. Thanks for the reply :)

10/11/07 Mailed I-129F to VSC

10/13/07 Delivered to VSC

10/22/07 Recieved packet in the mail. Check wrote wrong

10/22/07 Mailed I-129F back to VSC

10/24/07 NOA1 recieved in the mail. Dated Oct. 17th

10/29/07 New check finally cleared

10/25/07 New NOA1 issued

10/30/07 "Touched"

02/17/08 "Touched"

02/19/08 NOA2 issued

02/20/08 "Touched"

02/21/08 "Touched"

02/25/08 NVC receives petition

05/07/08 INTERVIEW DATE

6/9/08 Visa in Hand!!

6/11/08 Sweety's Arrival in US

07/03/08 Married

07/18/08 NOA 1 issued for AOS & EAD

08/12/08 Bio appnt.

08/08/08 RFE for AOS

10/14/08 AOS transferred to CSC

11/19/08 EAD production ordered

11/24/08 EAD arrived in mail

02/26/09 Welcome letter mailed

Link to comment
Share on other sites

Filed: K-1 Visa Country: Morocco
Timeline

My husband received his EAD in the mail today finally!!! :dance: It was ordered on the 19th, so it didn't take long at all.

10/11/07 Mailed I-129F to VSC

10/13/07 Delivered to VSC

10/22/07 Recieved packet in the mail. Check wrote wrong

10/22/07 Mailed I-129F back to VSC

10/24/07 NOA1 recieved in the mail. Dated Oct. 17th

10/29/07 New check finally cleared

10/25/07 New NOA1 issued

10/30/07 "Touched"

02/17/08 "Touched"

02/19/08 NOA2 issued

02/20/08 "Touched"

02/21/08 "Touched"

02/25/08 NVC receives petition

05/07/08 INTERVIEW DATE

6/9/08 Visa in Hand!!

6/11/08 Sweety's Arrival in US

07/03/08 Married

07/18/08 NOA 1 issued for AOS & EAD

08/12/08 Bio appnt.

08/08/08 RFE for AOS

10/14/08 AOS transferred to CSC

11/19/08 EAD production ordered

11/24/08 EAD arrived in mail

02/26/09 Welcome letter mailed

Link to comment
Share on other sites

Filed: AOS (apr) Country: Philippines
Timeline
My husband received his EAD in the mail today finally!!! :dance: It was ordered on the 19th, so it didn't take long at all.

CONGRATS :dance::dance::dance:

USflag.gifr.gifi.gifc.gifh.gifo.gifphilippine_flag.gif

AOS & EAD TIMELINE:

July 21, 2008---(ORIGINAL) NOA1 for AOS & EAD

July 29, 2008---"WALK-IN" BIOMETRICS DONE (AOS & EAD-1)

Oct 14, 2008---EAD1 CARD ARRIVES! Approval date is Oct. 2, 2008

Dec 10, 2008---INTERVIEW DAY! APPROVED!!!

Dec 17, 2008---WELCOME NOTICE RECEIVED

Jan 9, 2009---CARD RECEIVED FINALLY! Approval date 12-10-08..expires on 12-10-10

REMOVAL OF CONDITIONS

Sept 10,2010---REMOVAL OF CONDITIONS

CITIZENSHIP

Sept 10,2011---Application for citizenship

.png

Link to comment
Share on other sites

Filed: K-1 Visa Country: Morocco
Timeline

Ok, so I know I may be getting ahead of myself here, but my husbands EAD will expire in 1 year. Do we have to apply again in a year? Or will they just issue a new card? I just assumed that the EAD would be good for 2 years like the AOS. Thanks!

10/11/07 Mailed I-129F to VSC

10/13/07 Delivered to VSC

10/22/07 Recieved packet in the mail. Check wrote wrong

10/22/07 Mailed I-129F back to VSC

10/24/07 NOA1 recieved in the mail. Dated Oct. 17th

10/29/07 New check finally cleared

10/25/07 New NOA1 issued

10/30/07 "Touched"

02/17/08 "Touched"

02/19/08 NOA2 issued

02/20/08 "Touched"

02/21/08 "Touched"

02/25/08 NVC receives petition

05/07/08 INTERVIEW DATE

6/9/08 Visa in Hand!!

