Hi, im silent reader of this form. When i checked my case status it says this...

Your visa case is currently undergoing necessary administrativeprocessing. This processing can take several weeks. Please follow any instructions provided by the Consular Officer at the time of your interview. If further information is needed, you will be contacted. If your visa application is approved, it will be processed and mailed/available within two business days. Under the U.S. Immigration and Nationality Act, Immigrant Visas for "Diversity Visas" cannot be issued after September 30th of the year in which you were selected to apply for a Diversity Visa. For example, entrants into the Diversity Visa Program in Fall of 2011 were selected for Diversity Visa 2012 Program, and selectees MUST apply and receive their visa prior to September 30, 2012 otherwise they lose eligibility to receive a Diversity Immigrant Visa, regardless of additional administrative processing. In addition, please note that some immigrant visas may not be able to be issued if the annual numerical limit for that category has been reached.

For more information, please visit TRAVEL.STATE.GOV.

I dont understand why they are talking about diversity visa? My interview was 20 september 2011 and im on ap since then. Plz reply...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Pakistan
Timeline

Hi, im silent reader of this form. When i checked my case status it says this...

Your visa case is currently undergoing necessary administrativeprocessing. This processing can take several weeks. Please follow any instructions provided by the Consular Officer at the time of your interview. If further information is needed, you will be contacted. If your visa application is approved, it will be processed and mailed/available within two business days. Under the U.S. Immigration and Nationality Act, Immigrant Visas for "Diversity Visas" cannot be issued after September 30th of the year in which you were selected to apply for a Diversity Visa. For example, entrants into the Diversity Visa Program in Fall of 2011 were selected for Diversity Visa 2012 Program, and selectees MUST apply and receive their visa prior to September 30, 2012 otherwise they lose eligibility to receive a Diversity Immigrant Visa, regardless of additional administrative processing. In addition, please note that some immigrant visas may not be able to be issued if the annual numerical limit for that category has been reached.

For more information, please visit TRAVEL.STATE.GOV.

I dont understand why they are talking about diversity visa? My interview was 20 september 2011 and im on ap since then. Plz reply...

Hum mm.... welcome to the group of waiting in AP indefinately

Link to comment
Share on other sites

Filed: F-1 Visa Country: Pakistan
Timeline

Hum mm.... welcome to the group of waiting in AP indefinately

Guess what every one!!!!!!!

I HAVE GOT IT.

U.S. Department of State

NONIMMIGRANT VISA APPLICATION

Issued

Application ID or Case Number: AA002HI4MP

Case Creation Date: 20-Jul-2012

Response Date: 01-Aug-2012

Your visa is in final processing. If you have not received it in more than 10 working days, please see the webpage for contact information of the embassy or consulate where you submitted your application.

For more information, please visit U.S. Embassy Islamabad.

It took 8 days for me.... I have got my F1 visa here.

I hope every one on the waiting list get their visa Asap.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Congratulations!!!!! Good luck with your studies and remember to keep us all in your prayers!

Guess what every one!!!!!!!

I HAVE GOT IT.

U.S. Department of State

NONIMMIGRANT VISA APPLICATION

Issued

Application ID or Case Number: AA002HI4MP

Case Creation Date: 20-Jul-2012

Response Date: 01-Aug-2012

Your visa is in final processing. If you have not received it in more than 10 working days, please see the webpage for contact information of the embassy or consulate where you submitted your application.

For more information, please visit U.S. Embassy Islamabad.

It took 8 days for me.... I have got my F1 visa here.

I hope every one on the waiting list get their visa Asap.

***UPDATED***

VISAS ISSUED

s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later

Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later

S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later

shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?

a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP

Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks

Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?

Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months

SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?

