Hey guys

I am making this thread to see which any one of us gets interview assigned between today and April.A lot of cases were completed yesterday and today so lets see who gets luckier first to get their interview date assigned.

Also please share if you called NVC to schedule an interview and if it worked out.Because that can help other members just like you and me.

Thanks

Mar 4,06 I-130 sent ,rcvd Mar 7,06

Oct 24,08 USC, called to Upgrade

Nov 1,08 Citizenship certificate sent

Jan 3,09 Case upgraded.

Jan 6,09 TOUCHED!!!

Feb 13,09 Approved : )

Feb 20,09 Case # assigned

Mar 2,09 bill paid online,DS-3032 emailed

Mar 4,09 NVC recvd fee

Mar 10,09 AOS sent

Mar 30,09 mailed DS-230

Apr 13,09 CASE COMPLETED(per operators)

Apr 20,09 FINAL REVIEW

Apr 21,09 CASE COMPLETED (per AVR)

Apr 23,09 called:INTERVIEW JUNE 24th

Jun 24,09 AP, 1-3 months

Calling DOS begins,here is what I was told

Jul 7,09 No info @ DOS

Jul 10,09 Case sent to DC-pending

Jul 17,09 Pending

Jul 24,09 Pending,you can call every day for update but the day they call him for passport it means something is up so you get to know it before we do

Jul 31,09 Pending AP

Aug 06,09 Call from USEM requesting to submit passport

Aug 07,09 Every thing looks very good,visa issuance is up to the consulate!!!

Aug 07,09 Passport submitted

Aug 07,09 USEM is requesting applicant's passport :)

Aug 17,09-call 1 Visa issued Aug 3rd,EM recvd passport on 10th but still havent returned it

Aug 17,09-call 2 Case pending some kind of processing (URGHHHHHHHHH NOT AGAIN)

Aug 18,09 call to pick up passport,picked up from AMEX

Sep 26,09 REUNION :)

Link to comment
Share on other sites

  • Replies 1.1k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

Filed: Citizen (pnd) Country: India
Timeline

I kept looking for this thread... didn't realize it was on first page..

I am in for the June interview... Chennai Embassy already posted May interview and I definitely don't have one in May :)

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Link to comment
Share on other sites

I kept looking for this thread... didn't realize it was on first page..

I am in for the June interview... Chennai Embassy already posted May interview and I definitely don't have one in May :)

I am still hoping for May interview!

Don't give up hope!

USCIS JOURNEY

14-Sep-08 Sent I-130

23-Sep-08 Recieved NOA1

28-Oct-08 Received NOA1

09-Feb-09 Received RFE for I-130

16-Feb-09 Sent Evidence for I-130

26-Feb-09 Received email NOA2 Approved!

28-Feb-09 Received Approval notice for I-130

NVC JOURNEY

12-Mar-09 NVC Received File

17-Mar-09 Emailed DS 3032 to NVC

28-Mar-09 Received DS3032 and AOS Bill via email

28-Mar-09 Paid AOS Bill online - Status = In Process

29-Mar-09 Emailed scanned DS3032 & posted via snail mail

30-Mar-09 Received email that DS3032 was received by NVC and that IV Bill will be sent

31-Mar-09 Paid IV Bill

31-Mar-09 AOS Bill Status = PAID !!!

06-Apr-09 Hubby posted DS230 and AOS priority and certified

08-Apr-09 @11:04am - Item Delivered PORTSMOUTH NH 03801 04/08/09 11:02am

10-Apr-09 NVC AVR states documents received

17-Apr-09 AVR states Case Complete at NVC!!!

21-Apr-09 Expedite request approved

24-Apr-09 Case sent from NVC to Sydney Consulate

29-Apr-09 Medical Appointment - Passed, YIPPEE and Thank You God !

05-May-09 Interview scheduled at Sydney Consulate APPROVED!!!

16-May-09 - Arrived in USA!!!!

20-May-09 Got my SSN.

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: India
Timeline
I kept looking for this thread... didn't realize it was on first page..

I am in for the June interview... Chennai Embassy already posted May interview and I definitely don't have one in May :)

I am still hoping for May interview!

Don't give up hope!