6/11/08 Sweety's Arrival in US

07/03/08 Married

07/18/08 NOA 1 issued for AOS & EAD

08/12/08 Bio appnt.

08/08/08 RFE for AOS

10/14/08 AOS transferred to CSC

11/19/08 EAD production ordered

11/24/08 EAD arrived in mail

02/26/09 Welcome letter mailed

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: France
Timeline
Ok, so I know I may be getting ahead of myself here, but my husbands EAD will expire in 1 year. Do we have to apply again in a year? Or will they just issue a new card? I just assumed that the EAD would be good for 2 years like the AOS. Thanks!

He should have his greencard before it expires...there's no need for EAD once you have greencard, but iin the event that he still hasn't received greencard by the time EAD is soon to expire he has to apply to renew it they won't automatically issue one...

Greencard (2008):

July 16....AOS mailed;

July 17.......AOS received
July 21.......NOA1 receipt date

July 23.......Check Cashed
July 25.......Received NOA1

July 28.......Received Biometrics appointment
Aug 12.....received RFE notice

Aug 13...Biometrics Appointment

August 19...RFE received, case resumed processing
Oct. 8.........EAD Card production ordered

Oct. 16.......EAD Approval noticed mailed
Oct. 18........EAD in hand (came in mail)
Nov 3.........Interview Notice received in mail
Dec 4.........Interview APPROVED, CRIS email: card production ordered
Dec 9.........Welcome noticed received in mail Dec 9.........card production ordered
Dec 14.......Received greencard in mail

CITIZENSHIP (2014):
May 7...Application mailed out

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Saint Lucia
Timeline
Ok, so I know I may be getting ahead of myself here, but my husbands EAD will expire in 1 year. Do we have to apply again in a year? Or will they just issue a new card? I just assumed that the EAD would be good for 2 years like the AOS. Thanks!

Congrats! Usually the Ead is kept on the interview date because you don't need the EAD after you rec the Green Card.

I-130

07/21/08 Filed I-130 for Kids and myself

08/12/08 NOA

10/20/08 Rec approval for mine, notice in mail Kids rejected(no touches)

08/15/08 Sent out kids I 1-30 again

12/29/08 Kids I-130 touched

01/03/09 REceived approval letter for kids I-130

AOS And EAD

07/21/08 Sent out I-485/I-765

07/22/08 Package delivered

08/12/08 NOA (I-765 Rejected outdated form)

08/15/08 Sent out I-765

08/16/08 Package delivered

08/19/08 Biometrics letter for I-485 (Sept 2nd)

08/25/08 NOA for I-765

08/27/08 Biometrics letter for I-765 (sept 12th original date)

09/02/08 Bio for I-485 (did I-765 bio also)

09/18/08 I-485 visible online (rfe sent to me)

09/21/08 REc RFE letter (paystubs and job letter)

09/24/08 I-765 visible online

10/01/08 Sent out requested evidence

10/06/08 Package received

10/08/08 I-485 touched (evidence received, case resumed) 5:35pm

10/09/08 I-485 touched 12:30pm

10/13/08 I-485 touched 1:15pm

10/20/08 I-130 Approved

10/27/08 Rec EAD (No Updates on USCIS website)

10/27/08 EAD approved on USCIS LOL (after I received EAD)

10/28/08 Applied for SSN (Need to verify Authenticity of EAD)

10/31/08 USCIS verified authenticity of EAD, SS card ordered

11/04/08 WENT to SSA got letter with SS Number

11/04/08 Rec letter from SSA in Mail EAD verified

11/08/08 REC SS card in mail

11/13/08 Learners permit for driving

11/17/08 Interview Letter in mail

12/15/08 Touched

12/17/08 Interview 12:30 Approved

12/17/08 Received I-551 stamp

Link to comment
Share on other sites

Filed: K-1 Visa Country: Morocco
Timeline

Thank you. That makes more sense. I thought the EAD and the AOS would be 2 separate things. His AOS was transferred to CSC on 10/22, so I think we'll have that soon too. Thanks again!

