Filed: IR-1/CR-1 Visa Country: India
Timeline

Does Anyone have any idea when VSC will start to work on family petitions???

Its getting frustrated. Anyone???? Any clue??? :blink:

Received at VSC: Jan 2,08

NOA1: Feb6, 08

9/23/08: Approved

9/30/08: Case # received

10/06/08: E-mailed ds3032

10/08/08: Mailed ds3032

10/09/08: Signed by R.Austin

10/08/08: Paid AOS/IV bill online

10/09/08: Status shows paid online

10/09/08: Accepted ds3032

10/10/08: Express mailed AOS/IV package

10/14/08: NVC received AOS and IV Package

10/21/08: Case Complete (22Days, no RFEs)

12/02/08: Medical....Passed....

12/11/08: Interview passed, received VISA.....YAhhhhhhhhhh

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Colombia
Timeline

If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

CR-1

02/05/07 - I-130 sent to NSC

05/03/07 - NOA2

05/10/07 - NVC receives petition, case # assigned

08/08/07 - Case Complete

09/27/07 - Interview, visa granted

10/02/07 - POE

11/16/07 - Received green card and Welcome to America letter in the mail

Removing Conditions

07/06/09 - I-751 sent to CSC

08/14/09 - Biometrics

09/27/09 - Approved

10/01/09 - Received 10 year green card

U.S. Citizenship

03/30/11 - N-400 sent via Priority Mail w/ delivery confirmation

05/12/11 - Biometrics

07/20/11 - Interview - passed

07/20/11 - Oath ceremony - same day as interview

Link to comment
Share on other sites

Filed: Country: Russia
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Here is my story. I've lived problem free life, payed my taxes. One day I decided to marry this girl. But to do so would require her to come to US of A, and so it started. My problem free live turned in to free problems from USCIS! Sure things turned to unsure, certain dates turned to aproximation within months. All logical thinking was out the door, as I filed my papers withing famous Vermont Centre!

I-130 Received

12-12-07

I-130 Approved

8-28-2008

NVC

Date Package Received By NVC : 09-05-08

-- Received DS-3032 / I-864 Bill : 09-11-08

-- Pay I-864 Bill :09-11-08

-- Receive I-864 Package :09-15-08

-- Return I-864 Package :09-16-08

-- Return Completed DS-3032 :09-11-08

-- Receive IV Bill :09-17-2008

-- Pay IV Bill :09-17-2008

-- Receive Instruction Package :09-17-08

-- Case Completed at NVC :10-16-08

Date Package Left From NVC :10-31-08

Date Received By Consulate :11-05-08

Date Rec Instructions (Pkt 3) :11-05-08

Date Complete Instructions (Pkt 3) :11-05-08

Date Rec Appointment Letter (Pkt 4):11-25-08

Interview Date (IR-1/CR-1 Visa):12/08/08

Date IR-1/CR-1 Visa Received :12-11-08

Date of US Entry :12-17-08

Link to comment
Share on other sites

If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Oh boy, they are quick, 2009 mine will probley be 2010 of July

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Received at VSC: Jan 2,08

NOA1: Feb6, 08

9/23/08: Approved

9/30/08: Case # received

10/06/08: E-mailed ds3032

10/08/08: Mailed ds3032

10/09/08: Signed by R.Austin

10/08/08: Paid AOS/IV bill online

10/09/08: Status shows paid online

10/09/08: Accepted ds3032

10/10/08: Express mailed AOS/IV package

10/14/08: NVC received AOS and IV Package

10/21/08: Case Complete (22Days, no RFEs)

12/02/08: Medical....Passed....

12/11/08: Interview passed, received VISA.....YAhhhhhhhhhh

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

10-12-07 -mailed i130 to VSC

10-16-07- received by VSC

1-11-08- i130 NOA1

2-24-08-view case online

4-19-08- i130 NOA2

4-24-08- NOA2 hardcopy received

4-24-08- NVC CASE #ASSIGNED MDR

5-04-08- EMAILED CHOICE OF AGENT TO NVC

5-05-08- DS3032 AND AOS fee bill was generated today

5-05-08- paid AOS fee bill $70 online

5-07-08- AOS FEE now says PAID online, can print cover sht.

5-07-08*cald NVC and msg says AOS $recvd

5-12-08-DS3032 EMAIL Accepted

5-13-08*cald NVC and msg now says DS3032 choice of agent has been received.

5-13-08-mailed AOS i864 packet w/printed cover sheet from online payment (certified mail- priority)

5-15-08-AOS packet received by NVC

5-18-08 iv FEE bill invoiced

5-18-08 iv fee $400 paid online

5-20-08-iv fee cleared, able to print covr shet online

5-21-08-mailed DS230 packet to NVC via priority mail

5-29-08 aos ACCEPTED

5-29-08- DS 230 entered in system

6-3-08-cse cmplte.