Well, in my case, embassy already posted May schedule on their website, so May interview for me is out of question. I just hope we get one of the June slots. Operators both times were not very affirmative about June schedule, they kept saying "We don't know when.."

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Link to comment
Share on other sites

Filed: K-3 Visa Country: Lebanon
Timeline

Hi all, Count me in :) We will most likely have a June interview for our CR1. Good luck to all of us waiting for case completion at NVC! Unless flipping of our K3 is successful. Either way I believe we are looking at a late May/Early June interview for K3. We will know more soon once embassy received our file and schedules our K3 interview. K3 still travelling on the DHL website :P

Edited by GS4EVER

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Even tho my case hasnt been completed yet, I'm thinking if it does get completed by tomorrow, I still have my K3 interview date assigned for April 30th, and I'm sooo gonna try to change it so I can use that date for my CR1 interview. If it doesn't work or if I get a RFE then I'm really hoping for the June interview :)

----------------------------------------------

Our Timeline:

(California Service Center)

I-129F and I-130

11/23/08 - I-130 sent

12/16/08 - I-129F sent

02/23/09 - NOA2 I-130

02/23/09 - NOA2 I-129F

CR1 Process on NVC:

03/03/09 - NVC received papers

03/05/09 - NVC number assigned

03/09/09 - NVC generated DS 3032 and AOS bill

03/10/09 - E-mailed and mailed DS 3032

03/13/09 - Paid for AOS bill

03/18/09 - Choice of agent accepted by e-mail

03/20/09 - Got e-mail with IV bill

03/20/09 - Paid for IV bill

03/25/09 - Sent the IV DS-230 packet by mail direct from beneficiary's country

03/28/09 - Sent the AOS packet by mail

04/01/09 - AOS packet delivered at NVC

04/08/09 - DS-230 Packet delivered at NVC ( I don't know why that long it was stuck at Customs for like 2 weeks!!!)

04/09/09 - AVR says it's missing the DS-230 (False RFE)

04/09/09 - AOS approved

04/10/09 - DS 230 entered into the system, probably under review now.

04/13/09 - AVR says "The NVC has received the checklist letter response on April 10th"

04/20/09 - Case Completed at NVC

04/24/09 - Got e-mail with the appointment letter

Consular Process

05/26/09 - Medical Exam

06/03/09 - Interview Date!!!! PASSED!!

06/06/09 - Received passport and the Big Brown Envelope

06/24/09 - POE

-----------------------------------------------

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: India
Timeline

I thought I'd feel little better after case completion. But my excitement of case completion lasted for about 24 hours and I am back to being bored. :unsure: Mann!!! This wait is getting to every single bone of my body!!! I know I know, I am being impatient. My husband tells me that everyday ;)

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Link to comment
Share on other sites

Filed: K-3 Visa Country: Lebanon
Timeline
I kept looking for this thread... didn't realize it was on first page..

I am in for the June interview... Chennai Embassy already posted May interview and I definitely don't have one in May :)

I am still hoping for May interview!

Don't give up hope!

I am still hoping for May too Corinne :star: Let's cross those fingers super tight!

Even tho my case hasnt been completed yet, I'm thinking if it does get completed by tomorrow, I still have my K3 interview date assigned for April 30th, and I'm sooo gonna try to change it so I can use that date for my CR1 interview. If it doesn't work or if I get a RFE then I'm really hoping for the June interview :)

That is what we are hoping to do as well. Good luck to u :star:

I thought I'd feel little better after case completion. But my excitement of case completion lasted for about 24 hours and I am back to being bored. :unsure: Mann!!! This wait is getting to every single bone of my body!!! I know I know, I am being impatient. My husband tells me that everyday ;)

I don't blame u at all! I feel the same way, thus occupying myself with the tracking of our K3 on the DHL website he he :P

NVC Journey: Finally OVER APRIL 21, 2009!!! INTERVIEW PASSED 05/12/09; VISA IN HAND 05/20/09

03/05/09: K3 and I 130 both approved! FINALLY after 230 emotionally trying days @ VSC!!