10/11/07 Mailed I-129F to VSC

10/13/07 Delivered to VSC

10/22/07 Recieved packet in the mail. Check wrote wrong

10/22/07 Mailed I-129F back to VSC

10/24/07 NOA1 recieved in the mail. Dated Oct. 17th

10/29/07 New check finally cleared

10/25/07 New NOA1 issued

10/30/07 "Touched"

02/17/08 "Touched"

02/19/08 NOA2 issued

02/20/08 "Touched"

02/21/08 "Touched"

02/25/08 NVC receives petition

05/07/08 INTERVIEW DATE

6/9/08 Visa in Hand!!

6/11/08 Sweety's Arrival in US

07/03/08 Married

07/18/08 NOA 1 issued for AOS & EAD

08/12/08 Bio appnt.

08/08/08 RFE for AOS

10/14/08 AOS transferred to CSC

11/19/08 EAD production ordered

11/24/08 EAD arrived in mail

02/26/09 Welcome letter mailed

Link to comment
Share on other sites

Thank you. That makes more sense. I thought the EAD and the AOS would be 2 separate things. His AOS was transferred to CSC on 10/22, so I think we'll have that soon too. Thanks again!

Congtrats to you. Hope everything will go smoothly for you and Good Luck!

Its all for LOVE..

K1-JOURNEY

06/07/07 - I-129F Mailed.

01/10/08 - NOA2 hard copy received

01/18/08 - NVC forward to BKK Embassy

02/12/08 - Police records obtained

03/01/08 - Mailed Packet 3 back via EMS mail.

04/02/08 - Packet 4 received

04/23/08 - Medical Exam.

06/03/08 - Interview PASSED!!

06/05/08 - Visa in hand

06/14/08 - POE SFO

08/14/08 - MARRIED

AOS-JOURNEY

11/17/08 - AOS Packet Mailed.

11/19/08 - Packet delivered.

12/01/08 - NOA received for EAD and AOS dated 11/26

01/06/09 - Placed SR for no Biometric.

01/10/09 - Biometric 01/23/09

02/23/09 - EAD card received

03/23/09 - AOS interview 04/22/09

04/22/09 - Interview AOS approved!

05/04/09 - GREEN CARD RECEIVED!

LOC-JOURNEY

01/26/11 - I-751 Mailed.

04/18/11 - GREEN CARD RECEIVED!

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: France
Timeline

I haven't checked my status online since receiving interveiw letter and was just curious today to see if anything changed (although I knew it most likely won't) and noticed my AOS was touched on Nov 21 (friday)...I'm guessing my file finally landed on the interviewer's desk hehehe :whistle::thumbs:

Greencard (2008):

July 16....AOS mailed;

July 17.......AOS received
July 21.......NOA1 receipt date

July 23.......Check Cashed
July 25.......Received NOA1

July 28.......Received Biometrics appointment
Aug 12.....received RFE notice

Aug 13...Biometrics Appointment

August 19...RFE received, case resumed processing
Oct. 8.........EAD Card production ordered

Oct. 16.......EAD Approval noticed mailed
Oct. 18........EAD in hand (came in mail)
Nov 3.........Interview Notice received in mail
Dec 4.........Interview APPROVED, CRIS email: card production ordered
Dec 9.........Welcome noticed received in mail Dec 9.........card production ordered
Dec 14.......Received greencard in mail

CITIZENSHIP (2014):
May 7...Application mailed out

Link to comment
Share on other sites

Filed: AOS (apr) Country: Philippines
Timeline
I haven't checked my status online since receiving interveiw letter and was just curious today to see if anything changed (although I knew it most likely won't) and noticed my AOS was touched on Nov 21 (friday)...I'm guessing my file finally landed on the interviewer's desk hehehe :whistle::thumbs:

Hehe Maybe so :thumbs: I looked mine and it was not updated..I hope he/she touch me too :star: Interviews are near good luck and God bless to us :dance:

USflag.gifr.gifi.gifc.gifh.gifo.gifphilippine_flag.gif

AOS & EAD TIMELINE:

July 21, 2008---(ORIGINAL) NOA1 for AOS & EAD

July 29, 2008---"WALK-IN" BIOMETRICS DONE (AOS & EAD-1)

Oct 14, 2008---EAD1 CARD ARRIVES! Approval date is Oct. 2, 2008

Dec 10, 2008---INTERVIEW DAY! APPROVED!!!

