Hi all......Have you noticed that VSC have not approved I-130 and I-129F (K3) for a while now? It looks from other posts and timelines that they are focusing their resources on K1 visas instead. Maybe they are waiting for CSC to catch up with them since CSC has been approving many I-130's and K3 lately!!!

Your thoughts??

I-130:

09-27-2007 Sent

01-07-2008 NOA1

02-24-2008 Touched

03-05-2008 Touched

03-06-2008 Touched

03-24-2008 Touched

03-24-2008 APPROVED

03-25-2008 Touched

I-129F

01-13-2008 Sent

01-16-2008 NOA1

02-24-2008 Touched

03-25-2008 Touched

NVC

03-27-2008 Received and Case# assigned

04-07-2008 DS-3032 and AOS bill generated

04-08-2008 DS-3032 Email sent

04-14-2008 DS-3032 Email accepted

04-16-2008 Paid AOS Bill online

04-18-2008 AOS Payment cleared & accepted by NVC

04-20-2008 Paid IV Bill online

04-21-2008 AOS I-864 cover sheet document generated online

04-21-2008 Sent AOS I-864 Package to NVC

04-22-2008 IV Bill cleared & accepted by NVC

04-22-2008 DS-230 cover sheet document generated online

05-08-2008 DS-230 package sent to NVC

05-15-2008 RFE Need a Palestinian Police certificate in addition to the Israeli Police certificate

06-04-2008 Palestinian Police certificate deliverd to NVC

06-05-2008 CASE COMPLETED

06-10-2008 Case forwarded to Consulate

Jerusalem Consulate

06-16-2008 Medical Appointment/done

07-01-2008 Interview Date

08-03-2008 Me flying to Jerusalem :)

08-28-2008 Arrival at Chicago ORD International

Posted
Well you would think that CSC would try and let VSC catch up to them! I think there have been a few approvals but not much from VSC.

Well lets just hang in tight.....

Your timeline is close to mine. I also got touched on 3/5 and 3/6...............but I am not sure if that is a good thing or not!

I-130:

09-27-2007 Sent

01-07-2008 NOA1

02-24-2008 Touched

03-05-2008 Touched

03-06-2008 Touched

03-24-2008 Touched

03-24-2008 APPROVED

03-25-2008 Touched

I-129F

01-13-2008 Sent

01-16-2008 NOA1

02-24-2008 Touched

03-25-2008 Touched

NVC

03-27-2008 Received and Case# assigned

04-07-2008 DS-3032 and AOS bill generated

04-08-2008 DS-3032 Email sent

04-14-2008 DS-3032 Email accepted

04-16-2008 Paid AOS Bill online

04-18-2008 AOS Payment cleared & accepted by NVC

04-20-2008 Paid IV Bill online

04-21-2008 AOS I-864 cover sheet document generated online

04-21-2008 Sent AOS I-864 Package to NVC

04-22-2008 IV Bill cleared & accepted by NVC

04-22-2008 DS-230 cover sheet document generated online

05-08-2008 DS-230 package sent to NVC

05-15-2008 RFE Need a Palestinian Police certificate in addition to the Israeli Police certificate

06-04-2008 Palestinian Police certificate deliverd to NVC

06-05-2008 CASE COMPLETED

06-10-2008 Case forwarded to Consulate

Jerusalem Consulate

06-16-2008 Medical Appointment/done

07-01-2008 Interview Date

08-03-2008 Me flying to Jerusalem :)

08-28-2008 Arrival at Chicago ORD International

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
Hi all......Have you noticed that VSC have not approved I-130 and I-129F (K3) for a while now? It looks from other posts and timelines that they are focusing their resources on K1 visas instead. Maybe they are waiting for CSC to catch up with them since CSC has been approving many I-130's and K3 lately!!!

Your thoughts??

hey guys i knowwww VSC has been approving k1's onlY!!!! im soo anxious to see something for me.. havent heard anything.. i think after they r thru with cathcin up on k1's our approvals will come fast, one after another!

