Jump to content
Navyk

CSC - NOA2 to NVC Delay

 Share

886 posts in this topic

Recommended Posts

Filed: Lift. Cond. (apr) Country: India
Timeline

Just got SIF on the sign in page. Looks like the AOS Invoice is being updated into the system

Also, I finally was able to update my signature!

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Just got SIF on the sign in page. Looks like the AOS Invoice is being updated into the system

Also, I finally was able to update my signature!

Nice one Dave, I also have SIF at the moment its been like it for about 1hr now.

Seems you have made up some time, I have been waiting 5 days for this.

Filling for CR1 Visa

USCIS: I-130 CSC

03/18/2011 - Mailed I-130

03/21/2011 - I-130 signed for at Chicago Lockbox

03/24/2011 - NOA1 California Service Center

03/29/2011 - NOA1 hard copy received

06/29/2011 - NOA2 Received

07/05/2011- NOA2 hard copy received

Your I-130 was approved in 97 days from your NOA1 date.

NVC

07/26/2011 - Case received by NVC

08/01/2011 - Received NVC Case # and IIN

08/01/2011 - Emailed DS-3032

08/03/2011 - Emailed DS-3032 (Again, noticed an error on the first one)

08/08/2011 - AOS Bill generated and PAID

08/08/2011 - NVC received DS-3032

08/09/2011 - AOS Status changed to paid - cover page printed

08/09/2011 - IV Bill generated and PAID

08/10/2011 - IV Status changed to paid - cover page printed

08/10/2011 - IV Package Sent

08/11/2011 - IV Package Delivered

08/15/2011 - AOS Package Sent

08/16/2011 - AOS Package Delivered

08/18/2011 - IV Package Approved

08/18/2011 - False RFE for AOS package

08/23/2011 - AOS Package Approved

08/23/2011 - CASE COMPLETE!

Case completed 55 days from your NOA2 date.

08/25/2011 - Interview date assigned

10/05/2011 - Interview - APPROVED

10/07/2011 - Visa Received

10/09/2011 - POE San Francisco

Finally complete in 205 days !! 6 Months 3 Weeks

Link to comment
Share on other sites

Dave let me know if you get a response on the choice of agent email. With us having such a big issue with just being able to get that AOS bill I'm trying to make sure I'm not sitting here waiting for the email to get accepted and have it not actually happen. You sent yours a day after I did so keep me posted please :D

10-16-2010 Married

03-17-2011 I-130 sent

03-19-2011 I-130 received

03-23-2011 NOA1

03-25-2011 Touch

06-16-2011 NOA2

07-18-2011 NVC Received

07-19-2011 Emailed DS 3032

07-29-2011 Emailed DS 3032 AGAIN-still no response

08-03-2011 AOS Bill Generated

08-03-2011 AOS Bill Paid

08-03-2011 Emailed DS 3032 Yet Again!!!

08-05-2011 Mailed AOS packet

08-08-2011 AOS packet delivered

08-08-2011 DS 3232 accepted

08-09-2011 IV Bill Generated/Paid

08-10-2011 IV marked PAID

08-10-2011 IV packet Mailed

08-11-2011 IV packet delivered

08-16-2011 AOS package processed

08-22-2011 IV packet processed

08-22-2011 SIF/Case Closed

08-25-2011 Interview date received

10-13-2011 Interview-APPROVED

l198oyeua.png

d1emrulw6.png

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Nice one Dave, I also have SIF at the moment its been like it for about 1hr now.

Seems you have made up some time, I have been waiting 5 days for this.

Yes. I had it about an hour or so ago. More like 45-50 minutes ago.

I hope I did make up some time. It would be nice after how long I had to wait for NVC to get our file.

Dave let me know if you get a response on the choice of agent email. With us having such a big issue with just being able to get that AOS bill I'm trying to make sure I'm not sitting here waiting for the email to get accepted and have it not actually happen. You sent yours a day after I did so keep me posted please :D

I sure will.

I have both mine and my wife's e-mail synced to my cell phone. As soon as she gets anything from NVC I get the message on my phone. I'm prepared from both sides.

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

I had SIF since this morning 9 am central time. so just waiting...

USCIS: (90 days)

3/23/11 - Fedex to Chicago

3/31/11 - NOA1 Hard Copy

6/29/11 - NOA2 Email

7/02/11 - NOA2 Hard Copy

NOA2 to NVC (35 days to get Case number)

NVC: (xx days)

8/03/11 - NVC Case Number & IIN

8/03/11 - E-mail address given to NVC

8/03/11 - DS-3032 Email sent to NVC

8/05/11 - DS-3032 generated by E-mail

8/06/11 - AOS/I-864 Fee Bill Received

8/07/11 - AOS/I-864 Fee Bill Paid (Status: In process)

8/08/11 - DS-3032 received by NVC (E-mail confirmation)

8/09/11 - IV Fee Bill Received

8/09/11 - IV Fee Bill Paid (Status: In process)

8/09/11 - AOS/I-864 Fee Bill Paid (Status: Paid)

8/10/11 - I-864 package sent by Fedex

8/10/11 - IV Fee Bill Paid(Status: Paid)

8/10/11 - DS-230 package sent by Fedex

8/11/11 - I-864 package received by NVC 9:46 am

8/11/11 - DS-230 package received by NVC 9:46 am

8/22/11 - NVC case completed ....