03/06/2009 : NVC Received; 03/09/09 Case Number Assigned; 03/10/09 K3 stuck in AP

03/17/2009 : AOS/IV fee bills generated (by email @ 10:00 p.m.); 03/18/2009 : AOS/IV fee bills paid online

03/27/2009 : AOS/DS 230 package sent to NVC; 04/02/2009 : AOS & DS-230 entered into NVC system

04/14/2009 : Found out K3 was forwarded to the consulate in Leb and CR1 stuck in AP; 04/18/09: K3 delivered

04/20/09: WOOHOO CR1 already out of AP; DS 230/AOS accepted with no RFEs!! Sign in failed on NVC payment site.

04/21/09: MAGIC CASE COMPLETE @ 4:30 P.M. THANK U GOD!!!

04/27/09: Hubby passed his medical; CR1 interview assigned for June 17th By NVC; but changed to MAY 12th after emailing embassy on 05/05/09 )

an1cET10g410530MDAwMzExOGx8MDAwMDU1NGRhfEFwcHJvdmVkLyBXYWl0aW5nIDQgUmV1bmlvbiE.gif

Interview Passed 05/12/09!!! Visa in hand 05/20/09!!! POE: 05/23/09

as1cEY00g410500MDA0NDZzfDAwMDk3c3xUaWxsIDFzdCB3ZWRkaW5nIGFubml2ZXJzYXJ5.gif

REUNITED JUST IN TIME FOR MY BDAY AND WEDDING ANNIVERSARY!!!! PRAISE BE TO GOD!

Link to comment
Share on other sites

count me in, the nvc said they recived a mail.....which is my mail on 15th april, so lets pray for no RFE's and hope for an early june interview...champi, ohh my hubby keeps telling me that toooooooo im getting impatient!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline
That is what we are hoping to do as well. Good luck to u :star:

GS4EVER, it's been a while since your DS230 is under review right? Do you have any updates from talking to one of the operators?

----------------------------------------------

Our Timeline:

(California Service Center)

I-129F and I-130

11/23/08 - I-130 sent

12/16/08 - I-129F sent

02/23/09 - NOA2 I-130

02/23/09 - NOA2 I-129F

CR1 Process on NVC:

03/03/09 - NVC received papers

03/05/09 - NVC number assigned

03/09/09 - NVC generated DS 3032 and AOS bill

03/10/09 - E-mailed and mailed DS 3032

03/13/09 - Paid for AOS bill

03/18/09 - Choice of agent accepted by e-mail

03/20/09 - Got e-mail with IV bill

03/20/09 - Paid for IV bill

03/25/09 - Sent the IV DS-230 packet by mail direct from beneficiary's country

03/28/09 - Sent the AOS packet by mail

04/01/09 - AOS packet delivered at NVC

04/08/09 - DS-230 Packet delivered at NVC ( I don't know why that long it was stuck at Customs for like 2 weeks!!!)

04/09/09 - AVR says it's missing the DS-230 (False RFE)

04/09/09 - AOS approved

04/10/09 - DS 230 entered into the system, probably under review now.

04/13/09 - AVR says "The NVC has received the checklist letter response on April 10th"

04/20/09 - Case Completed at NVC

04/24/09 - Got e-mail with the appointment letter

Consular Process

05/26/09 - Medical Exam

06/03/09 - Interview Date!!!! PASSED!!

06/06/09 - Received passport and the Big Brown Envelope

06/24/09 - POE

-----------------------------------------------

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: India
Timeline

Any updates from anyone?

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

me too got case approved on the 13th calling today to see if i got an interview yet

USCIS PROCESS

CONSULATE: BOGOTA, COLOMBIA

SERVICE CENTER: CSC( transferred from VSC)

12/02/2008 I-130 sent to Chicago

12/03/2008 I-130 received

12/10/2008 NOA1

01/15/2009 transfer to CSC

01/17/2009 touched

01/19/2009 touched

01/23/2009 touched

02/11/2009 touched

02/12/2009 received email with approved NOA2 as of 02/11

NVC

02/18/2009 NVC Assigned Case Number BGT2009XXXXXX

02/28/2009 DS-3032 Generated

03/09/2009 AOS Bill Generated

03/10/2009 AOS Bill Paid

03/16/2009 DS 3032 Emailed and mailed

03/20/2009 IV Bill Generated

03/20/2009 I-864 package mailed via UPS ground

03/23/2009 IV Package mailed via USPS express

03/24/2009 NVC recieves both packages

04/12/2009 NVC Accepts both packages

05/11/2009 NVC Assigns interview 8 JUN 2009

05/12/2009 NVC sends case to embassy in Bogota, CO

05/13/2009 Embassy recieves case in BOGOTA

06/08/2009 Interview , 221g expedited slip requesting documentation of spouse prior visit to U.S.