10-12-07 -mailed i130 to VSC

10-16-07- received by VSC

1-11-08- i130 NOA1

2-24-08-view case online

4-19-08- i130 NOA2

4-24-08- NOA2 hardcopy received

4-24-08- NVC CASE #ASSIGNED MDR

5-04-08- EMAILED CHOICE OF AGENT TO NVC

5-05-08- DS3032 AND AOS fee bill was generated today

5-05-08- paid AOS fee bill $70 online

5-07-08- AOS FEE now says PAID online, can print cover sht.

5-07-08*cald NVC and msg says AOS $recvd

5-12-08-DS3032 EMAIL Accepted

5-13-08*cald NVC and msg now says DS3032 choice of agent has been received.

5-13-08-mailed AOS i864 packet w/printed cover sheet from online payment (certified mail- priority)

5-15-08-AOS packet received by NVC

5-18-08 iv FEE bill invoiced

5-18-08 iv fee $400 paid online

5-20-08-iv fee cleared, able to print covr shet online

5-21-08-mailed DS230 packet to NVC via priority mail

5-29-08 aos ACCEPTED

5-29-08- DS 230 entered in system

6-3-08-cse cmplte.

6-11-08 case left NVC to chennai via DHL

6-16-08 case reached chennai

7-2-08 appt letter received by beneficiary

7-4-08 medical done in chennai

7-28-08 interview- AP for 4-6 weeks (awaiting name chk clearance-told by chenai operator)

8-20-08 chennai forwarded file to DOS- according to inquiry from congressmans office

(also confirmed by DOS)

8-28-08 file reached DOS- told by operator

9-2-08- last update to case,told by DOS

12-12-08 emailed chennai embassy asking status of our case, and got email to send passport..

12-15-08 submitted passport to vfs

12-19-08 VISA ISSUED! in hand!

12-25-08 hubbys arrival! smooth POE!

1-16-09 green card arrives

1-27-09 SSN card in mail

Filed: Timeline
Posted
Hi all......Have you noticed that VSC have not approved I-130 and I-129F (K3) for a while now? It looks from other posts and timelines that they are focusing their resources on K1 visas instead. Maybe they are waiting for CSC to catch up with them since CSC has been approving many I-130's and K3 lately!!!

Your thoughts??

hey guys i knowwww VSC has been approving k1's onlY!!!! im soo anxious to see something for me.. havent heard anything.. i think after they r thru with cathcin up on k1's our approvals will come fast, one after another!

I like this idea of VSC (when they're ready) giving our approvals fast, one after another, and I think that too ..... have you noticed that a lot of us going through VSC were all visible on the system on the same day ..... when I saw that, I envisioned mass approvals, when the time comes.

Filed: Timeline
Posted

I think so too, I beleive we are all going to get hit like we did with the receipts, so many went out in January February all one shot...hopefully the same happens with the NOA2's this month!!!!!!!! or beginnning of next not so bad, i guess.

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
Hi all......Have you noticed that VSC have not approved I-130 and I-129F (K3) for a while now? It looks from other posts and timelines that they are focusing their resources on K1 visas instead. Maybe they are waiting for CSC to catch up with them since CSC has been approving many I-130's and K3 lately!!!

Your thoughts??

hey guys i knowwww VSC has been approving k1's onlY!!!! im soo anxious to see something for me.. havent heard anything.. i think after they r thru with cathcin up on k1's our approvals will come fast, one after another!

I like this idea of VSC (when they're ready) giving our approvals fast, one after another, and I think that too ..... have you noticed that a lot of us going through VSC were all visible on the system on the same day ..... when I saw that, I envisioned mass approvals, when the time comes.