6-11-08 case left NVC to chennai via DHL

6-16-08 case reached chennai

7-2-08 appt letter received by beneficiary

7-4-08 medical done in chennai

7-28-08 interview- AP for 4-6 weeks (awaiting name chk clearance-told by chenai operator)

8-20-08 chennai forwarded file to DOS- according to inquiry from congressmans office

(also confirmed by DOS)

8-28-08 file reached DOS- told by operator

9-2-08- last update to case,told by DOS

12-12-08 emailed chennai embassy asking status of our case, and got email to send passport..

12-15-08 submitted passport to vfs

12-19-08 VISA ISSUED! in hand!

12-25-08 hubbys arrival! smooth POE!

1-16-09 green card arrives

1-27-09 SSN card in mail

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

What's up Hyd ? Did you hear magic words - CASE COMPLETE - as Rajee told us :star:

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

What's up Hyd ? Did you hear magic words - CASE COMPLETE - as Rajee told us :star:

WATTT rajee got case complete??

i didnt get it yettt :( no YAYA for me :angry:

10-12-07 -mailed i130 to VSC

10-16-07- received by VSC

1-11-08- i130 NOA1

2-24-08-view case online

4-19-08- i130 NOA2

4-24-08- NOA2 hardcopy received

4-24-08- NVC CASE #ASSIGNED MDR

5-04-08- EMAILED CHOICE OF AGENT TO NVC

5-05-08- DS3032 AND AOS fee bill was generated today

5-05-08- paid AOS fee bill $70 online

5-07-08- AOS FEE now says PAID online, can print cover sht.

5-07-08*cald NVC and msg says AOS $recvd

5-12-08-DS3032 EMAIL Accepted

5-13-08*cald NVC and msg now says DS3032 choice of agent has been received.

5-13-08-mailed AOS i864 packet w/printed cover sheet from online payment (certified mail- priority)

5-15-08-AOS packet received by NVC

5-18-08 iv FEE bill invoiced

5-18-08 iv fee $400 paid online

5-20-08-iv fee cleared, able to print covr shet online

5-21-08-mailed DS230 packet to NVC via priority mail

5-29-08 aos ACCEPTED

5-29-08- DS 230 entered in system

6-3-08-cse cmplte.

6-11-08 case left NVC to chennai via DHL

6-16-08 case reached chennai

7-2-08 appt letter received by beneficiary

7-4-08 medical done in chennai

7-28-08 interview- AP for 4-6 weeks (awaiting name chk clearance-told by chenai operator)

8-20-08 chennai forwarded file to DOS- according to inquiry from congressmans office

(also confirmed by DOS)

8-28-08 file reached DOS- told by operator

9-2-08- last update to case,told by DOS

12-12-08 emailed chennai embassy asking status of our case, and got email to send passport..

12-15-08 submitted passport to vfs

12-19-08 VISA ISSUED! in hand!

12-25-08 hubbys arrival! smooth POE!

1-16-09 green card arrives

1-27-09 SSN card in mail

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

What's up Hyd ? Did you hear magic words - CASE COMPLETE - as Rajee told us :star:

WATTT rajee got case complete??

i didnt get it yettt :( no YAYA for me :angry:

Hyd, Rajee told when will we hear the magic words "CASE COMPLETE" :star:

Don't get panic now, Hyd :star:

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

What's up Hyd ? Did you hear magic words - CASE COMPLETE - as Rajee told us :star:

WATTT rajee got case complete??

i didnt get it yettt :( no YAYA for me :angry:

Hyd, Rajee told when will we hear the magic words "CASE COMPLETE" :star:

Don't get panic now, Hyd :star:

LOL gosh.. i think im havin a rough day at work!!!!

10-12-07 -mailed i130 to VSC

10-16-07- received by VSC

1-11-08- i130 NOA1

2-24-08-view case online

4-19-08- i130 NOA2

4-24-08- NOA2 hardcopy received

4-24-08- NVC CASE #ASSIGNED MDR

5-04-08- EMAILED CHOICE OF AGENT TO NVC

5-05-08- DS3032 AND AOS fee bill was generated today

5-05-08- paid AOS fee bill $70 online

5-07-08- AOS FEE now says PAID online, can print cover sht.

5-07-08*cald NVC and msg says AOS $recvd

5-12-08-DS3032 EMAIL Accepted

5-13-08*cald NVC and msg now says DS3032 choice of agent has been received.

5-13-08-mailed AOS i864 packet w/printed cover sheet from online payment (certified mail- priority)

5-15-08-AOS packet received by NVC

5-18-08 iv FEE bill invoiced

5-18-08 iv fee $400 paid online

5-20-08-iv fee cleared, able to print covr shet online

5-21-08-mailed DS230 packet to NVC via priority mail

5-29-08 aos ACCEPTED

5-29-08- DS 230 entered in system

6-3-08-cse cmplte.