06/11/2009 2nd interview VISA APPROVED!!!!!

06/16/2009 VISA IN HAND

07/01/2009 POE ORLANDO

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Hey guys....

I started this thread and no one replied so I stopped checking it.But now here we are.... all together.

Did any one try to call to see if they got an interview date.

I called day before yesterday and the operator said "Check back next week if we have an interview date for you".

Called today and lady said"We just completed ur case Apr 13th(i know) and we are not scheduling till second week of May(fine:( )"

But i will still call on tuesday or wednesday to check.I am so hooked on calling NVC to get my status,I cant help it,even after my case is complete.LOL

To my surprise, AVR still has old crappy recording and doesnt say my case was completed, but who cares abt AVR now...

Mar 4,06 I-130 sent ,rcvd Mar 7,06

Oct 24,08 USC, called to Upgrade

Nov 1,08 Citizenship certificate sent

Jan 3,09 Case upgraded.

Jan 6,09 TOUCHED!!!

Feb 13,09 Approved : )

Feb 20,09 Case # assigned

Mar 2,09 bill paid online,DS-3032 emailed

Mar 4,09 NVC recvd fee

Mar 10,09 AOS sent

Mar 30,09 mailed DS-230

Apr 13,09 CASE COMPLETED(per operators)

Apr 20,09 FINAL REVIEW

Apr 21,09 CASE COMPLETED (per AVR)

Apr 23,09 called:INTERVIEW JUNE 24th

Jun 24,09 AP, 1-3 months

Calling DOS begins,here is what I was told

Jul 7,09 No info @ DOS

Jul 10,09 Case sent to DC-pending

Jul 17,09 Pending

Jul 24,09 Pending,you can call every day for update but the day they call him for passport it means something is up so you get to know it before we do

Jul 31,09 Pending AP

Aug 06,09 Call from USEM requesting to submit passport

Aug 07,09 Every thing looks very good,visa issuance is up to the consulate!!!

Aug 07,09 Passport submitted

Aug 07,09 USEM is requesting applicant's passport :)

Aug 17,09-call 1 Visa issued Aug 3rd,EM recvd passport on 10th but still havent returned it

Aug 17,09-call 2 Case pending some kind of processing (URGHHHHHHHHH NOT AGAIN)

Aug 18,09 call to pick up passport,picked up from AMEX

Sep 26,09 REUNION :)

Link to comment
Share on other sites

Hi everybody!!

Finally Case complete! :yes: i'm here....!! There's no chances 4 me on may, but JUNE :energy: JUNE must be my lucky month.... :dance: Lucky for ALL of US !! :thumbs:

Embassy Journey

06-08-2009 - 1° Interview Cool :) THANKS GOD!!!

06-15-2009 - 2° Interview :) APPROVED!! Yeess!! THANK YOU GOD!!!!

06-17-2009 -Visa is Ready!!

07-12-2009 -US Entry con mi esposo!!! :)

as1cA8hag2B0610MTA3NjUwc3wyMDY5NjRzfExvIG1lam9yIHEgaGEgcGFzYWRvIGVuIG1pIHZpZGE.gif

event.png

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Malta
Timeline

hi all... got case complete on the 17th as well.... hopefully June will bring us all some luck!! :)

N400 sent : 2012-10-27

Check Cashed : 2012-11-05

Bio Appointment : 2012-11-23

Walk-In Biometrics : 2012-11-14

Interview Appointment : 2013-04-12

Approved : 2013-04-12

Oath Ceremony : 2013-06-28

as1cCET0g410010MjA0MDk1c3wwMTMxbHxTaW5jZ

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...