:angry::angry: When does that time come???? Does anyone knows any thoughts :unsure::unsure::blink::wacko::innocent:

11/25/07 Marriage

Vermont Service center

USCIS Journey CR1/IR1

01/06/08 Sent I-130

01/08/08 I-130 received at chicago lock box (USPS)

02/08/08 NOA1 Notice Date

02/12/08 Received NOA1 hardcopy

08/11/08 Received approval email (after 7 months and 3 days...Waiting)

08/15/08 Received NOA2 hardcopy

NVC Journey

08/13/08 NVC case# assigned

08/19/08 DS-3032 e mail sent and got auto response

08/20/08 Received IIN#(one nice rep gave me number)

08/22/08 paid I-864 bill online

08/23/08 I-864 bill status "PAID" online(saturday) but AVR message says " case number assigned ....blah

08/23/08 Printed out I-864 package online and Barcode sheet

08/25/08 I-864 package sent overnight

08/25/08 DS3032 Hardcopy sent by express mail (Hopefully they accept it ..But AVR says AOS fee received/paid on 08/23/08)

08/26/08 I-864 package received per USPS

08/28/08 I-864 package entered into NVC system

08/27/08 NVC accepted DS-3032 (But AVR does not say that)

08/28/08 IV bill generated ( still AVR does NOT say that) but online INVOICE says "NOT PAID"

08/28/08 IV bill paid online "IN PROCESS" status

08/29/08 IV bill "PAID" status (AVR says , they received DS3032)

08/29/08 DS-230 generated

09/02/08 DS-230 and required documents mailed

09/03/08 DS-230 form arrives at NVC per usps

09/04/08 DS-230 information entered into NVC system

09/15/08 CASE COMPLETE(32 days no RFE)

10/15/08 sent to consulate

11/10/08 Medical PASSED

11/18/08 Interview....VISA GRANTED ...

US..

11/29/08 ..POE at Houston

12/15/08 ..Welcome letter

12/16/08 ..SSN received

12/29/08 Green card received

Filed: Timeline
Posted
I think so too, I beleive we are all going to get hit like we did with the receipts, so many went out in January February all one shot...hopefully the same happens with the NOA2's this month!!!!!!!! or beginnning of next not so bad, i guess.

Yes, the NOA1's did all go out like a shot ..... maybe they're just looking at all of our piles of relationship proof, photos, letters etc ..... and plucking up the courage to just work round the clock and approve them all at once (I'm quite happy to send them a jar of coffee to support this effort :lol: ) ..... I think that when they really start, there will be a flood of NOA2's ... instead of the dribble we're getting at the moment.

Another train of thought is ..... they're letting CSC do a bunch and then VSC will do a bunch, that way the NVC isn't too clogged, which would delay us all once again when we get to the next stage.

Filed: Timeline
Posted
Hi all......Have you noticed that VSC have not approved I-130 and I-129F (K3) for a while now? It looks from other posts and timelines that they are focusing their resources on K1 visas instead. Maybe they are waiting for CSC to catch up with them since CSC has been approving many I-130's and K3 lately!!!

Your thoughts??

hey guys i knowwww VSC has been approving k1's onlY!!!! im soo anxious to see something for me.. havent heard anything.. i think after they r thru with cathcin up on k1's our approvals will come fast, one after another!

I like this idea of VSC (when they're ready) giving our approvals fast, one after another, and I think that too ..... have you noticed that a lot of us going through VSC were all visible on the system on the same day ..... when I saw that, I envisioned mass approvals, when the time comes.

:angry::angry: When does that time come???? Does anyone knows any thoughts :unsure::unsure::blink::wacko::innocent:

That would mean looking into the old crystal ball ..... my instincts are definately saying in a matter of weeks (maybe 8 - 10) ..... but not 6 months .... at least there is a dribble of approvals, which is better than nothing ..... plus there have been 2 November approvals (randomly) ...... I'll be very surprised if we turn out to be like the poor July/August filers and have to bring in the Senatorial 'heavies'.