Faki CR1 (male) September 30th, 2011 -----------visa received 4 months

Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days

RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP

Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP

gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview

bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview

longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview

Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview

RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview

khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview

Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012

Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012

John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview

Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview

Steamcake CR1 July 23 2012 visa approved/waiting on issuance

hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview

PENDING AP

2009 Interviews

SchipM8 K1 Dec 2009 1st interview, May 2011 2nd interview pending AP--- Case sent back to USCIS expired

2010 Interviews

maabish interview CR1 (male) 28 july 2010 pending AP

Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport

2011 Interviews

March

Rafi CR1 (male) March 10th 2011 joint sponsor requested pending AP

Pari786 CR1 (male) March 2 2011 pending AP

May

Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012

Lots of Patience CR1 May 8th 2011 pending AP

khalidnfatima K3 (male) June 15 2009 interview case sent back to USCIS -LOST CASE CLOSED-Refiled CR1 May 13 2011 interview pending AP

June

Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap

July

BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230

Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis

sm2010 CR1 (male) interview on July 12, 2011 pending AP

Austin Guy (Male- 69 yr old father) July 12,2011 pending AP

aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012

September

samranaz CR1 (male) September 9th, 2011 pending AP

Arif Ali K1 (male) Sept 26, 2011 pending AP

s&S88 interview CR1 (male) Sept 28,2011 pending AP (Requested senator help Feb 22th) Embassy emailed to include information about immediate family members and current job info Feb 24th 2012

October

Maila CR1 Oct 6th pending AP

November

Moshin786 K1(male) Nov 28th 2011 pending AP-sent back to USCIS for revocation/ marriage planned in pakistan/Married May 19th Filed CR1 July 9th

December

sajidla IR1 Interview date Dec 19, 2011 Pending AP

MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP

far316 CR1 (female) December 21 2011 pending AP

2012 Interviews

January

Yoursonly CR1 Jan 26th 2012 pending AP

Fahad99 CR1 (male) Jan 30 2012 pending AP

March

mrjanu85-March 9, 2012- pending AP

June

FifiSabz CR1 (male) June 14 2012 AP pending

Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy

Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy

Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy

July

princess18 CR1 (female) July 30 2012 AP pending

Upcoming interviews

Best of luck!

SarahZeeshan CR1 August 29 2012

sn530 K1 (female) Waiting for interview date

Edited by EAbbas

10/02/2010 Nikah/Marriage in Karachi
USCIS JOURNEY
11/10/2010 -Sent
03/24/2011 i 130 approved!!!
NVC JOURNEY
03/30/2011 NVC received case-04/07/2011 NVC Case Number Assigned
05/03/2011 CASE COMPLETE- In Que for INTERVIEW!!-05/17/2011 Received interview letter and info via email
EMBASSY JOURNEY
05/20/2011 Medical Appt/passed
06/15/2011 Interview result AP
06/21/2011 Submitted requested docs..under review
07/25/2011 CO called did phone interview result: PENDING MANDATORY AP/CO told us they have to do namechecks

03/07/2013 Case returned to USCIS waiting for NOIR/reaffirmation

04/18/2013 USCIS received case for review

08/19/2013 Received NOIR to respond by 9/18/2013

9/9/2013 Responded to NOIR/USCIS received documents awaiting response

9/20/2013 USCIS reaffirmed sent to embassy

1/04/14 Case opened for review

8/31/15 Interview- no questions visa approved on the spot

9/8/15 visa status issued

9/10/15 visa received

9/19/15 POE Charlotte

p9WGm4.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Did anyone else got this message about diversity visa.. Im just worried about why they have talked about it...n ebbas can u plz add me on this tracker... Cr1 (male) september 20 interview.ap since than.

Yeah sure.. ill add you as well...

I think this is such a new system there will be glitches in it but i think i would call and be sure they have you listed as CR1 visa not diversity visa.

You can call DOS or the embassy (but its most difficult to talk to someone at the embassy) Just have them verify what you have applied for and tell them the online visa checking says something different.

Don't worry... evthing will be ok.. DOS once told me my husband was an f visa.. i had to correct them and tell them no its a cr1.

10/02/2010 Nikah/Marriage in Karachi
USCIS JOURNEY
11/10/2010 -Sent
03/24/2011 i 130 approved!!!
NVC JOURNEY
03/30/2011 NVC received case-04/07/2011 NVC Case Number Assigned
05/03/2011 CASE COMPLETE- In Que for INTERVIEW!!-05/17/2011 Received interview letter and info via email
EMBASSY JOURNEY
05/20/2011 Medical Appt/passed
06/15/2011 Interview result AP
06/21/2011 Submitted requested docs..under review
07/25/2011 CO called did phone interview result: PENDING MANDATORY AP/CO told us they have to do namechecks

03/07/2013 Case returned to USCIS waiting for NOIR/reaffirmation

04/18/2013 USCIS received case for review

08/19/2013 Received NOIR to respond by 9/18/2013

9/9/2013 Responded to NOIR/USCIS received documents awaiting response

9/20/2013 USCIS reaffirmed sent to embassy

1/04/14 Case opened for review

8/31/15 Interview- no questions visa approved on the spot

9/8/15 visa status issued

9/10/15 visa received

9/19/15 POE Charlotte

p9WGm4.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

***UPDATED***

VISAS ISSUED

s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later

Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later

S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later

shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?

a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP

Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks

Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?

Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months

SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?

Faki CR1 (male) September 30th, 2011 -----------visa received 4 months

Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days

RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP

Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP

gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview

bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview

longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview

Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview

RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview

khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview

Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012

Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012

John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview

Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview

Steamcake CR1 July 23 2012 visa approved/waiting on issuance

hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview

PENDING AP

2009 Interviews

SchipM8 K1 Dec 2009 1st interview, May 2011 2nd interview pending AP--- Case sent back to USCIS expired

2010 Interviews

maabish interview CR1 (male) 28 july 2010 pending AP

Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport

2011 Interviews

March

Rafi CR1 (male) March 10th 2011 joint sponsor requested pending AP

Pari786 CR1 (male) March 2 2011 pending AP

May

Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012

Lots of Patience CR1 May 8th 2011 pending AP

khalidnfatima K3 (male) June 15 2009 interview case sent back to USCIS -LOST CASE CLOSED-Refiled CR1 May 13 2011 interview pending AP

June

Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap

July

BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230

Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis

sm2010 CR1 (male) interview on July 12, 2011 pending AP

Austin Guy (Male- 69 yr old father) July 12,2011 pending AP

aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012

September

samranaz CR1 (male) September 9th, 2011 pending AP

WaitingAP (male) CR1 Sept 20 2012/pending AP

Arif Ali K1 (male) Sept 26, 2011 pending AP

s&S88 interview CR1 (male) Sept 28,2011 pending AP (Requested senator help Feb 22th) Embassy emailed to include information about immediate family members and current job info Feb 24th 2012

October

Maila CR1 Oct 6th pending AP

November

Moshin786 K1(male) Nov 28th 2011 pending AP-sent back to USCIS for revocation/ marriage planned in pakistan/Married May 19th Filed CR1 July 9th

December

sajidla IR1 Interview date Dec 19, 2011 Pending AP

MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP

far316 CR1 (female) December 21 2011 pending AP

2012 Interviews

January

Yoursonly CR1 Jan 26th 2012 pending AP

Fahad99 CR1 (male) Jan 30 2012 pending AP

March

mrjanu85-March 9, 2012- pending AP

June

FifiSabz CR1 (male) June 14 2012 AP pending

Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy

Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy

Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy

July

princess18 CR1 (female) July 30 2012 AP pending

Upcoming interviews

Best of luck!

SarahZeeshan CR1 August 29 2012

sn530 K1 (female) Waiting for interview date

10/02/2010 Nikah/Marriage in Karachi
USCIS JOURNEY
11/10/2010 -Sent
03/24/2011 i 130 approved!!!
NVC JOURNEY
03/30/2011 NVC received case-04/07/2011 NVC Case Number Assigned
05/03/2011 CASE COMPLETE- In Que for INTERVIEW!!-05/17/2011 Received interview letter and info via email
EMBASSY JOURNEY
05/20/2011 Medical Appt/passed
06/15/2011 Interview result AP
06/21/2011 Submitted requested docs..under review
07/25/2011 CO called did phone interview result: PENDING MANDATORY AP/CO told us they have to do namechecks

03/07/2013 Case returned to USCIS waiting for NOIR/reaffirmation

04/18/2013 USCIS received case for review

08/19/2013 Received NOIR to respond by 9/18/2013

9/9/2013 Responded to NOIR/USCIS received documents awaiting response

9/20/2013 USCIS reaffirmed sent to embassy

1/04/14 Case opened for review

8/31/15 Interview- no questions visa approved on the spot

9/8/15 visa status issued

9/10/15 visa received

9/19/15 POE Charlotte

p9WGm4.png

Link to comment
Share on other sites

Thank you ebbas.. I have called DOS n i spoke to a lady n i mentioned about the message and she said did u applied for diversity visa and ofcourse i said no then she said it just a typo.. But i still wanted to share and ask this info if anyone had this message or is it just me. N thank you once again ebbas u have bern real help with a lot of people here in this fourm.. May allah grant ur all wishes and get ur visa issued soon :-)

Link to comment
Share on other sites

Filed: Country: Pakistan
Timeline

Guess what every one!!!!!!!