6-11-08 case left NVC to chennai via DHL

6-16-08 case reached chennai

7-2-08 appt letter received by beneficiary

7-4-08 medical done in chennai

7-28-08 interview- AP for 4-6 weeks (awaiting name chk clearance-told by chenai operator)

8-20-08 chennai forwarded file to DOS- according to inquiry from congressmans office

(also confirmed by DOS)

8-28-08 file reached DOS- told by operator

9-2-08- last update to case,told by DOS

12-12-08 emailed chennai embassy asking status of our case, and got email to send passport..

12-15-08 submitted passport to vfs

12-19-08 VISA ISSUED! in hand!

12-25-08 hubbys arrival! smooth POE!

1-16-09 green card arrives

1-27-09 SSN card in mail

Link to comment
Share on other sites

If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

What's up Hyd ? Did you hear magic words - CASE COMPLETE - as Rajee told us :star:

WATTT rajee got case complete??

i didnt get it yettt :( no YAYA for me :angry:

Hyd, Rajee told when will we hear the magic words "CASE COMPLETE" :star:

Don't get panic now, Hyd :star:

LOL gosh.. i think im havin a rough day at work!!!!

That makes 2 of us today Hyd having a bad work day.

Hang in there, its almost time to go home.

Paris Heart

Truly happy!!!

New life, new adventures, and a new attitude.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
If you go to Immigration Timelines and do a timeline search you can see that the VSC is taking between 4-7 months to process CR1/IR1 visa petitions so you might get an NOA2 by the end of June or July if everything is in order.

Good luck!

Diana

Yeah with the pace they are going at its going to be June, July of 09

Iyla and Paris......you guys are so funny. I need to talk to guys everytday to get my mind off VSC.

Thank You

But seriously,any idea???

Reehon, nobody knows what's happening inside USCIS :devil: It is a blackbox - we input application (most imporant is the fee :star: ) and one day it will spit out with error (RFE) or success (approval) :star::star::star: This dept. has to be completely revamped :star:

lol LOTO U R TOO FUNNY..

HANG IN THERE vsc PPL.. I WAS IN THE SAME BOAT AS YALL TOO WHEN UNEXPECTANTLY I GOT MY APPROVAL.. I SAW K3 APPROVALS TOO FROM vsc TWO OF THEM.. MAYBE THEY R BACK ON TRACK WITH BACKLOG PPL...

WE ALL R WITH U

What's up Hyd ? Did you hear magic words - CASE COMPLETE - as Rajee told us :star:

WATTT rajee got case complete??

i didnt get it yettt :( no YAYA for me :angry:

Hyd, Rajee told when will we hear the magic words "CASE COMPLETE" :star:

Don't get panic now, Hyd :star:

LOL gosh.. i think im havin a rough day at work!!!!

That makes 2 of us today Hyd having a bad work day.

Hang in there, its almost time to go home.

Paris Heart

LOL ya almost time to go home about 3 more hoursss!! and im outa here... too much work...

geezzz

10-12-07 -mailed i130 to VSC

10-16-07- received by VSC

1-11-08- i130 NOA1

2-24-08-view case online

4-19-08- i130 NOA2

4-24-08- NOA2 hardcopy received

4-24-08- NVC CASE #ASSIGNED MDR

5-04-08- EMAILED CHOICE OF AGENT TO NVC

5-05-08- DS3032 AND AOS fee bill was generated today

5-05-08- paid AOS fee bill $70 online

5-07-08- AOS FEE now says PAID online, can print cover sht.

5-07-08*cald NVC and msg says AOS $recvd

5-12-08-DS3032 EMAIL Accepted

5-13-08*cald NVC and msg now says DS3032 choice of agent has been received.

5-13-08-mailed AOS i864 packet w/printed cover sheet from online payment (certified mail- priority)

5-15-08-AOS packet received by NVC

5-18-08 iv FEE bill invoiced

5-18-08 iv fee $400 paid online

5-20-08-iv fee cleared, able to print covr shet online

5-21-08-mailed DS230 packet to NVC via priority mail

5-29-08 aos ACCEPTED

5-29-08- DS 230 entered in system

6-3-08-cse cmplte.

6-11-08 case left NVC to chennai via DHL

6-16-08 case reached chennai

7-2-08 appt letter received by beneficiary

7-4-08 medical done in chennai

7-28-08 interview- AP for 4-6 weeks (awaiting name chk clearance-told by chenai operator)

8-20-08 chennai forwarded file to DOS- according to inquiry from congressmans office

(also confirmed by DOS)

8-28-08 file reached DOS- told by operator

9-2-08- last update to case,told by DOS

12-12-08 emailed chennai embassy asking status of our case, and got email to send passport..

12-15-08 submitted passport to vfs

12-19-08 VISA ISSUED! in hand!

12-25-08 hubbys arrival! smooth POE!

1-16-09 green card arrives

1-27-09 SSN card in mail

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...