Just hang in there guys ..... we're all frustrated with the slowness of this process ..... but it's going to happen .... soon.

Posted
I think so too, I beleive we are all going to get hit like we did with the receipts, so many went out in January February all one shot...hopefully the same happens with the NOA2's this month!!!!!!!! or beginnning of next not so bad, i guess.

Yes, the NOA1's did all go out like a shot ..... maybe they're just looking at all of our piles of relationship proof, photos, letters etc ..... and plucking up the courage to just work round the clock and approve them all at once (I'm quite happy to send them a jar of coffee to support this effort :lol: ) ..... I think that when they really start, there will be a flood of NOA2's ... instead of the dribble we're getting at the moment.

Another train of thought is ..... they're letting CSC do a bunch and then VSC will do a bunch, that way the NVC isn't too clogged, which would delay us all once again when we get to the next stage.

That is what I am also thinking, they are working the K1 since NVC only keeps it for couple of days and don't do much work with the k1s.

I-130:

09-27-2007 Sent

01-07-2008 NOA1

02-24-2008 Touched

03-05-2008 Touched

03-06-2008 Touched

03-24-2008 Touched

03-24-2008 APPROVED

03-25-2008 Touched

I-129F

01-13-2008 Sent

01-16-2008 NOA1

02-24-2008 Touched

03-25-2008 Touched

NVC

03-27-2008 Received and Case# assigned

04-07-2008 DS-3032 and AOS bill generated

04-08-2008 DS-3032 Email sent

04-14-2008 DS-3032 Email accepted

04-16-2008 Paid AOS Bill online

04-18-2008 AOS Payment cleared & accepted by NVC

04-20-2008 Paid IV Bill online

04-21-2008 AOS I-864 cover sheet document generated online

04-21-2008 Sent AOS I-864 Package to NVC

04-22-2008 IV Bill cleared & accepted by NVC

04-22-2008 DS-230 cover sheet document generated online

05-08-2008 DS-230 package sent to NVC

05-15-2008 RFE Need a Palestinian Police certificate in addition to the Israeli Police certificate

06-04-2008 Palestinian Police certificate deliverd to NVC

06-05-2008 CASE COMPLETED

06-10-2008 Case forwarded to Consulate

Jerusalem Consulate

06-16-2008 Medical Appointment/done

07-01-2008 Interview Date

08-03-2008 Me flying to Jerusalem :)

08-28-2008 Arrival at Chicago ORD International

Filed: Timeline
Posted
I think so too, I beleive we are all going to get hit like we did with the receipts, so many went out in January February all one shot...hopefully the same happens with the NOA2's this month!!!!!!!! or beginnning of next not so bad, i guess.

Yes, the NOA1's did all go out like a shot ..... maybe they're just looking at all of our piles of relationship proof, photos, letters etc ..... and plucking up the courage to just work round the clock and approve them all at once (I'm quite happy to send them a jar of coffee to support this effort :lol: ) ..... I think that when they really start, there will be a flood of NOA2's ... instead of the dribble we're getting at the moment.

Another train of thought is ..... they're letting CSC do a bunch and then VSC will do a bunch, that way the NVC isn't too clogged, which would delay us all once again when we get to the next stage.

That is what I am also thinking, they are working the K1 since NVC only keeps it for couple of days and don't do much work with the k1s.

Good thought, the service centres could be alternating between CR1/IR1's and K1's to keep the flow to the NVC bearable for them ..... do we know what's happening on the K1 front at CSC ? ..... are they slowing down on them or speeding up? ..... if they're speeding up, then the time could be coming for VSC to concentrate on our NOA2's .... this could be some form of logic for us at this unsure time.

The K1's do (generally) seem to get banged out quite quickly .... certainly an odd situation .... wish I hadn't got married now :jest: .... we'd be together sooner

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
Hi all......Have you noticed that VSC have not approved I-130 and I-129F (K3) for a while now? It looks from other posts and timelines that they are focusing their resources on K1 visas instead. Maybe they are waiting for CSC to catch up with them since CSC has been approving many I-130's and K3 lately!!!