I HAVE GOT IT.

U.S. Department of State

NONIMMIGRANT VISA APPLICATION

Issued

Application ID or Case Number: AA002HI4MP

Case Creation Date: 20-Jul-2012

Response Date: 01-Aug-2012

Your visa is in final processing. If you have not received it in more than 10 working days, please see the webpage for contact information of the embassy or consulate where you submitted your application.

For more information, please visit U.S. Embassy Islamabad.

It took 8 days for me.... I have got my F1 visa here.

I hope every one on the waiting list get their visa Asap.

Congratulation!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I called DOS today to check and see if Ahmed is scheduled for a new interview after our case was sent back to the embassy. If you guys remember we had appealed the Notice of intent to Revoke(NOIR) and won our appeal. The lady at DOS says our case is back in AP. I expected Ahmed to be called for an interview and then we would have AP after that.

I am very sad to see our case back in AP. That means there is no telling how long we will have to wait.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Guess what every one!!!!!!!

I HAVE GOT IT.

U.S. Department of State

NONIMMIGRANT VISA APPLICATION

Issued

Application ID or Case Number: AA002HI4MP

Case Creation Date: 20-Jul-2012

Response Date: 01-Aug-2012

Your visa is in final processing. If you have not received it in more than 10 working days, please see the webpage for contact information of the embassy or consulate where you submitted your application.

For more information, please visit U.S. Embassy Islamabad.

It took 8 days for me.... I have got my F1 visa here.

I hope every one on the waiting list get their visa Asap.

Congrats and good luck on your studies...

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

When they do name checks do they do them on the individuals involved in the application process or is it done on the immediate family members or both? The reason why I am asking is because during my wife's second interview the CO took the names of all her sisters and brother-in-laws.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Hello everyone! I thought I should come out of hiding and say 'Hi' now. As you can imagine, being a female and our case going all smoothly all the way, Alhumdulillah, this happening now - being put in AP - was a bit of a surprise. My interview was very smooth and very brief. We had front-loaded our application so I could see the CO already flipping through all the relationship evidence and pictures before she even called me up to the window. Right when I was expecting her to say, "You're approved...", she reached for a green slip and handed it to me, telling me they needed more time on our case and that she couldn't give me any idea of how long it could take.

Hubby and I have been taken aback...he's coming to visit me in a week, after 11 months of being apart, and the plan was to take me back with him in early September, where he's starting a new job and we were to set up house together. But we do not know what Allah Knows and Plans for us... just hoping it'll be over soon.

I will put up a detailed account of my interview experience here for everyone soon, Insha'Allah.

Much love and thank you for making this thread...keeps everyone united! May we all be rejoined with our spouses... very, very soon. Ameen. :)

Edited by princess18

Priority date: 14th October 2011

NOA 2: 23rd March 2012

Case Complete at NVC: 29th May 2012

Interview schedule for 30th July 2012 > Result: Administrative Processing / Green slip 221(g)

AP ended on 29th August - Passport in hand!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Pakistan
Timeline

Hello everyone! I thought I should come out of hiding and say 'Hi' now. As you can imagine, being a female and our case going all smoothly all the way, Alhumdulillah, this happening now - being put in AP - was a bit of a surprise. My interview was very smooth and very brief. We had front-loaded our application so I could see the CO already flipping through all the relationship evidence and pictures before she even called me up to the window. Right when I was expecting her to say, "You're approved...", she reached for a green slip and handed it to me, telling me they needed more time on our case and that she couldn't give me any idea of how long it could take.

Hubby and I have been taken aback...he's coming to visit me in a week, after 11 months of being apart, and the plan was to take me back with him in early September, where he's starting a new job and we were to set up house together. But we do not know what Allah Knows and Plans for us... just hoping it'll be over soon.

I will put up a detailed account of my interview experience here for everyone soon, Insha'Allah.

Much love and thank you for making this thread...keeps everyone united! May we all be rejoined with our spouses... very, very soon. Ameen. :)

dont worry about it too much, maybe they just needed some time to review the documents you submitted and get the visa processed.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...