Dec 17, 2008---WELCOME NOTICE RECEIVED

Jan 9, 2009---CARD RECEIVED FINALLY! Approval date 12-10-08..expires on 12-10-10

REMOVAL OF CONDITIONS

Sept 10,2010---REMOVAL OF CONDITIONS

CITIZENSHIP

Sept 10,2011---Application for citizenship

.png

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: France
Timeline
I haven't checked my status online since receiving interveiw letter and was just curious today to see if anything changed (although I knew it most likely won't) and noticed my AOS was touched on Nov 21 (friday)...I'm guessing my file finally landed on the interviewer's desk hehehe :whistle::thumbs:

Hehe Maybe so :thumbs: I looked mine and it was not updated..I hope he/she touch me too :star: Interviews are near good luck and God bless to us :dance:

HEHEHE the information says the same thing since august (after they received RFE back) just the Last updated date changed...yours will probably get touched closer to your iinterview date too so don't worry... :thumbs:

Greencard (2008):

July 16....AOS mailed;

July 17.......AOS received
July 21.......NOA1 receipt date

July 23.......Check Cashed
July 25.......Received NOA1

July 28.......Received Biometrics appointment
Aug 12.....received RFE notice

Aug 13...Biometrics Appointment

August 19...RFE received, case resumed processing
Oct. 8.........EAD Card production ordered

Oct. 16.......EAD Approval noticed mailed
Oct. 18........EAD in hand (came in mail)
Nov 3.........Interview Notice received in mail
Dec 4.........Interview APPROVED, CRIS email: card production ordered
Dec 9.........Welcome noticed received in mail Dec 9.........card production ordered
Dec 14.......Received greencard in mail

CITIZENSHIP (2014):
May 7...Application mailed out

Link to comment
Share on other sites

Filed: AOS (apr) Country: Sweden
Timeline

Mine is just like yours Keweul. A touch shortly after getting the interview letter.

14 days and counting!

AOS Timeline:

7/928 2008 - Mailed packet (I-130, I-485 & I-765)

7/31 2008 - Packet arrives at the Chicago lockbox

8/07 2008 - Checks cashed

8/08 2008 - NOA Received (I-130 & I-485)

8/08 2008 - Application Rejection Letter received for I-765 (Outdated form that expires 08/31/08!!!)

8/11 2008 - Biometrics Notification for August 28th

8/14 2008 - New I-765 received by V. Bustamente

8/18 2008 - Tried a walk-in Biometrics but office closed(!!)

8/19 2008 - CRIS email. RFE #1

8/23 2008 - RFE Letter. Birth Certificate (wth?!?)

9/09 2008 - NOA for I-765 received

9/12 2008 - EAD Biometrics notice for 9/29

9/16 2008 - CRIS email. RFE received on 9/11 and case resumed.

9/26 2008 - EAD Biometrics completed and touched online.

11/07 2008 - EAD Card production ordered.

11/08 2008 - Interview Notice for December 09th.

11/20 2008 - EAD arrived in mailbox and work resumed.

12/09 2008 - Interview. AOS approved and card production ordered.

12/10 2008 - AOS Touched.

12/12 2008 - AOS Touched again.

12/15 2008 - AOS Touched a third time (which usually means the card is in the mail! Hurray!)

-----------------------------------------------------------------------

N-400 Timeline:

8/23 2020 - N-400 Application NOA Received

12/30 2020 - Interview Scheduled

2/9 - Interview. N-400 approved

2/9 - Oath Ceremony 

-----------------------------------------------------------------------

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
“;}
×
×
  • Create New...