Your thoughts??

hey guys i knowwww VSC has been approving k1's onlY!!!! im soo anxious to see something for me.. havent heard anything.. i think after they r thru with cathcin up on k1's our approvals will come fast, one after another!

I like this idea of VSC (when they're ready) giving our approvals fast, one after another, and I think that too ..... have you noticed that a lot of us going through VSC were all visible on the system on the same day ..... when I saw that, I envisioned mass approvals, when the time comes.

ya and most of us got noa1 right after another and were visible the same exact day and our k3 apps and i130s were paired the same day the 24th!! of feb!!! ihope they catch up soon.. every day is like a journey with uscis..

10-12-07 -mailed i130 to VSC

10-16-07- received by VSC

1-11-08- i130 NOA1

2-24-08-view case online

4-19-08- i130 NOA2

4-24-08- NOA2 hardcopy received

4-24-08- NVC CASE #ASSIGNED MDR

5-04-08- EMAILED CHOICE OF AGENT TO NVC

5-05-08- DS3032 AND AOS fee bill was generated today

5-05-08- paid AOS fee bill $70 online

5-07-08- AOS FEE now says PAID online, can print cover sht.

5-07-08*cald NVC and msg says AOS $recvd

5-12-08-DS3032 EMAIL Accepted

5-13-08*cald NVC and msg now says DS3032 choice of agent has been received.

5-13-08-mailed AOS i864 packet w/printed cover sheet from online payment (certified mail- priority)

5-15-08-AOS packet received by NVC

5-18-08 iv FEE bill invoiced

5-18-08 iv fee $400 paid online

5-20-08-iv fee cleared, able to print covr shet online

5-21-08-mailed DS230 packet to NVC via priority mail

5-29-08 aos ACCEPTED

5-29-08- DS 230 entered in system

6-3-08-cse cmplte.

6-11-08 case left NVC to chennai via DHL

6-16-08 case reached chennai

7-2-08 appt letter received by beneficiary

7-4-08 medical done in chennai

7-28-08 interview- AP for 4-6 weeks (awaiting name chk clearance-told by chenai operator)

8-20-08 chennai forwarded file to DOS- according to inquiry from congressmans office

(also confirmed by DOS)

8-28-08 file reached DOS- told by operator

9-2-08- last update to case,told by DOS

12-12-08 emailed chennai embassy asking status of our case, and got email to send passport..

12-15-08 submitted passport to vfs

12-19-08 VISA ISSUED! in hand!

12-25-08 hubbys arrival! smooth POE!

1-16-09 green card arrives

1-27-09 SSN card in mail

Posted
I think so too, I beleive we are all going to get hit like we did with the receipts, so many went out in January February all one shot...hopefully the same happens with the NOA2's this month!!!!!!!! or beginnning of next not so bad, i guess.

Yes, the NOA1's did all go out like a shot ..... maybe they're just looking at all of our piles of relationship proof, photos, letters etc ..... and plucking up the courage to just work round the clock and approve them all at once (I'm quite happy to send them a jar of coffee to support this effort :lol: ) ..... I think that when they really start, there will be a flood of NOA2's ... instead of the dribble we're getting at the moment.

Another train of thought is ..... they're letting CSC do a bunch and then VSC will do a bunch, that way the NVC isn't too clogged, which would delay us all once again when we get to the next stage.

That is what I am also thinking, they are working the K1 since NVC only keeps it for couple of days and don't do much work with the k1s.

Good thought, the service centres could be alternating between CR1/IR1's and K1's to keep the flow to the NVC bearable for them ..... do we know what's happening on the K1 front at CSC ? ..... are they slowing down on them or speeding up? ..... if they're speeding up, then the time could be coming for VSC to concentrate on our NOA2's .... this could be some form of logic for us at this unsure time.