11/03/11 - Interview in Mumbai

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

I will be taking the advice Dave gave on another thread and not rely on the AVR. I plan to start calling the operators on Monday.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

hi...i've emailed the choice of agent couple days ago but haven't got any reply yet from NVC.

But NVC keep sending ds-3032 kit to my husband's email and ask him to send the ds 3032 immediately. Should i email the choice of agent thru his email?? all the instructions going to his email(since he forgot to give my email address to NVC, he only gave his :unsure: )

Edited by Icha

USCIS

14-02-2011 sent I-130 petition for my case and my son's case

07-07-2011 approved! (139 days)

NVC

03-08-2011 NVC received

03-08-2011 received NVC case # and IIN for my case

25-08-2011 received NVC case # for my son's case

01-09-2011 sent aos packages

07-09-2011 sent IV packages

13-09-2011 1st checklist

17-09-2011 2nd checklist with different request

20-09-2011 sent out the checklist requested

28-09-2011 CC for my case

01-10-2011 Received P4 for interview date on November 22

05-10-2011 CC for my son's case

08-10-2011 received P4 for son's case

Consulate

07-11-2011 Medical

09-11-2011 picked up the result, everything is good, thanks god!

22-11-2011 Visa APPROVED!

28-11-2011 Pick up the visa

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

I will be taking the advice Dave gave on another thread and not rely on the AVR. I plan to start calling the operators on Monday.

Yes.

I am an example of this. I got my case number and IIN last Wed. I just called and it's still not updated..."We have no record of your case"

NVC #- 1-603-334-0700. As soon as the phone engages push 1 and 5 to go straight to the operators.

Best times to call are very early in the morning 8-9 am EST and 10 PM to 12 AM EST.

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

hi...i've emailed the choice of agent couple days ago but haven't got any reply yet from NVC.

But NVC keep sending ds-3032 kit to my husband's email and ask him to send the ds 3032 immediately. Should i email the choice of agent thru his email?? all the instructions going to his email(since he forgot to give my email address to NVC, he only gave his :unsure: )

You NEED to exchange your e-mail with NVC. It must be in their system so they can verifiy that it is you and indeed your e-mail account.

NVC can not and will not accept it from the petitioner's e-mail address.

You have two options now.

1. Have your husband call NVC and have him exchange your e-mail address with them. You can then send out the DS-3032 e-mail to them as soon as that is done.

2. You mail in a physcial hard copy of the DS-3032.

I suggest doing number 1 to save days in this process.

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Best times to call are very early in the morning 8-9 am EST and 10 PM to 12 AM EST.

Thanks for the time indexes!

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Thanks for the time indexes!

No Problem.

I really recommend the late evening hours. They are very fast to pick up. You don't hear elevator music at all.

You should call tonight for a practice trial run! lol

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

You NEED to exchange your e-mail with NVC. It must be in their system so they can verifiy that it is you and indeed your e-mail account.

NVC can not and will not accept it from the petitioner's e-mail address.

You have two options now.

1. Have your husband call NVC and have him exchange your e-mail address with them. You can then send out the DS-3032 e-mail to them as soon as that is done.

2. You mail in a physcial hard copy of the DS-3032.

I suggest doing number 1 to save days in this process.

Thanks Dave, i've had my husband called the NVC and exchange my email address, about going to re send the DS-3032 e mail...the DS-3032 (choice of agent) email is the format that VJ provided here right..? not the DS-3032 form that i have to sign??

Oh yes,she also told my husband the reason of the delay, it's because they just moved into new building, we haven't got my kid's case # yet, but she promised she'll do her best to find the file and put it together with mine and giving out his case # asap :yes:

USCIS

14-02-2011 sent I-130 petition for my case and my son's case

07-07-2011 approved! (139 days)

NVC

03-08-2011 NVC received

03-08-2011 received NVC case # and IIN for my case

25-08-2011 received NVC case # for my son's case

01-09-2011 sent aos packages

07-09-2011 sent IV packages

13-09-2011 1st checklist

17-09-2011 2nd checklist with different request

20-09-2011 sent out the checklist requested

28-09-2011 CC for my case

01-10-2011 Received P4 for interview date on November 22

05-10-2011 CC for my son's case

08-10-2011 received P4 for son's case

Consulate

07-11-2011 Medical

09-11-2011 picked up the result, everything is good, thanks god!

22-11-2011 Visa APPROVED!

28-11-2011 Pick up the visa

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Thanks Dave, i've had my husband called the NVC and exchange my email address, about going to re send the DS-3032 e mail...the DS-3032 (choice of agent) email is the format that VJ provided here right..? not the DS-3032 form that i have to sign??

Oh yes,she also told my husband the reason of the delay, it's because they just moved into new building, we haven't got my kid's case # yet, but she promised she'll do her best to find the file and put it together with mine and giving out his case # asap :yes:

Yes, use the format that is found on VJ.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Both I-864 and DS-230 packets are printed and ready to go.

NVC case number has been written on each page and the only thing left to do is to print off the invoice barcodes, print out a new dated cover sheet for both packets and to sign the documents that need to be signed with the correct date.

NVC...hurry up with the invoices! :)

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Both I-864 and DS-230 packets are printed and ready to go.

NVC case number has been written on each page and the only thing left to do is to print off the invoice barcodes, print out a new dated cover sheet for both packets and to sign the documents that need to be signed with the correct date.

NVC...hurry up with the invoices! :)

Did you get your police clearance certificate?

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...