The K1's do (generally) seem to get banged out quite quickly .... certainly an odd situation .... wish I hadn't got married now :jest: .... we'd be together sooner

From what i am noticing they are both approving many K-1, but it looks like VSC are lately approving late 2007 and ealry 2008 petitions, while CSC are mostly approving Sep-Dec of 2007 peitions for k-1. In short, VSC is ahead in their approvals of K1.

I-130:

09-27-2007 Sent

01-07-2008 NOA1

02-24-2008 Touched

03-05-2008 Touched

03-06-2008 Touched

03-24-2008 Touched

03-24-2008 APPROVED

03-25-2008 Touched

I-129F

01-13-2008 Sent

01-16-2008 NOA1

02-24-2008 Touched

03-25-2008 Touched

NVC

03-27-2008 Received and Case# assigned

04-07-2008 DS-3032 and AOS bill generated

04-08-2008 DS-3032 Email sent

04-14-2008 DS-3032 Email accepted

04-16-2008 Paid AOS Bill online

04-18-2008 AOS Payment cleared & accepted by NVC

04-20-2008 Paid IV Bill online

04-21-2008 AOS I-864 cover sheet document generated online

04-21-2008 Sent AOS I-864 Package to NVC

04-22-2008 IV Bill cleared & accepted by NVC

04-22-2008 DS-230 cover sheet document generated online

05-08-2008 DS-230 package sent to NVC

05-15-2008 RFE Need a Palestinian Police certificate in addition to the Israeli Police certificate

06-04-2008 Palestinian Police certificate deliverd to NVC

06-05-2008 CASE COMPLETED

06-10-2008 Case forwarded to Consulate

Jerusalem Consulate

06-16-2008 Medical Appointment/done

07-01-2008 Interview Date

08-03-2008 Me flying to Jerusalem :)

08-28-2008 Arrival at Chicago ORD International

Filed: Timeline
Posted
I think so too, I beleive we are all going to get hit like we did with the receipts, so many went out in January February all one shot...hopefully the same happens with the NOA2's this month!!!!!!!! or beginnning of next not so bad, i guess.

Yes, the NOA1's did all go out like a shot ..... maybe they're just looking at all of our piles of relationship proof, photos, letters etc ..... and plucking up the courage to just work round the clock and approve them all at once (I'm quite happy to send them a jar of coffee to support this effort :lol: ) ..... I think that when they really start, there will be a flood of NOA2's ... instead of the dribble we're getting at the moment.

Another train of thought is ..... they're letting CSC do a bunch and then VSC will do a bunch, that way the NVC isn't too clogged, which would delay us all once again when we get to the next stage.

That is what I am also thinking, they are working the K1 since NVC only keeps it for couple of days and don't do much work with the k1s.

Good thought, the service centres could be alternating between CR1/IR1's and K1's to keep the flow to the NVC bearable for them ..... do we know what's happening on the K1 front at CSC ? ..... are they slowing down on them or speeding up? ..... if they're speeding up, then the time could be coming for VSC to concentrate on our NOA2's .... this could be some form of logic for us at this unsure time.

The K1's do (generally) seem to get banged out quite quickly .... certainly an odd situation .... wish I hadn't got married now :jest: .... we'd be together sooner

From what i am noticing they are both approving many K-1, but it looks like VSC are lately approving late 2007 and ealry 2008 petitions, while CSC are mostly approving Sep-Dec of 2007 peitions for k-1. In short, VSC is ahead in their approvals of K1.

Hmmmm ..... my mind wonders to them maybe giving up the K1's for a while and concentrating on the other piles of relationship proof applications .... i.e. CR1/IR1's ..... if VSC are already dealing with early 2008 K1's, then hopefully they'll run out of them soon and have no choice but to pick up our files and deal with them.

.... I really feel the tide is going to turn .... not yet .... but soon

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...